BuildingCensus
–

Sutter Health-4050 Dublin Boulevard

Urgent Care/Clinic/Other Outpatient in California, CA · 4050 Dublin Boulevard, Dublin · 94568

At a glance

Sutter Health-4050 Dublin Boulevard is a 57,451-square-foot urgent care/clinic/other outpatient building at 4050 Dublin Boulevard, Dublin in Dublin, California, built in 2006. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 104.3 kBtu/ft² and 376 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
104.3
kBtu/ft²
GHG emissions
376
tCO₂e
GHG intensity
6.5
kgCO₂e/ft²
Floor area
57,451
sq ft
Year built
2006
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI104.3 kBtu/ft²
Source EUI—
GHG emissions376 tCO₂e
GHG intensity6.5 kgCO₂e/ft²
Electricity1,313,485 kWh
Natural gas14,820 therms
Gross floor area57,451 sq ft
Source recordcalifornia:12396513:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—104.3 kBtu/ft²376 tCO₂e
2023—100.8 kBtu/ft²380 tCO₂e
2021—115.4 kBtu/ft²421 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
4050 Dublin Boulevard, Dublin
State
California
ZIP
94568
Coordinates
37.70521, -121.87308

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Sutter Health-4050 Dublin Boulevard compare with other urgent care/clinic/other outpatient buildings in California?

The latest disclosures cover 30 urgent care/clinic/other outpatient buildings in California, out of 40,029 buildings citywide. Its site EUI of 104.3 kBtu/ft² is roughly in line with the average of 105.0 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 6.5 kgCO₂e/ft² is roughly in line with the group average of 6.6 kgCO₂e/ft².

At 57,451 sq ft, it is about half of the average floor area of 109,432 sq ft for those buildings. It was built in 2006, 17 years later than the group's average year built (1989).

How has Sutter Health-4050 Dublin Boulevard's energy performance changed over time?

BuildingCensus holds 3 California disclosures for Sutter Health-4050 Dublin Boulevard, covering report years 2021, 2023, 2024. Site EUI moved from 115.4 kBtu/ft² (2021) to 104.3 kBtu/ft² (2024), a 10% decrease. Reported emissions went from 421 tCO₂e to 376 tCO₂e over the same span (down 11%).

What does a site EUI of 104.3 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Sutter Health-4050 Dublin Boulevard's 104.3 kBtu/ft² across 57,451 sq ft works out to about 6 billion Btu (1,756 MWh-equivalent) in 2024. The disclosure also reports 1,313,485 kWh of electricity and 14,820 therms of natural gas for the year.

Which law requires Sutter Health-4050 Dublin Boulevard to report its energy use?

Sutter Health-4050 Dublin Boulevard reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:12396513:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More urgent care/clinic/other outpatient buildings in California

Frequently asked questions

What is Sutter Health-4050 Dublin Boulevard's energy grade?

Sutter Health-4050 Dublin Boulevard did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 104.3 kBtu/ft².

How much energy does Sutter Health-4050 Dublin Boulevard use?

Its 2024 site energy-use intensity was 104.3 kBtu/ft² across 57,451 sq ft, including 1,313,485 kWh of electricity and 14,820 therms of natural gas.

What are Sutter Health-4050 Dublin Boulevard's carbon emissions?

Sutter Health-4050 Dublin Boulevard reported 376 tCO₂e of greenhouse-gas emissions (6.5 kgCO₂e/ft²) for 2024.

Where is Sutter Health-4050 Dublin Boulevard?

Sutter Health-4050 Dublin Boulevard is at 4050 Dublin Boulevard, Dublin, in Dublin, California 94568. Its coordinates are 37.70521, -121.87308 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Sutter Health-4050 Dublin Boulevard and when was it built?

Sutter Health-4050 Dublin Boulevard has 57,451 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2006 as its year built. It is classed as urgent care/clinic/other outpatient.

Is Sutter Health-4050 Dublin Boulevard covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Sutter Health-4050 Dublin Boulevard, Dublin, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/sutter-health-4050-dublin-boulevard-00ea151b (data as of July 9, 2026).