BuildingCensus
A

21 Harvard Yard

Residence Hall/Dormitory in Cambridge, MA

At a glance

21 Harvard Yard is a 57,869-square-foot residence hall/dormitory in Cambridge, Massachusetts, built in 1870. In its 2024 Cambridge benchmarking disclosure it reported an ENERGY STAR score of 88 out of 100 (grade A), a site energy-use intensity of 48.7 kBtu/ft² and 189 tCO₂e of greenhouse-gas emissions. That score is higher than 67% of the 27 scored residence hall/dormitory buildings in Cambridge.

ENERGY STAR score
88
band A · 2024
Site EUI
48.7
kBtu/ft²
GHG emissions
189
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
57,869
sq ft
Year built
1870
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

BEUDO · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score88 (band A)
Site EUI48.7 kBtu/ft²
Source EUI79.9 kBtu/ft²
GHG emissions189 tCO₂e
GHG intensity—
Electricity232,034 kWh
Natural gas2,211 therms
Water use1,792 kgal
Gross floor area57,869 sq ft
Source recordcambridge:B1148:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest88±048.7 kBtu/ft²189 tCO₂e
202388±046.0 kBtu/ft²178 tCO₂e
202288-247.5 kBtu/ft²182 tCO₂e
202190-346.7 kBtu/ft²180 tCO₂e
202093+442.0 kBtu/ft²161 tCO₂e
201989+149.9 kBtu/ft²186 tCO₂e
201888+351.2 kBtu/ft²195 tCO₂e
201785±053.9 kBtu/ft²211 tCO₂e
201685-251.2 kBtu/ft²202 tCO₂e
20158749.9 kBtu/ft²198 tCO₂e

Compliance context

BEUDO

Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

Program details →

Ownership

PRESIDENT & FELLOWS OF HARVARD COLLEGE

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
21 Harvard Yard
State
Massachusetts
Coordinates
42.37500, -71.11670

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Cambridge · biggest emitters

How does 21 Harvard Yard compare with other residence hall/dormitory buildings in Cambridge?

The latest disclosures cover 43 residence hall/dormitory buildings in Cambridge, out of 902 buildings citywide. 21 Harvard Yard's ENERGY STAR score of 88 compares with an average of 80 across the 27 that report a score; it scores higher than 67% of them and lower than 30%. Its site EUI of 48.7 kBtu/ft² is about 31% below the average of 70.2 kBtu/ft² — it uses less energy per square foot than the typical building in that group.

At 57,869 sq ft, it is about 43% below the average floor area of 102,348 sq ft for those buildings. It was built in 1870, 46 years earlier than the group's average year built (1916). Across all 24 jurisdictions BuildingCensus covers, the 702 residence hall/dormitory buildings average an ENERGY STAR score of 70 and a site EUI of 70.7 kBtu/ft².

How has 21 Harvard Yard's energy performance changed over time?

BuildingCensus holds 10 Cambridge disclosures for 21 Harvard Yard, covering report years 2015–2024. Its ENERGY STAR score went from 87 in 2015 to 88 in 2024 (+1 points); its best year on file was 2020, at 93. Site EUI moved from 49.9 kBtu/ft² (2015) to 48.7 kBtu/ft² (2024), a 2% decrease. Reported emissions went from 198 tCO₂e to 189 tCO₂e over the same span (down 5%).

What does an ENERGY STAR score of 88 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 88 means the building performs better than about 88% of its national peers. BuildingCensus bands the score into report-card grades; 88 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In Cambridge, 50% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 21 Harvard Yard's 48.7 kBtu/ft² across 57,869 sq ft works out to about 2.8 billion Btu (826 MWh-equivalent) in 2024. Its source EUI of 79.9 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 232,034 kWh of electricity, 2,211 therms of natural gas and 1,792 thousand gallons of water for the year.

Which law requires 21 Harvard Yard to report its energy use?

21 Harvard Yard reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1148:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

More residence hall/dormitory buildings in Cambridge

Frequently asked questions

What is 21 Harvard Yard's energy grade?

21 Harvard Yard scores 88 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2024 Cambridge disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does 21 Harvard Yard use?

Its 2024 site energy-use intensity was 48.7 kBtu/ft² (79.9 kBtu/ft² source) across 57,869 sq ft, including 232,034 kWh of electricity and 2,211 therms of natural gas.

What are 21 Harvard Yard's carbon emissions?

21 Harvard Yard reported 189 tCO₂e of greenhouse-gas emissions for 2024.

Where is 21 Harvard Yard?

21 Harvard Yard is in Cambridge, Massachusetts. Its coordinates are 42.37500, -71.11670 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.

How big is 21 Harvard Yard and when was it built?

21 Harvard Yard has 57,869 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1870 as its year built. It is classed as residence hall/dormitory.

Is 21 Harvard Yard covered by BEUDO?

Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.

Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “21 Harvard Yard, Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/21-harvard-yard-8db2af1b (data as of October 2, 2026).