South Chino Industrial (15820,15910-15940)
Distribution Center in California, CA · 15820 Euclid Avenue, Chino · 91708
At a glance
South Chino Industrial (15820,15910-15940) is a 271,435-square-foot distribution center at 15820 Euclid Avenue, Chino in Chino, California, built in 2003. In its 2023 California benchmarking disclosure it reported a site energy-use intensity of 5.7 kBtu/ft² and 110 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2023
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 5.7 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 110 tCO₂e |
| GHG intensity | 0.4 kgCO₂e/ft² |
| Electricity | 454,092 kWh |
| Gross floor area | 271,435 sq ft |
| Source record | california:5287178:2023 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2023latest | — | 5.7 kBtu/ft² | 110 tCO₂e | |
| 2022 | — | 5.7 kBtu/ft² | 110 tCO₂e | |
| 2021 | — | — | — | |
| 2020 | — | — | — | |
| 2019 | — | — | — |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 15820 Euclid Avenue, Chino
- City
- California
- State
- California
- ZIP
- 91708
- Coordinates
- 33.96711, -117.65247
Within ~1 km
Nearby benchmarked buildings
- Chino, Cascore —
Distribution Center · 1,450,000 sq ft
- Chino, Cascore 12
Non-Refrigerated Warehouse · 1,200,000 sq ft
- 15710 San Antonio Avenuescore 85
Distribution Center · 549,195 sq ft
- 15710 San Antonio Avenuescore 87
Distribution Center · 549,195 sq ft
- 15835 San Antonio Avenuescore 100
Wholesale Club/Supercenter · 537,404 sq ft
- 15835 San Antonio Avenuescore —
Wholesale Club/Supercenter · 537,404 sq ft
See also: most efficient in California · biggest emitters
How does South Chino Industrial (15820,15910-15940) compare with other distribution center buildings in California?
The latest disclosures cover 3,121 distribution center buildings in California, out of 40,029 buildings citywide. Its site EUI of 5.7 kBtu/ft² is about 71% below the average of 19.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.4 kgCO₂e/ft² is about 69% below the group average of 1.3 kgCO₂e/ft².
At 271,435 sq ft, it is about 14% above the average floor area of 238,298 sq ft for those buildings. It was built in 2003, 9 years later than the group's average year built (1994). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².
How has South Chino Industrial (15820,15910-15940)'s energy performance changed over time?
BuildingCensus holds 5 California disclosures for South Chino Industrial (15820,15910-15940), covering report years 2019–2023. Site EUI moved from 5.7 kBtu/ft² (2022) to 5.7 kBtu/ft² (2023), an 0% increase. Reported emissions went from 110 tCO₂e to 110 tCO₂e over the same span (up 0%).
What does a site EUI of 5.7 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. South Chino Industrial (15820,15910-15940)'s 5.7 kBtu/ft² across 271,435 sq ft works out to about 1.5 billion Btu (453 MWh-equivalent) in 2023. The disclosure also reports 454,092 kWh of electricity for the year.
Which law requires South Chino Industrial (15820,15910-15940) to report its energy use?
South Chino Industrial (15820,15910-15940) reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2023 disclosure (source record california:5287178:2023). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More distribution center buildings in California
- Diablo Industrial Park· 271,295 sq ft
- I-215 Distribution Center I· 270,877 sq ft · score 1 (D)
- Lax05801 - South Bay Dis Ctr 5· 270,764 sq ft · score 76 (B)
- Idig Fleetwood· 270,570 sq ft · score 57 (C)
- Thoroughbred - Phase Ii - Building 7· 268,830 sq ft · score 96 (A)
- 12828 Carmenita Rd, Santa Fe Springs, Ca 90670· 268,536 sq ft · score 98 (A)
- Distribution Center buildings in California· 3,121 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is South Chino Industrial (15820,15910-15940)'s energy grade?
South Chino Industrial (15820,15910-15940) did not report an ENERGY STAR score in its 2023 disclosure, but its site energy-use intensity was 5.7 kBtu/ft².
How much energy does South Chino Industrial (15820,15910-15940) use?
Its 2023 site energy-use intensity was 5.7 kBtu/ft² across 271,435 sq ft, including 454,092 kWh of electricity.
What are South Chino Industrial (15820,15910-15940)'s carbon emissions?
South Chino Industrial (15820,15910-15940) reported 110 tCO₂e of greenhouse-gas emissions (0.4 kgCO₂e/ft²) for 2023.
Where is South Chino Industrial (15820,15910-15940)?
South Chino Industrial (15820,15910-15940) is at 15820 Euclid Avenue, Chino, in Chino, California 91708. Its coordinates are 33.96711, -117.65247 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is South Chino Industrial (15820,15910-15940) and when was it built?
South Chino Industrial (15820,15910-15940) has 271,435 sq ft of gross floor area, as reported in its 2023 disclosure. The disclosure lists 2003 as its year built. It is classed as distribution center.
Is South Chino Industrial (15820,15910-15940) covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2023 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “South Chino Industrial (15820,15910-15940), Chino, California — 2023 benchmarking disclosure”, https://buildingcensus.com/buildings/california/south-chino-industrial-15820-15910-15940-344766c2 (data as of July 9, 2026).