BuildingCensus
D

Trimble Distribution Center #3

Distribution Center in California, CA · 500-540 E Trimble Rd, San Jose · 95131

At a glance

Trimble Distribution Center #3 is a 77,155-square-foot distribution center at 500-540 E Trimble Rd, San Jose in San Jose, California, built in 1977. In its 2022 California benchmarking disclosure it reported an ENERGY STAR score of 36 out of 100 (grade D), a site energy-use intensity of 20.5 kBtu/ft² and 108 tCO₂e of greenhouse-gas emissions. That score is higher than 19% of the 2,485 scored distribution center buildings in California.

ENERGY STAR score
36
band D · 2022
Site EUI
20.5
kBtu/ft²
GHG emissions
108
tCO₂e
GHG intensity
1.4
kgCO₂e/ft²
Floor area
77,155
sq ft
Year built
1977
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2022

Benchmarking record

FieldValue
ENERGY STAR score36 (band D)
Site EUI20.5 kBtu/ft²
Source EUI—
GHG emissions108 tCO₂e
GHG intensity1.4 kgCO₂e/ft²
Electricity457,130 kWh
Natural gas293 therms
Gross floor area77,155 sq ft
Source recordcalifornia:3969671:2022

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2022latest36+920.5 kBtu/ft²108 tCO₂e
202027-724.0 kBtu/ft²122 tCO₂e
20193421.2 kBtu/ft²109 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
500-540 E Trimble Rd, San Jose
State
California
ZIP
95131
Coordinates
37.39129, -121.92034

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Trimble Distribution Center #3 compare with other distribution center buildings in California?

The latest disclosures cover 3,121 distribution center buildings in California, out of 40,029 buildings citywide. Trimble Distribution Center #3's ENERGY STAR score of 36 compares with an average of 67 across the 2,485 that report a score; it scores higher than 19% of them and lower than 80%. Its site EUI of 20.5 kBtu/ft² is roughly in line with the average of 19.8 kBtu/ft². Its emissions intensity of 1.4 kgCO₂e/ft² is roughly in line with the group average of 1.3 kgCO₂e/ft².

At 77,155 sq ft, it is about 68% below the average floor area of 238,298 sq ft for those buildings. It was built in 1977, 17 years earlier than the group's average year built (1994). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².

How has Trimble Distribution Center #3's energy performance changed over time?

BuildingCensus holds 3 California disclosures for Trimble Distribution Center #3, covering report years 2019, 2020, 2022. Its ENERGY STAR score went from 34 in 2019 to 36 in 2022 (+2 points). Site EUI moved from 21.2 kBtu/ft² (2019) to 20.5 kBtu/ft² (2022), a 3% decrease. Reported emissions went from 109 tCO₂e to 108 tCO₂e over the same span (down 0%).

What does an ENERGY STAR score of 36 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 36 means the building performs better than about 36% of its national peers. BuildingCensus bands the score into report-card grades; 36 falls in band D — lowest band (1–54). It sits 39 points below 75, the threshold for ENERGY STAR certification. In California, 65% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Trimble Distribution Center #3's 20.5 kBtu/ft² across 77,155 sq ft works out to about 1.6 billion Btu (464 MWh-equivalent) in 2022. The disclosure also reports 457,130 kWh of electricity and 293 therms of natural gas for the year.

Which law requires Trimble Distribution Center #3 to report its energy use?

Trimble Distribution Center #3 reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2022 disclosure (source record california:3969671:2022). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More distribution center buildings in California

Frequently asked questions

What is Trimble Distribution Center #3's energy grade?

Trimble Distribution Center #3 scores 36 out of 100 on ENERGY STAR — band D, lowest band (1–54) — in its 2022 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Trimble Distribution Center #3 use?

Its 2022 site energy-use intensity was 20.5 kBtu/ft² across 77,155 sq ft, including 457,130 kWh of electricity and 293 therms of natural gas.

What are Trimble Distribution Center #3's carbon emissions?

Trimble Distribution Center #3 reported 108 tCO₂e of greenhouse-gas emissions (1.4 kgCO₂e/ft²) for 2022.

Where is Trimble Distribution Center #3?

Trimble Distribution Center #3 is at 500-540 E Trimble Rd, San Jose, in San Jose, California 95131. Its coordinates are 37.39129, -121.92034 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Trimble Distribution Center #3 and when was it built?

Trimble Distribution Center #3 has 77,155 sq ft of gross floor area, as reported in its 2022 disclosure. The disclosure lists 1977 as its year built. It is classed as distribution center.

Is Trimble Distribution Center #3 covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2022 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Trimble Distribution Center #3, San Jose, California — 2022 benchmarking disclosure”, https://buildingcensus.com/buildings/california/trimble-distribution-center-3-68708592 (data as of July 9, 2026).