BuildingCensus
B

Sutter Auburn Faith Hospital

Hospital (General Medical & Surgical) in California, CA · 11815 Education Street, Auburn · 95604

At a glance

Sutter Auburn Faith Hospital is a 125,003-square-foot hospital (general medical & surgical) at 11815 Education Street, Auburn in Auburn, California, built in 1964. In its 2018 California benchmarking disclosure it reported an ENERGY STAR score of 75 out of 100 (grade B), a site energy-use intensity of 199.4 kBtu/ft² and 1,549 tCO₂e of greenhouse-gas emissions. That score is higher than 58% of the 300 scored hospital (general medical & surgical) buildings in California.

ENERGY STAR score
75
band B · 2018
Site EUI
199.4
kBtu/ft²
GHG emissions
1,549
tCO₂e
GHG intensity
12.4
kgCO₂e/ft²
Floor area
125,003
sq ft
Year built
1964
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2018

Benchmarking record

FieldValue
ENERGY STAR score75 (band B)
Site EUI199.4 kBtu/ft²
Source EUI—
GHG emissions1,549 tCO₂e
GHG intensity12.4 kgCO₂e/ft²
Electricity3,958,120 kWh
Natural gas112,585 therms
Gross floor area125,003 sq ft
Source recordcalifornia:5817801:2018

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
11815 Education Street, Auburn
State
California
ZIP
95604
Coordinates
38.94523, -121.10090

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Sutter Auburn Faith Hospital compare with other hospital (general medical & surgical) buildings in California?

The latest disclosures cover 329 hospital (general medical & surgical) buildings in California, out of 40,029 buildings citywide. Sutter Auburn Faith Hospital's ENERGY STAR score of 75 compares with an average of 59 across the 300 that report a score; it scores higher than 58% of them and lower than 42%. Its site EUI of 199.4 kBtu/ft² is about 16% below the average of 238.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 12.4 kgCO₂e/ft² is about 12% below the group average of 14.1 kgCO₂e/ft².

At 125,003 sq ft, it is about 71% below the average floor area of 432,386 sq ft for those buildings. It was built in 1964, 13 years earlier than the group's average year built (1978). Across all 24 jurisdictions BuildingCensus covers, the 748 hospital (general medical & surgical) buildings average an ENERGY STAR score of 59 and a site EUI of 238.7 kBtu/ft².

What does an ENERGY STAR score of 75 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 75 means the building performs better than about 75% of its national peers. BuildingCensus bands the score into report-card grades; 75 falls in band B — above median (70–84). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Sutter Auburn Faith Hospital's 199.4 kBtu/ft² across 125,003 sq ft works out to about 24.9 billion Btu (7,305 MWh-equivalent) in 2018. The disclosure also reports 3,958,120 kWh of electricity and 112,585 therms of natural gas for the year.

Which law requires Sutter Auburn Faith Hospital to report its energy use?

Sutter Auburn Faith Hospital reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2018 disclosure (source record california:5817801:2018). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More hospital (general medical & surgical) buildings in California

Frequently asked questions

What is Sutter Auburn Faith Hospital's energy grade?

Sutter Auburn Faith Hospital scores 75 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2018 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Sutter Auburn Faith Hospital use?

Its 2018 site energy-use intensity was 199.4 kBtu/ft² across 125,003 sq ft, including 3,958,120 kWh of electricity and 112,585 therms of natural gas.

What are Sutter Auburn Faith Hospital's carbon emissions?

Sutter Auburn Faith Hospital reported 1,549 tCO₂e of greenhouse-gas emissions (12.4 kgCO₂e/ft²) for 2018.

Where is Sutter Auburn Faith Hospital?

Sutter Auburn Faith Hospital is at 11815 Education Street, Auburn, in Auburn, California 95604. Its coordinates are 38.94523, -121.10090 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Sutter Auburn Faith Hospital and when was it built?

Sutter Auburn Faith Hospital has 125,003 sq ft of gross floor area, as reported in its 2018 disclosure. The disclosure lists 1964 as its year built. It is classed as hospital (general medical & surgical).

Is Sutter Auburn Faith Hospital covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2018 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Sutter Auburn Faith Hospital, Auburn, California — 2018 benchmarking disclosure”, https://buildingcensus.com/buildings/california/sutter-auburn-faith-hospital-b2b8c8fd (data as of July 9, 2026).