BuildingCensus
–

Sfvsa - Providence Tarzana Garden Plaza

Parking in California, CA · 18411 Clark Street, Tarzana · 91356

At a glance

Sfvsa - Providence Tarzana Garden Plaza is a 38,051-square-foot parking building at 18411 Clark Street, Tarzana in Tarzana, California, built in 1985. In its 2022 California benchmarking disclosure it reported a site energy-use intensity of 56.1 kBtu/ft² and 133 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2022
Site EUI
56.1
kBtu/ft²
GHG emissions
133
tCO₂e
GHG intensity
3.5
kgCO₂e/ft²
Floor area
38,051
sq ft
Year built
1985
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2022

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI56.1 kBtu/ft²
Source EUI—
GHG emissions133 tCO₂e
GHG intensity3.5 kgCO₂e/ft²
Electricity418,303 kWh
Natural gas6,658 therms
Gross floor area38,051 sq ft
Source recordcalifornia:2742535:2022

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2022latest—56.1 kBtu/ft²133 tCO₂e
2021—61.6 kBtu/ft²134 tCO₂e
2020—69.5 kBtu/ft²159 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
18411 Clark Street, Tarzana
State
California
ZIP
91356
Coordinates
34.16978, -118.53369

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Sfvsa - Providence Tarzana Garden Plaza compare with other parking buildings in California?

The latest disclosures cover 440 parking buildings in California, out of 40,029 buildings citywide. Its site EUI of 56.1 kBtu/ft² is about 71% above the average of 32.8 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 3.5 kgCO₂e/ft² is about 67% above the group average of 2.1 kgCO₂e/ft².

At 38,051 sq ft, it is about 84% below the average floor area of 238,274 sq ft for those buildings. It was built in 1985, 4 years earlier than the group's average year built (1990). Across all 24 jurisdictions BuildingCensus covers, the 1,071 parking buildings average an ENERGY STAR score of 67 and a site EUI of 40.3 kBtu/ft².

How has Sfvsa - Providence Tarzana Garden Plaza's energy performance changed over time?

BuildingCensus holds 3 California disclosures for Sfvsa - Providence Tarzana Garden Plaza, covering report years 2020–2022. Site EUI moved from 69.5 kBtu/ft² (2020) to 56.1 kBtu/ft² (2022), a 19% decrease. Reported emissions went from 159 tCO₂e to 133 tCO₂e over the same span (down 16%).

What does a site EUI of 56.1 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Sfvsa - Providence Tarzana Garden Plaza's 56.1 kBtu/ft² across 38,051 sq ft works out to about 2.1 billion Btu (626 MWh-equivalent) in 2022. The disclosure also reports 418,303 kWh of electricity and 6,658 therms of natural gas for the year.

Which law requires Sfvsa - Providence Tarzana Garden Plaza to report its energy use?

Sfvsa - Providence Tarzana Garden Plaza reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2022 disclosure (source record california:2742535:2022). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More parking buildings in California

Frequently asked questions

What is Sfvsa - Providence Tarzana Garden Plaza's energy grade?

Sfvsa - Providence Tarzana Garden Plaza did not report an ENERGY STAR score in its 2022 disclosure, but its site energy-use intensity was 56.1 kBtu/ft².

How much energy does Sfvsa - Providence Tarzana Garden Plaza use?

Its 2022 site energy-use intensity was 56.1 kBtu/ft² across 38,051 sq ft, including 418,303 kWh of electricity and 6,658 therms of natural gas.

What are Sfvsa - Providence Tarzana Garden Plaza's carbon emissions?

Sfvsa - Providence Tarzana Garden Plaza reported 133 tCO₂e of greenhouse-gas emissions (3.5 kgCO₂e/ft²) for 2022.

Where is Sfvsa - Providence Tarzana Garden Plaza?

Sfvsa - Providence Tarzana Garden Plaza is at 18411 Clark Street, Tarzana, in Tarzana, California 91356. Its coordinates are 34.16978, -118.53369 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Sfvsa - Providence Tarzana Garden Plaza and when was it built?

Sfvsa - Providence Tarzana Garden Plaza has 38,051 sq ft of gross floor area, as reported in its 2022 disclosure. The disclosure lists 1985 as its year built. It is classed as parking.

Is Sfvsa - Providence Tarzana Garden Plaza covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2022 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Sfvsa - Providence Tarzana Garden Plaza, Tarzana, California — 2022 benchmarking disclosure”, https://buildingcensus.com/buildings/california/sfvsa-providence-tarzana-garden-plaza-9c3e86aa (data as of July 9, 2026).