BuildingCensus
–

Sewer_Point Loma Treatment Plant

Other in California, CA · 1902 Gatchell Rd, San Diego · 92106

At a glance

Sewer_Point Loma Treatment Plant is a 123,845-square-foot other building at 1902 Gatchell Rd, San Diego in San Diego, California, built in 1980. In its 2018 California benchmarking disclosure it reported a site energy-use intensity of 181.1 kBtu/ft² and 1,202 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2018
Site EUI
181.1
kBtu/ft²
GHG emissions
1,202
tCO₂e
GHG intensity
9.7
kgCO₂e/ft²
Floor area
123,845
sq ft
Year built
1980
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 2 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2018

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI181.1 kBtu/ft²
Source EUI—
GHG emissions1,202 tCO₂e
GHG intensity9.7 kgCO₂e/ft²
Electricity180,416 kWh
Natural gas218,080 therms
Gross floor area123,845 sq ft
Source recordcalifornia:3488042:2018

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1902 Gatchell Rd, San Diego
State
California
ZIP
92106
Coordinates
32.67875, -117.24637

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Sewer_Point Loma Treatment Plant compare with other other buildings in California?

The latest disclosures cover 773 other buildings in California, out of 40,029 buildings citywide. Its site EUI of 181.1 kBtu/ft² is about 211% above the average of 58.3 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 9.7 kgCO₂e/ft² is about 177% above the group average of 3.5 kgCO₂e/ft².

At 123,845 sq ft, it is about 76% below the average floor area of 511,890 sq ft for those buildings. It was built in 1980, 7 years later than the group's average year built (1973). Across all 24 jurisdictions BuildingCensus covers, the 1,327 other buildings average an ENERGY STAR score of 60 and a site EUI of 63.3 kBtu/ft².

What does a site EUI of 181.1 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Sewer_Point Loma Treatment Plant's 181.1 kBtu/ft² across 123,845 sq ft works out to about 22.4 billion Btu (6,573 MWh-equivalent) in 2018. The disclosure also reports 180,416 kWh of electricity and 218,080 therms of natural gas for the year.

Which law requires Sewer_Point Loma Treatment Plant to report its energy use?

Sewer_Point Loma Treatment Plant reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2018 disclosure (source record california:3488042:2018). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More other buildings in California

Frequently asked questions

What is Sewer_Point Loma Treatment Plant's energy grade?

Sewer_Point Loma Treatment Plant did not report an ENERGY STAR score in its 2018 disclosure, but its site energy-use intensity was 181.1 kBtu/ft².

How much energy does Sewer_Point Loma Treatment Plant use?

Its 2018 site energy-use intensity was 181.1 kBtu/ft² across 123,845 sq ft, including 180,416 kWh of electricity and 218,080 therms of natural gas.

What are Sewer_Point Loma Treatment Plant's carbon emissions?

Sewer_Point Loma Treatment Plant reported 1,202 tCO₂e of greenhouse-gas emissions (9.7 kgCO₂e/ft²) for 2018.

Where is Sewer_Point Loma Treatment Plant?

Sewer_Point Loma Treatment Plant is at 1902 Gatchell Rd, San Diego, in San Diego, California 92106. Its coordinates are 32.67875, -117.24637 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Sewer_Point Loma Treatment Plant and when was it built?

Sewer_Point Loma Treatment Plant has 123,845 sq ft of gross floor area, as reported in its 2018 disclosure. The disclosure lists 1980 as its year built. It is classed as other.

Is Sewer_Point Loma Treatment Plant covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2018 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Sewer_Point Loma Treatment Plant, San Diego, California — 2018 benchmarking disclosure”, https://buildingcensus.com/buildings/california/sewer-point-loma-treatment-plant-ced83902 (data as of July 9, 2026).