(Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included)
Transportation Terminal/Station in California, CA · 8908 1/2 Aero Dr, San Diego · 92123
At a glance
(Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included) is a 60,542-square-foot transportation terminal/station at 8908 1/2 Aero Dr, San Diego in San Diego, California, built in 1970. In its 2022 California benchmarking disclosure it reported a site energy-use intensity of 9.7 kBtu/ft² and 40 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2022
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 9.7 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 40 tCO₂e |
| GHG intensity | 0.7 kgCO₂e/ft² |
| Electricity | 167,578 kWh |
| Natural gas | 119 therms |
| Gross floor area | 60,542 sq ft |
| Source record | california:8847293:2022 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2022latest | — | 9.7 kBtu/ft² | 40 tCO₂e | |
| 2021 | — | 10.4 kBtu/ft² | 38 tCO₂e | |
| 2020 | — | 10.5 kBtu/ft² | 38 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 8908 1/2 Aero Dr, San Diego
- City
- California
- State
- California
- ZIP
- 92123
- Coordinates
- 32.80784, -117.14853
Within ~1 km
Nearby benchmarked buildings
- Olympus Corsairscore 23
Multifamily Housing · 527,781 sq ft
- Mira Bellascore 100
Multifamily Housing · 487,863 sq ft
- The Modern Apartmentsscore 89
Multifamily Housing · 388,000 sq ft
- Four Points By Sheratonscore 98
Hotel · 223,000 sq ft
Hotel · 202,500 sq ft
- Belden Villagescore 100
Multifamily Housing · 166,882 sq ft
See also: most efficient in California · biggest emitters
How does (Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included) compare with other transportation terminal/station buildings in California?
The latest disclosures cover 42 transportation terminal/station buildings in California, out of 40,029 buildings citywide. Its site EUI of 9.7 kBtu/ft² is about 89% below the average of 89.6 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.7 kgCO₂e/ft² is about 87% below the group average of 5.3 kgCO₂e/ft².
At 60,542 sq ft, it is about 83% below the average floor area of 346,524 sq ft for those buildings. It was built in 1970, 5 years earlier than the group's average year built (1975). Across all 24 jurisdictions BuildingCensus covers, the 103 transportation terminal/station buildings average an ENERGY STAR score of 4 and a site EUI of 105.1 kBtu/ft².
How has (Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included)'s energy performance changed over time?
BuildingCensus holds 3 California disclosures for (Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included), covering report years 2020–2022. Site EUI moved from 10.5 kBtu/ft² (2020) to 9.7 kBtu/ft² (2022), a 8% decrease. Reported emissions went from 38 tCO₂e to 40 tCO₂e over the same span (up 4%).
What does a site EUI of 9.7 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. (Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included)'s 9.7 kBtu/ft² across 60,542 sq ft works out to about 0.6 billion Btu (172 MWh-equivalent) in 2022. The disclosure also reports 167,578 kWh of electricity and 119 therms of natural gas for the year.
Which law requires (Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included) to report its energy use?
(Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included) reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2022 disclosure (source record california:8847293:2022). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More transportation terminal/station buildings in California
- Santa Barbara Airport Terminal· 58,406 sq ft · EUI 100.0 kBtu/ft²
- Building - Signature 7156 Llc· 57,492 sq ft · EUI 9.2 kBtu/ft²
- Abf Freight System, Inc. - San Bernardino· 56,648 sq ft · EUI 26.0 kBtu/ft²
- Pier 27 - James R. Herman Cruise Terminal· 56,103 sq ft
- Abf Freight System, Inc. - Pico Rivera· 55,680 sq ft · EUI 11.5 kBtu/ft²
- Amtrak Station· 55,000 sq ft · EUI 30.7 kBtu/ft²
- Transportation Terminal/Station buildings in California· 42 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is (Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included)'s energy grade?
(Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included) did not report an ENERGY STAR score in its 2022 disclosure, but its site energy-use intensity was 9.7 kBtu/ft².
How much energy does (Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included) use?
Its 2022 site energy-use intensity was 9.7 kBtu/ft² across 60,542 sq ft, including 167,578 kWh of electricity and 119 therms of natural gas.
What are (Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included)'s carbon emissions?
(Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included) reported 40 tCO₂e of greenhouse-gas emissions (0.7 kgCO₂e/ft²) for 2022.
Where is (Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included)?
(Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included) is at 8908 1/2 Aero Dr, San Diego, in San Diego, California 92123. Its coordinates are 32.80784, -117.14853 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is (Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included) and when was it built?
(Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included) has 60,542 sq ft of gross floor area, as reported in its 2022 disclosure. The disclosure lists 1970 as its year built. It is classed as transportation terminal/station.
Is (Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included) covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2022 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “(Tenant Occupied) Airport_Montgomery Field (Possible Tenant Meters Not Included), San Diego, California — 2022 benchmarking disclosure”, https://buildingcensus.com/buildings/california/tenant-occupied-airport-montgomery-field-possible-tenant-meters-not-included-b187168d (data as of July 9, 2026).