BuildingCensus
A

University Medical Center - North Tower

Hospital (General Medical & Surgical) in California, CA · 445 S Cedar, Fresno · 93702

At a glance

University Medical Center - North Tower is a 112,280-square-foot hospital (general medical & surgical) at 445 S Cedar, Fresno in Fresno, California, built in 1990. In its 2022 California benchmarking disclosure it reported an ENERGY STAR score of 90 out of 100 (grade A), a site energy-use intensity of 188.8 kBtu/ft² and 1,305 tCO₂e of greenhouse-gas emissions. That score is higher than 72% of the 300 scored hospital (general medical & surgical) buildings in California.

ENERGY STAR score
90
band A · 2022
Site EUI
188.8
kBtu/ft²
GHG emissions
1,305
tCO₂e
GHG intensity
11.6
kgCO₂e/ft²
Floor area
112,280
sq ft
Year built
1990
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 3 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2022

Benchmarking record

FieldValue
ENERGY STAR score90 (band A)
Site EUI188.8 kBtu/ft²
Source EUI—
GHG emissions1,305 tCO₂e
GHG intensity11.6 kgCO₂e/ft²
Electricity3,418,976 kWh
Natural gas95,190 therms
Gross floor area112,280 sq ft
Source recordcalifornia:27517549:2022

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
445 S Cedar, Fresno
State
California
ZIP
93702
Coordinates
36.73793, -119.75341

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does University Medical Center - North Tower compare with other hospital (general medical & surgical) buildings in California?

The latest disclosures cover 329 hospital (general medical & surgical) buildings in California, out of 40,029 buildings citywide. University Medical Center - North Tower's ENERGY STAR score of 90 compares with an average of 59 across the 300 that report a score; it scores higher than 72% of them and lower than 25%. Its site EUI of 188.8 kBtu/ft² is about 21% below the average of 238.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 11.6 kgCO₂e/ft² is about 18% below the group average of 14.1 kgCO₂e/ft².

At 112,280 sq ft, it is about 74% below the average floor area of 432,386 sq ft for those buildings. It was built in 1990, 13 years later than the group's average year built (1978). Across all 24 jurisdictions BuildingCensus covers, the 748 hospital (general medical & surgical) buildings average an ENERGY STAR score of 59 and a site EUI of 238.7 kBtu/ft².

What does an ENERGY STAR score of 90 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 90 means the building performs better than about 90% of its national peers. BuildingCensus bands the score into report-card grades; 90 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. University Medical Center - North Tower's 188.8 kBtu/ft² across 112,280 sq ft works out to about 21.2 billion Btu (6,213 MWh-equivalent) in 2022. The disclosure also reports 3,418,976 kWh of electricity and 95,190 therms of natural gas for the year.

Which law requires University Medical Center - North Tower to report its energy use?

University Medical Center - North Tower reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2022 disclosure (source record california:27517549:2022). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More hospital (general medical & surgical) buildings in California

Frequently asked questions

What is University Medical Center - North Tower's energy grade?

University Medical Center - North Tower scores 90 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2022 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does University Medical Center - North Tower use?

Its 2022 site energy-use intensity was 188.8 kBtu/ft² across 112,280 sq ft, including 3,418,976 kWh of electricity and 95,190 therms of natural gas.

What are University Medical Center - North Tower's carbon emissions?

University Medical Center - North Tower reported 1,305 tCO₂e of greenhouse-gas emissions (11.6 kgCO₂e/ft²) for 2022.

Where is University Medical Center - North Tower?

University Medical Center - North Tower is at 445 S Cedar, Fresno, in Fresno, California 93702. Its coordinates are 36.73793, -119.75341 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is University Medical Center - North Tower and when was it built?

University Medical Center - North Tower has 112,280 sq ft of gross floor area, as reported in its 2022 disclosure. The disclosure lists 1990 as its year built. It is classed as hospital (general medical & surgical).

Is University Medical Center - North Tower covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2022 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “University Medical Center - North Tower, Fresno, California — 2022 benchmarking disclosure”, https://buildingcensus.com/buildings/california/university-medical-center-north-tower-86a7bb31 (data as of July 9, 2026).