The Park Terrace At Mission Bay
Multifamily Housing in California, CA · 325 Berry Street, San Francisco · 94158
At a glance
The Park Terrace At Mission Bay is a 130,257-square-foot multifamily housing building at 325 Berry Street, San Francisco in San Francisco, California, built in 2007. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 89 out of 100 (grade A), a site energy-use intensity of 31.7 kBtu/ft² and 252 tCO₂e of greenhouse-gas emissions. That score is higher than 45% of the 9,612 scored multifamily housing buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 89 (band A) |
| Site EUI | 31.7 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 252 tCO₂e |
| GHG intensity | 1.9 kgCO₂e/ft² |
| Electricity | 659,962 kWh |
| Natural gas | 19,398 therms |
| Gross floor area | 130,257 sq ft |
| Source record | california:10544242:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | 89 | +5 | 31.7 kBtu/ft² | 252 tCO₂e |
| 2023 | 84 | +3 | 33.7 kBtu/ft² | 271 tCO₂e |
| 2022 | 81 | +12 | 36.8 kBtu/ft² | 292 tCO₂e |
| 2021 | 69 | ±0 | 39.5 kBtu/ft² | 289 tCO₂e |
| 2020 | 69 | -2 | 39.9 kBtu/ft² | 305 tCO₂e |
| 2019 | 71 | 39.5 kBtu/ft² | 314 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 325 Berry Street, San Francisco
- City
- California
- State
- California
- ZIP
- 94158
- Coordinates
- 37.77339, -122.39571
Within ~1 km
Nearby benchmarked buildings
- At&T Parkscore —
Stadium (Open) · 1,230,000 sq ft
- China Basinscore —
Commercial · 1,218,533 sq ft
- 238 KING STscore —
Mixed Residential · 1,212,969 sq ft
- Chase Centerscore —
Other - Stadium · 1,203,115 sq ft
- The Exchangescore 52
Commercial · 1,057,149 sq ft
- China Basinscore —
Office · 1,032,795 sq ft
See also: most efficient in California · biggest emitters
How does The Park Terrace At Mission Bay compare with other multifamily housing buildings in California?
The latest disclosures cover 10,630 multifamily housing buildings in California, out of 40,029 buildings citywide. The Park Terrace At Mission Bay's ENERGY STAR score of 89 compares with an average of 82 across the 9,612 that report a score; it scores higher than 45% of them and lower than 53%. Its site EUI of 31.7 kBtu/ft² is roughly in line with the average of 34.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 1.9 kgCO₂e/ft² is roughly in line with the group average of 2.1 kgCO₂e/ft².
At 130,257 sq ft, it is about 14% below the average floor area of 150,919 sq ft for those buildings. It was built in 2007, 19 years later than the group's average year built (1988). Across all 24 jurisdictions BuildingCensus covers, the 59,945 multifamily housing buildings average an ENERGY STAR score of 70 and a site EUI of 59.0 kBtu/ft².
How has The Park Terrace At Mission Bay's energy performance changed over time?
BuildingCensus holds 6 California disclosures for The Park Terrace At Mission Bay, covering report years 2019–2024. Its ENERGY STAR score went from 71 in 2019 to 89 in 2024 (+18 points). Site EUI moved from 39.5 kBtu/ft² (2019) to 31.7 kBtu/ft² (2024), a 20% decrease. Reported emissions went from 314 tCO₂e to 252 tCO₂e over the same span (down 20%).
What does an ENERGY STAR score of 89 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 89 means the building performs better than about 89% of its national peers. BuildingCensus bands the score into report-card grades; 89 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. The Park Terrace At Mission Bay's 31.7 kBtu/ft² across 130,257 sq ft works out to about 4.1 billion Btu (1,210 MWh-equivalent) in 2024. The disclosure also reports 659,962 kWh of electricity and 19,398 therms of natural gas for the year.
Which law requires The Park Terrace At Mission Bay to report its energy use?
The Park Terrace At Mission Bay reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:10544242:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More multifamily housing buildings in California
- Paloma Apartment Homes· 130,236 sq ft · score 100 (A)
- 855 S Citrus Ave· 130,231 sq ft · score 77 (B)
- The Ritz Colony Apartments· 130,192 sq ft · score 100 (A)
- Park West - Essex (Pr838)· 130,152 sq ft · score 93 (A)
- The Carlyle· 130,152 sq ft · score 100 (A)
- The Marc Palo Alto (Mr48)· 130,145 sq ft · score 81 (B)
- Multifamily Housing buildings in California· 10,630 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is The Park Terrace At Mission Bay's energy grade?
The Park Terrace At Mission Bay scores 89 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does The Park Terrace At Mission Bay use?
Its 2024 site energy-use intensity was 31.7 kBtu/ft² across 130,257 sq ft, including 659,962 kWh of electricity and 19,398 therms of natural gas.
What are The Park Terrace At Mission Bay's carbon emissions?
The Park Terrace At Mission Bay reported 252 tCO₂e of greenhouse-gas emissions (1.9 kgCO₂e/ft²) for 2024.
Where is The Park Terrace At Mission Bay?
The Park Terrace At Mission Bay is at 325 Berry Street, San Francisco, in San Francisco, California 94158. Its coordinates are 37.77339, -122.39571 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is The Park Terrace At Mission Bay and when was it built?
The Park Terrace At Mission Bay has 130,257 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2007 as its year built. It is classed as multifamily housing.
Is The Park Terrace At Mission Bay covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “The Park Terrace At Mission Bay, San Francisco, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/the-park-terrace-at-mission-bay-a1db5000 (data as of July 9, 2026).