BuildingCensus
–

Shellmound Christie Corporation

Other - Technology/Science in California, CA · 5850 Shellmound Way, Emeryville · 94608

At a glance

Shellmound Christie Corporation is a 58,750-square-foot other - technology/science building at 5850 Shellmound Way, Emeryville in Emeryville, California, built in 1979. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 7.2 kBtu/ft² and 28 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
7.2
kBtu/ft²
GHG emissions
28
tCO₂e
GHG intensity
0.5
kgCO₂e/ft²
Floor area
58,750
sq ft
Year built
1979
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI7.2 kBtu/ft²
Source EUI—
GHG emissions28 tCO₂e
GHG intensity0.5 kgCO₂e/ft²
Electricity124,745 kWh
Gross floor area58,750 sq ft
Source recordcalifornia:8852177:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—7.2 kBtu/ft²28 tCO₂e
2023—7.0 kBtu/ft²29 tCO₂e
2022—8.3 kBtu/ft²33 tCO₂e
2021—9.4 kBtu/ft²34 tCO₂e
2020—10.9 kBtu/ft²43 tCO₂e
2019—12.1 kBtu/ft²50 tCO₂e
2018——107 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
5850 Shellmound Way, Emeryville
State
California
ZIP
94608
Coordinates
37.83950, -122.29448

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Shellmound Christie Corporation compare with other other - technology/science buildings in California?

The latest disclosures cover 86 other - technology/science buildings in California, out of 40,029 buildings citywide. Its site EUI of 7.2 kBtu/ft² is about 94% below the average of 114.9 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.5 kgCO₂e/ft² is about 94% below the group average of 7.5 kgCO₂e/ft².

At 58,750 sq ft, it is about 56% below the average floor area of 133,388 sq ft for those buildings. It was built in 1979, 12 years earlier than the group's average year built (1991). Across all 24 jurisdictions BuildingCensus covers, the 136 other - technology/science buildings average an ENERGY STAR score of 21 and a site EUI of 150.2 kBtu/ft².

How has Shellmound Christie Corporation's energy performance changed over time?

BuildingCensus holds 7 California disclosures for Shellmound Christie Corporation, covering report years 2018–2024. Site EUI moved from 12.1 kBtu/ft² (2019) to 7.2 kBtu/ft² (2024), a 40% decrease. Reported emissions went from 107 tCO₂e to 28 tCO₂e over the same span (down 74%).

What does a site EUI of 7.2 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Shellmound Christie Corporation's 7.2 kBtu/ft² across 58,750 sq ft works out to about 0.4 billion Btu (124 MWh-equivalent) in 2024. The disclosure also reports 124,745 kWh of electricity for the year.

Which law requires Shellmound Christie Corporation to report its energy use?

Shellmound Christie Corporation reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:8852177:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More other - technology/science buildings in California

Frequently asked questions

What is Shellmound Christie Corporation's energy grade?

Shellmound Christie Corporation did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 7.2 kBtu/ft².

How much energy does Shellmound Christie Corporation use?

Its 2024 site energy-use intensity was 7.2 kBtu/ft² across 58,750 sq ft, including 124,745 kWh of electricity.

What are Shellmound Christie Corporation's carbon emissions?

Shellmound Christie Corporation reported 28 tCO₂e of greenhouse-gas emissions (0.5 kgCO₂e/ft²) for 2024.

Where is Shellmound Christie Corporation?

Shellmound Christie Corporation is at 5850 Shellmound Way, Emeryville, in Emeryville, California 94608. Its coordinates are 37.83950, -122.29448 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Shellmound Christie Corporation and when was it built?

Shellmound Christie Corporation has 58,750 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1979 as its year built. It is classed as other - technology/science.

Is Shellmound Christie Corporation covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Shellmound Christie Corporation, Emeryville, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/shellmound-christie-corporation-29cf48af (data as of July 9, 2026).