BuildingCensus

Water_Miramar Wtp (All_Filtration Plant, Lake Reservoir, Fs 37 Trailer Etc)

Other - Public Services in California, CA · 1000 Miramar Dam Rd, San Diego · 92126

ENERGY STAR score
not reported · 2022
Site EUI
162.5
kBtu/ft²
GHG emissions
1,238
tCO₂e
GHG intensity
11.3
kgCO₂e/ft²
Floor area
109,682
sq ft
Year built
2005
vintage
◆ Loading map…
85–10070–8455–691–54
Location

AB 802 (Public Resources Code §25402.10) · reporting year 2022

Benchmarking record

FieldValue
ENERGY STAR score
Site EUI162.5 kBtu/ft²
Source EUI
GHG emissions1,238 tCO₂e
GHG intensity11.3 kgCO₂e/ft²
Electricity5,219,896 kWh
Natural gas3,250 therms
Gross floor area109,682 sq ft
Source recordcalifornia:9112273:2022

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2022latest162.5 kBtu/ft²1,238 tCO₂e
2021169.2 kBtu/ft²1,131 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owner listed in the disclosure.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1000 Miramar Dam Rd, San Diego
State
California
ZIP
92126
Coordinates
32.64863, -117.14810

Within ~1 km

Nearby benchmarked buildings

No other benchmarked buildings within ~1 km.

See also: most efficient in California · biggest emitters

Frequently asked questions

What is Water_Miramar Wtp (All_Filtration Plant, Lake Reservoir, Fs 37 Trailer Etc)'s energy grade?

Water_Miramar Wtp (All_Filtration Plant, Lake Reservoir, Fs 37 Trailer Etc) did not report an ENERGY STAR score in its 2022 disclosure, but its site energy-use intensity was 162.5 kBtu/ft².

How much energy does Water_Miramar Wtp (All_Filtration Plant, Lake Reservoir, Fs 37 Trailer Etc) use?

Its 2022 site energy-use intensity was 162.5 kBtu/ft² across 109,682 sq ft, including 5,219,896 kWh of electricity and 3,250 therms of natural gas.

What are Water_Miramar Wtp (All_Filtration Plant, Lake Reservoir, Fs 37 Trailer Etc)'s carbon emissions?

Water_Miramar Wtp (All_Filtration Plant, Lake Reservoir, Fs 37 Trailer Etc) reported 1,238 tCO₂e of greenhouse-gas emissions (11.3 kgCO₂e/ft²) for 2022. AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Dataset updated . Source: Building Energy Benchmarking Program (statewide) disclosure, record california:9112273:2022.