BuildingCensus
D

Sutter Amador Hospital

Hospital (General Medical & Surgical) in California, CA · 200 Mission Boulevard, Jackson · 95642

At a glance

Sutter Amador Hospital is a 94,409-square-foot hospital (general medical & surgical) at 200 Mission Boulevard, Jackson in Jackson, California, built in 2000. In its 2018 California benchmarking disclosure it reported an ENERGY STAR score of 50 out of 100 (grade D), a site energy-use intensity of 249.4 kBtu/ft² and 1,439 tCO₂e of greenhouse-gas emissions. That score is higher than 40% of the 300 scored hospital (general medical & surgical) buildings in California.

ENERGY STAR score
50
band D · 2018
Site EUI
249.4
kBtu/ft²
GHG emissions
1,439
tCO₂e
GHG intensity
15.2
kgCO₂e/ft²
Floor area
94,409
sq ft
Year built
2000
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 3 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2018

Benchmarking record

FieldValue
ENERGY STAR score50 (band D)
Site EUI249.4 kBtu/ft²
Source EUI—
GHG emissions1,439 tCO₂e
GHG intensity15.2 kgCO₂e/ft²
Electricity3,347,715 kWh
Natural gas119,489 therms
Gross floor area94,409 sq ft
Source recordcalifornia:5817800:2018

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
200 Mission Boulevard, Jackson
State
California
ZIP
95642
Coordinates
38.35048, -120.76445

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Sutter Amador Hospital compare with other hospital (general medical & surgical) buildings in California?

The latest disclosures cover 329 hospital (general medical & surgical) buildings in California, out of 40,029 buildings citywide. Sutter Amador Hospital's ENERGY STAR score of 50 compares with an average of 59 across the 300 that report a score; it scores higher than 40% of them and lower than 59%. Its site EUI of 249.4 kBtu/ft² is roughly in line with the average of 238.4 kBtu/ft². Its emissions intensity of 15.2 kgCO₂e/ft² is roughly in line with the group average of 14.1 kgCO₂e/ft².

At 94,409 sq ft, it is about 78% below the average floor area of 432,386 sq ft for those buildings. It was built in 2000, 23 years later than the group's average year built (1978). Across all 24 jurisdictions BuildingCensus covers, the 748 hospital (general medical & surgical) buildings average an ENERGY STAR score of 59 and a site EUI of 238.7 kBtu/ft².

What does an ENERGY STAR score of 50 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 50 means the building performs better than about 50% of its national peers. BuildingCensus bands the score into report-card grades; 50 falls in band D — lowest band (1–54). It sits 25 points below 75, the threshold for ENERGY STAR certification. In California, 65% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Sutter Amador Hospital's 249.4 kBtu/ft² across 94,409 sq ft works out to about 23.5 billion Btu (6,901 MWh-equivalent) in 2018. The disclosure also reports 3,347,715 kWh of electricity and 119,489 therms of natural gas for the year.

Which law requires Sutter Amador Hospital to report its energy use?

Sutter Amador Hospital reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2018 disclosure (source record california:5817800:2018). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More hospital (general medical & surgical) buildings in California

Frequently asked questions

What is Sutter Amador Hospital's energy grade?

Sutter Amador Hospital scores 50 out of 100 on ENERGY STAR — band D, lowest band (1–54) — in its 2018 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Sutter Amador Hospital use?

Its 2018 site energy-use intensity was 249.4 kBtu/ft² across 94,409 sq ft, including 3,347,715 kWh of electricity and 119,489 therms of natural gas.

What are Sutter Amador Hospital's carbon emissions?

Sutter Amador Hospital reported 1,439 tCO₂e of greenhouse-gas emissions (15.2 kgCO₂e/ft²) for 2018.

Where is Sutter Amador Hospital?

Sutter Amador Hospital is at 200 Mission Boulevard, Jackson, in Jackson, California 95642. Its coordinates are 38.35048, -120.76445 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Sutter Amador Hospital and when was it built?

Sutter Amador Hospital has 94,409 sq ft of gross floor area, as reported in its 2018 disclosure. The disclosure lists 2000 as its year built. It is classed as hospital (general medical & surgical).

Is Sutter Amador Hospital covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2018 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Sutter Amador Hospital, Jackson, California — 2018 benchmarking disclosure”, https://buildingcensus.com/buildings/california/sutter-amador-hospital-98d4e499 (data as of July 9, 2026).