Samuel Oschin Comp Cancer Institute
Hospital (General Medical & Surgical) in California, CA · 8712 Beverly Blvd., Los Angeles · 90048
At a glance
Samuel Oschin Comp Cancer Institute is a 27,345-square-foot hospital (general medical & surgical) at 8712 Beverly Blvd., Los Angeles in Los Angeles, California, built in 1990. In its 2018 California benchmarking disclosure it reported a site energy-use intensity of 113.7 kBtu/ft² and 219 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2018
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 113.7 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 219 tCO₂e |
| GHG intensity | 8.0 kgCO₂e/ft² |
| Electricity | 907,162 kWh |
| Natural gas | 132 therms |
| Gross floor area | 27,345 sq ft |
| Source record | california:6696506:2018 |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 8712 Beverly Blvd., Los Angeles
- City
- California
- State
- California
- ZIP
- 90048
- Coordinates
- 34.07704, -118.38318
Within ~1 km
Nearby benchmarked buildings
- Cedars Sinai Campusscore 100
Hospital (General Medical & Surgical) · 4,810,447 sq ft
- Main Medical Centerscore —
Hospital (General Medical & Surgical) · 1,658,590 sq ft
- Beverlyscore —
Enclosed Mall · 860,748 sq ft
- 127 South San Vicentescore —
Ambulatory Surgical Center · 818,090 sq ft
Medical Office · 818,090 sq ft
- Pacific Design Center - Bluescore 100
Office · 750,000 sq ft
See also: most efficient in California · biggest emitters
How does Samuel Oschin Comp Cancer Institute compare with other hospital (general medical & surgical) buildings in California?
The latest disclosures cover 329 hospital (general medical & surgical) buildings in California, out of 40,029 buildings citywide. Its site EUI of 113.7 kBtu/ft² is about half of the average of 238.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 8.0 kgCO₂e/ft² is about 43% below the group average of 14.1 kgCO₂e/ft².
At 27,345 sq ft, it is about 94% below the average floor area of 432,386 sq ft for those buildings. It was built in 1990, 13 years later than the group's average year built (1978). Across all 24 jurisdictions BuildingCensus covers, the 748 hospital (general medical & surgical) buildings average an ENERGY STAR score of 59 and a site EUI of 238.7 kBtu/ft².
What does a site EUI of 113.7 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Samuel Oschin Comp Cancer Institute's 113.7 kBtu/ft² across 27,345 sq ft works out to about 3.1 billion Btu (911 MWh-equivalent) in 2018. The disclosure also reports 907,162 kWh of electricity and 132 therms of natural gas for the year.
Which law requires Samuel Oschin Comp Cancer Institute to report its energy use?
Samuel Oschin Comp Cancer Institute reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2018 disclosure (source record california:6696506:2018). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More hospital (general medical & surgical) buildings in California
Frequently asked questions
What is Samuel Oschin Comp Cancer Institute's energy grade?
Samuel Oschin Comp Cancer Institute did not report an ENERGY STAR score in its 2018 disclosure, but its site energy-use intensity was 113.7 kBtu/ft².
How much energy does Samuel Oschin Comp Cancer Institute use?
Its 2018 site energy-use intensity was 113.7 kBtu/ft² across 27,345 sq ft, including 907,162 kWh of electricity and 132 therms of natural gas.
What are Samuel Oschin Comp Cancer Institute's carbon emissions?
Samuel Oschin Comp Cancer Institute reported 219 tCO₂e of greenhouse-gas emissions (8.0 kgCO₂e/ft²) for 2018.
Where is Samuel Oschin Comp Cancer Institute?
Samuel Oschin Comp Cancer Institute is at 8712 Beverly Blvd., Los Angeles, in Los Angeles, California 90048. Its coordinates are 34.07704, -118.38318 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Samuel Oschin Comp Cancer Institute and when was it built?
Samuel Oschin Comp Cancer Institute has 27,345 sq ft of gross floor area, as reported in its 2018 disclosure. The disclosure lists 1990 as its year built. It is classed as hospital (general medical & surgical).
Is Samuel Oschin Comp Cancer Institute covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2018 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Samuel Oschin Comp Cancer Institute, Los Angeles, California — 2018 benchmarking disclosure”, https://buildingcensus.com/buildings/california/samuel-oschin-comp-cancer-institute-0c2c8e6b (data as of July 9, 2026).