St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus
Outpatient Rehabilitation/Physical Therapy in California, CA · 2024 Harrison Avenue, Eureka · 95501
At a glance
St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus is a 112,323-square-foot outpatient rehabilitation/physical therapy building at 2024 Harrison Avenue, Eureka in Eureka, California, built in 1929. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 1.0 kBtu/ft² and 7 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 1.0 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 7 tCO₂e |
| GHG intensity | 0.1 kgCO₂e/ft² |
| Electricity | 13,084 kWh |
| Natural gas | 714 therms |
| Gross floor area | 112,323 sq ft |
| Source record | california:9588580:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 1.0 kBtu/ft² | 7 tCO₂e | |
| 2023 | — | 1.2 kBtu/ft² | 8 tCO₂e | |
| 2022 | — | 1.4 kBtu/ft² | 9 tCO₂e | |
| 2021 | — | 1.3 kBtu/ft² | 9 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 2024 Harrison Avenue, Eureka
- City
- California
- State
- California
- ZIP
- 95501
- Coordinates
- 40.78921, -124.14054
Within ~1 km
Nearby benchmarked buildings
- St Joseph Hospital, Eurekascore 47
Hospital (General Medical & Surgical) · 283,964 sq ft
- St. Joseph Gh Buildingscore 100
Hospital (General Medical & Surgical) · 112,323 sq ft
See also: most efficient in California · biggest emitters
How does St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus compare with other outpatient rehabilitation/physical therapy buildings in California?
The latest disclosures cover 16 outpatient rehabilitation/physical therapy buildings in California, out of 40,029 buildings citywide. Its site EUI of 1.0 kBtu/ft² is about 98% below the average of 62.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.1 kgCO₂e/ft² is about 98% below the group average of 3.8 kgCO₂e/ft².
At 112,323 sq ft, it is about 29% below the average floor area of 158,313 sq ft for those buildings. It was built in 1929, 54 years earlier than the group's average year built (1983). Across all 24 jurisdictions BuildingCensus covers, the 65 outpatient rehabilitation/physical therapy buildings average an ENERGY STAR score of 14 and a site EUI of 99.2 kBtu/ft².
How has St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus's energy performance changed over time?
BuildingCensus holds 4 California disclosures for St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus, covering report years 2021–2024. Site EUI moved from 1.3 kBtu/ft² (2021) to 1.0 kBtu/ft² (2024), a 23% decrease. Reported emissions went from 9 tCO₂e to 7 tCO₂e over the same span (down 20%).
What does a site EUI of 1.0 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus's 1.0 kBtu/ft² across 112,323 sq ft works out to about 0.1 billion Btu (33 MWh-equivalent) in 2024. The disclosure also reports 13,084 kWh of electricity and 714 therms of natural gas for the year.
Which law requires St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus to report its energy use?
St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:9588580:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More outpatient rehabilitation/physical therapy buildings in California
- Aahs San Pablo Llc· 93,000 sq ft · EUI 2.9 kBtu/ft²
- Sjmc Cancer Rehabilitation And Wellness· 89,569 sq ft · EUI 76.7 kBtu/ft²
- 336 - 5818 El Camino Real· 76,693 sq ft · EUI 4.3 kBtu/ft²
- Health Research Association (Hra)· 74,035 sq ft · EUI 56.5 kBtu/ft²
- Health Research Association (Hra)· 74,035 sq ft · EUI 62.6 kBtu/ft²
- Llu Outpatient Rehabilitation Center· 66,053 sq ft · EUI 84.4 kBtu/ft²
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus's energy grade?
St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 1.0 kBtu/ft².
How much energy does St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus use?
Its 2024 site energy-use intensity was 1.0 kBtu/ft² across 112,323 sq ft, including 13,084 kWh of electricity and 714 therms of natural gas.
What are St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus's carbon emissions?
St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus reported 7 tCO₂e of greenhouse-gas emissions (0.1 kgCO₂e/ft²) for 2024.
Where is St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus?
St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus is at 2024 Harrison Avenue, Eureka, in Eureka, California 95501. Its coordinates are 40.78921, -124.14054 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus and when was it built?
St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus has 112,323 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1929 as its year built. It is classed as outpatient rehabilitation/physical therapy.
Is St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “St. Joseph Hospital Eureka - Outpatient Pt At General Hospital Campus, Eureka, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/st-joseph-hospital-eureka-outpatient-pt-at-general-hospital-campus-71c74a40 (data as of July 9, 2026).