BuildingCensus
A

The Ultimate Freight Management & Logistics, Inc

Distribution Center in California, CA · 9215 Hall Rd, Downey · 90241

At a glance

The Ultimate Freight Management & Logistics, Inc is a 57,125-square-foot distribution center at 9215 Hall Rd, Downey in Downey, California, built in 2003. In its 2022 California benchmarking disclosure it reported an ENERGY STAR score of 94 out of 100 (grade A), a site energy-use intensity of 3.1 kBtu/ft² and 13 tCO₂e of greenhouse-gas emissions. That score is higher than 76% of the 2,485 scored distribution center buildings in California.

ENERGY STAR score
94
band A · 2022
Site EUI
3.1
kBtu/ft²
GHG emissions
13
tCO₂e
GHG intensity
0.2
kgCO₂e/ft²
Floor area
57,125
sq ft
Year built
2003
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2022

Benchmarking record

FieldValue
ENERGY STAR score94 (band A)
Site EUI3.1 kBtu/ft²
Source EUI—
GHG emissions13 tCO₂e
GHG intensity0.2 kgCO₂e/ft²
Electricity51,825 kWh
Gross floor area57,125 sq ft
Source recordcalifornia:27292808:2022

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
9215 Hall Rd, Downey
State
California
ZIP
90241
Coordinates
33.93200, -118.12163

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does The Ultimate Freight Management & Logistics, Inc compare with other distribution center buildings in California?

The latest disclosures cover 3,121 distribution center buildings in California, out of 40,029 buildings citywide. The Ultimate Freight Management & Logistics, Inc's ENERGY STAR score of 94 compares with an average of 67 across the 2,485 that report a score; it scores higher than 76% of them and lower than 22%. Its site EUI of 3.1 kBtu/ft² is about 84% below the average of 19.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.2 kgCO₂e/ft² is about 85% below the group average of 1.3 kgCO₂e/ft².

At 57,125 sq ft, it is about 76% below the average floor area of 238,298 sq ft for those buildings. It was built in 2003, 9 years later than the group's average year built (1994). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².

What does an ENERGY STAR score of 94 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 94 means the building performs better than about 94% of its national peers. BuildingCensus bands the score into report-card grades; 94 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. The Ultimate Freight Management & Logistics, Inc's 3.1 kBtu/ft² across 57,125 sq ft works out to about 0.2 billion Btu (52 MWh-equivalent) in 2022. The disclosure also reports 51,825 kWh of electricity for the year.

Which law requires The Ultimate Freight Management & Logistics, Inc to report its energy use?

The Ultimate Freight Management & Logistics, Inc reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2022 disclosure (source record california:27292808:2022). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More distribution center buildings in California

Frequently asked questions

What is The Ultimate Freight Management & Logistics, Inc's energy grade?

The Ultimate Freight Management & Logistics, Inc scores 94 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2022 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does The Ultimate Freight Management & Logistics, Inc use?

Its 2022 site energy-use intensity was 3.1 kBtu/ft² across 57,125 sq ft, including 51,825 kWh of electricity.

What are The Ultimate Freight Management & Logistics, Inc's carbon emissions?

The Ultimate Freight Management & Logistics, Inc reported 13 tCO₂e of greenhouse-gas emissions (0.2 kgCO₂e/ft²) for 2022.

Where is The Ultimate Freight Management & Logistics, Inc?

The Ultimate Freight Management & Logistics, Inc is at 9215 Hall Rd, Downey, in Downey, California 90241. Its coordinates are 33.93200, -118.12163 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is The Ultimate Freight Management & Logistics, Inc and when was it built?

The Ultimate Freight Management & Logistics, Inc has 57,125 sq ft of gross floor area, as reported in its 2022 disclosure. The disclosure lists 2003 as its year built. It is classed as distribution center.

Is The Ultimate Freight Management & Logistics, Inc covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2022 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “The Ultimate Freight Management & Logistics, Inc, Downey, California — 2022 benchmarking disclosure”, https://buildingcensus.com/buildings/california/the-ultimate-freight-management-logistics-inc-5d177030 (data as of July 9, 2026).