Pw Central Yard (1525 Alcazar St) (Ab 802)
Repair Services (Vehicle, Shoe, Locksmith, etc.) in California, CA · 1525 Alcazar Street, Los Angeles · 90033
At a glance
Pw Central Yard (1525 Alcazar St) (Ab 802) is a 200,766-square-foot repair services (vehicle, shoe, locksmith, etc.) building at 1525 Alcazar Street, Los Angeles in Los Angeles, California, built in 1910. In its 2023 California benchmarking disclosure it reported a site energy-use intensity of 12.5 kBtu/ft² and 179 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2023
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 12.5 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 179 tCO₂e |
| GHG intensity | 0.9 kgCO₂e/ft² |
| Electricity | 737,912 kWh |
| Gross floor area | 200,766 sq ft |
| Source record | california:17978869:2023 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2023latest | — | 12.5 kBtu/ft² | 179 tCO₂e | |
| 2022 | — | 13.4 kBtu/ft² | 182 tCO₂e | |
| 2021 | — | 13.2 kBtu/ft² | 155 tCO₂e | |
| 2020 | — | 13.2 kBtu/ft² | 166 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 1525 Alcazar Street, Los Angeles
- City
- California
- State
- California
- ZIP
- 90033
- Coordinates
- 34.06383, -118.20510
Within ~1 km
Nearby benchmarked buildings
Hospital (General Medical & Surgical) · 3,980,553 sq ft
- Health Sciences Campus (Hsc)score —
College/University · 2,506,286 sq ft
Parking · 909,149 sq ft
Hospital (General Medical & Surgical) · 625,297 sq ft
- 2201 E Trojan Wayscore 97
Multifamily Housing · 365,958 sq ft
Parking · 359,949 sq ft
See also: most efficient in California · biggest emitters
How does Pw Central Yard (1525 Alcazar St) (Ab 802) compare with other repair services (vehicle, shoe, locksmith, etc.) buildings in California?
The latest disclosures cover 21 repair services (vehicle, shoe, locksmith, etc.) buildings in California, out of 40,029 buildings citywide. Its site EUI of 12.5 kBtu/ft² is about 80% below the average of 62.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.9 kgCO₂e/ft² is about 78% below the group average of 4.1 kgCO₂e/ft².
At 200,766 sq ft, it is about 78% above the average floor area of 112,776 sq ft for those buildings. It was built in 1910, 72 years earlier than the group's average year built (1982).
How has Pw Central Yard (1525 Alcazar St) (Ab 802)'s energy performance changed over time?
BuildingCensus holds 4 California disclosures for Pw Central Yard (1525 Alcazar St) (Ab 802), covering report years 2020–2023. Site EUI moved from 13.2 kBtu/ft² (2020) to 12.5 kBtu/ft² (2023), a 5% decrease. Reported emissions went from 166 tCO₂e to 179 tCO₂e over the same span (up 8%).
What does a site EUI of 12.5 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Pw Central Yard (1525 Alcazar St) (Ab 802)'s 12.5 kBtu/ft² across 200,766 sq ft works out to about 2.5 billion Btu (735 MWh-equivalent) in 2023. The disclosure also reports 737,912 kWh of electricity for the year.
Which law requires Pw Central Yard (1525 Alcazar St) (Ab 802) to report its energy use?
Pw Central Yard (1525 Alcazar St) (Ab 802) reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record california:17978869:2023). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More repair services (vehicle, shoe, locksmith, etc.) buildings in California
- La Metro Division 11· 198,790 sq ft · EUI 155.1 kBtu/ft²
- 6707 Avalon Blvd· 170,000 sq ft
- La Metro Division 14· 141,675 sq ft · EUI 85.3 kBtu/ft²
- La Metro Division 24· 140,610 sq ft · EUI 227.2 kBtu/ft²
- 6030 Avenida Encinas· 128,705 sq ft · EUI 33.5 kBtu/ft²
- Drivetime· 125,505 sq ft · EUI 20.6 kBtu/ft²
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Pw Central Yard (1525 Alcazar St) (Ab 802)'s energy grade?
Pw Central Yard (1525 Alcazar St) (Ab 802) did not report an ENERGY STAR score in its 2023 disclosure, but its site energy-use intensity was 12.5 kBtu/ft².
How much energy does Pw Central Yard (1525 Alcazar St) (Ab 802) use?
Its 2023 site energy-use intensity was 12.5 kBtu/ft² across 200,766 sq ft, including 737,912 kWh of electricity.
What are Pw Central Yard (1525 Alcazar St) (Ab 802)'s carbon emissions?
Pw Central Yard (1525 Alcazar St) (Ab 802) reported 179 tCO₂e of greenhouse-gas emissions (0.9 kgCO₂e/ft²) for 2023.
Where is Pw Central Yard (1525 Alcazar St) (Ab 802)?
Pw Central Yard (1525 Alcazar St) (Ab 802) is at 1525 Alcazar Street, Los Angeles, in Los Angeles, California 90033. Its coordinates are 34.06383, -118.20510 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Pw Central Yard (1525 Alcazar St) (Ab 802) and when was it built?
Pw Central Yard (1525 Alcazar St) (Ab 802) has 200,766 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 1910 as its year built. It is classed as repair services (vehicle, shoe, locksmith, etc.).
Is Pw Central Yard (1525 Alcazar St) (Ab 802) covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2023 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Pw Central Yard (1525 Alcazar St) (Ab 802), Los Angeles, California — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/california/pw-central-yard-1525-alcazar-st-ab-802-dfa39127 (data as of July 9, 2026).