BuildingCensus
–

Wp&A King Facility

Manufacturing/Industrial Plant in California, CA · 15853 Brown Material Road, Lost Hills · 93249

At a glance

Wp&A King Facility is a 277,565-square-foot manufacturing/industrial plant at 15853 Brown Material Road, Lost Hills in Lost Hills, California, built in 1980. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 724.7 kBtu/ft² and 10,881 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
724.7
kBtu/ft²
GHG emissions
10,881
tCO₂e
GHG intensity
39.2
kgCO₂e/ft²
Floor area
277,565
sq ft
Year built
1980
vintage
◆ Loading map…
85–10070–8455–691–54
Location

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI724.7 kBtu/ft²
Source EUI—
GHG emissions10,881 tCO₂e
GHG intensity39.2 kgCO₂e/ft²
Electricity4,347,305 kWh
Natural gas1,863,185 therms
Gross floor area277,565 sq ft
Source recordcalifornia:6344866:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—724.7 kBtu/ft²10,881 tCO₂e
2023—833.3 kBtu/ft²12,742 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
15853 Brown Material Road, Lost Hills
State
California
ZIP
93249
Coordinates
35.57604, -119.79223

Within ~1 km

Nearby benchmarked buildings

No other benchmarked buildings within ~1 km.

See also: most efficient in California · biggest emitters

How does Wp&A King Facility compare with other manufacturing/industrial plant buildings in California?

The latest disclosures cover 982 manufacturing/industrial plant buildings in California, out of 40,029 buildings citywide. Its site EUI of 724.7 kBtu/ft² is about 468% above the average of 127.7 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 39.2 kgCO₂e/ft² is about 430% above the group average of 7.4 kgCO₂e/ft².

At 277,565 sq ft, it is about twice the average floor area of 135,409 sq ft for those buildings. Its 1980 construction date is close to the group's average year built (1982). Across all 24 jurisdictions BuildingCensus covers, the 2,372 manufacturing/industrial plant buildings average an ENERGY STAR score of 67 and a site EUI of 126.3 kBtu/ft².

How has Wp&A King Facility's energy performance changed over time?

BuildingCensus holds 2 California disclosures for Wp&A King Facility, covering report years 2023–2024. Site EUI moved from 833.3 kBtu/ft² (2023) to 724.7 kBtu/ft² (2024), a 13% decrease. Reported emissions went from 12,742 tCO₂e to 10,881 tCO₂e over the same span (down 15%).

What does a site EUI of 724.7 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Wp&A King Facility's 724.7 kBtu/ft² across 277,565 sq ft works out to about 201.2 billion Btu (58,952 MWh-equivalent) in 2024. The disclosure also reports 4,347,305 kWh of electricity and 1,863,185 therms of natural gas for the year.

Which law requires Wp&A King Facility to report its energy use?

Wp&A King Facility reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:6344866:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More manufacturing/industrial plant buildings in California

Frequently asked questions

What is Wp&A King Facility's energy grade?

Wp&A King Facility did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 724.7 kBtu/ft².

How much energy does Wp&A King Facility use?

Its 2024 site energy-use intensity was 724.7 kBtu/ft² across 277,565 sq ft, including 4,347,305 kWh of electricity and 1,863,185 therms of natural gas.

What are Wp&A King Facility's carbon emissions?

Wp&A King Facility reported 10,881 tCO₂e of greenhouse-gas emissions (39.2 kgCO₂e/ft²) for 2024.

Where is Wp&A King Facility?

Wp&A King Facility is at 15853 Brown Material Road, Lost Hills, in Lost Hills, California 93249. Its coordinates are 35.57604, -119.79223 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Wp&A King Facility and when was it built?

Wp&A King Facility has 277,565 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1980 as its year built. It is classed as manufacturing/industrial plant.

Is Wp&A King Facility covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Wp&A King Facility, Lost Hills, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/wp-a-king-facility-68918202 (data as of July 9, 2026).