BuildingCensus
–

Woodside Central/ 631

Strip Mall in California, CA · 2501 El Camino Real, Redwood City · 94061

At a glance

Woodside Central/ 631 is a 80,591-square-foot strip mall building at 2501 El Camino Real, Redwood City in Redwood City, California, built in 1993. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 69.5 kBtu/ft² and 336 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
69.5
kBtu/ft²
GHG emissions
336
tCO₂e
GHG intensity
4.2
kgCO₂e/ft²
Floor area
80,591
sq ft
Year built
1993
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI69.5 kBtu/ft²
Source EUI—
GHG emissions336 tCO₂e
GHG intensity4.2 kgCO₂e/ft²
Electricity1,045,655 kWh
Natural gas18,668 therms
Gross floor area80,591 sq ft
Source recordcalifornia:13121190:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—69.5 kBtu/ft²336 tCO₂e
2023—68.3 kBtu/ft²350 tCO₂e
2022—70.6 kBtu/ft²357 tCO₂e
2021—65.6 kBtu/ft²337 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
2501 El Camino Real, Redwood City
State
California
ZIP
94061
Coordinates
37.47361, -122.21737

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Woodside Central/ 631 compare with other strip mall buildings in California?

The latest disclosures cover 937 strip mall buildings in California, out of 40,029 buildings citywide. Its site EUI of 69.5 kBtu/ft² is roughly in line with the average of 75.2 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 4.2 kgCO₂e/ft² is about 11% below the group average of 4.7 kgCO₂e/ft².

At 80,591 sq ft, it is about 36% below the average floor area of 125,816 sq ft for those buildings. It was built in 1993, 8 years later than the group's average year built (1985). Across all 24 jurisdictions BuildingCensus covers, the 1,607 strip mall buildings average an ENERGY STAR score of 68 and a site EUI of 83.1 kBtu/ft².

How has Woodside Central/ 631's energy performance changed over time?

BuildingCensus holds 4 California disclosures for Woodside Central/ 631, covering report years 2021–2024. Site EUI moved from 65.6 kBtu/ft² (2021) to 69.5 kBtu/ft² (2024), an 6% increase. Reported emissions went from 337 tCO₂e to 336 tCO₂e over the same span (down 0%).

What does a site EUI of 69.5 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Woodside Central/ 631's 69.5 kBtu/ft² across 80,591 sq ft works out to about 5.6 billion Btu (1,642 MWh-equivalent) in 2024. The disclosure also reports 1,045,655 kWh of electricity and 18,668 therms of natural gas for the year.

Which law requires Woodside Central/ 631 to report its energy use?

Woodside Central/ 631 reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:13121190:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More strip mall buildings in California

Frequently asked questions

What is Woodside Central/ 631's energy grade?

Woodside Central/ 631 did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 69.5 kBtu/ft².

How much energy does Woodside Central/ 631 use?

Its 2024 site energy-use intensity was 69.5 kBtu/ft² across 80,591 sq ft, including 1,045,655 kWh of electricity and 18,668 therms of natural gas.

What are Woodside Central/ 631's carbon emissions?

Woodside Central/ 631 reported 336 tCO₂e of greenhouse-gas emissions (4.2 kgCO₂e/ft²) for 2024.

Where is Woodside Central/ 631?

Woodside Central/ 631 is at 2501 El Camino Real, Redwood City, in Redwood City, California 94061. Its coordinates are 37.47361, -122.21737 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Woodside Central/ 631 and when was it built?

Woodside Central/ 631 has 80,591 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1993 as its year built. It is classed as strip mall.

Is Woodside Central/ 631 covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Woodside Central/ 631, Redwood City, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/woodside-central-631-13195e14 (data as of July 9, 2026).