BuildingCensus
–

225 Monsignor O'Brien Hwy.

Manufacturing/Industrial Plant in Cambridge, MA

At a glance

225 Monsignor O'Brien Hwy. is a 65,704-square-foot manufacturing/industrial plant in Cambridge, Massachusetts, built in 1931. In its 2024 Cambridge benchmarking disclosure it reported a site energy-use intensity of 90.2 kBtu/ft² and 349 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
90.2
kBtu/ft²
GHG emissions
349
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
65,704
sq ft
Year built
1931
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

BEUDO · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI90.2 kBtu/ft²
Source EUI142.8 kBtu/ft²
GHG emissions349 tCO₂e
GHG intensity—
Electricity529,600 kWh
Natural gas41,187 therms
Water use1,047 kgal
Gross floor area65,704 sq ft
Source recordcambridge:B1671:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—90.2 kBtu/ft²349 tCO₂e
2023——0 tCO₂e
2022——0 tCO₂e
2021——140 tCO₂e
2020—99.7 kBtu/ft²385 tCO₂e
2019——0 tCO₂e
2018—99.7 kBtu/ft²380 tCO₂e
2017—100.2 kBtu/ft²390 tCO₂e
2016—97.5 kBtu/ft²380 tCO₂e
2015—104.1 kBtu/ft²408 tCO₂e

Compliance context

BEUDO

Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

Program details →

Ownership

EASTMAN BROOK LLC,

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
225 Monsignor O'Brien Hwy.
State
Massachusetts
Coordinates
42.37320, -71.08030

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Cambridge · biggest emitters

How does 225 Monsignor O'Brien Hwy. compare with other buildings in Cambridge?

The latest disclosures cover 902 benchmarked buildings in Cambridge. Its site EUI of 90.2 kBtu/ft² is about 23% below the average of 117.2 kBtu/ft² — it uses less energy per square foot than the typical building in that group.

At 65,704 sq ft, it is about 43% below the average floor area of 114,869 sq ft for those buildings. It was built in 1931, 31 years earlier than the group's average year built (1962). Across all 24 jurisdictions BuildingCensus covers, the 2,372 manufacturing/industrial plant buildings average an ENERGY STAR score of 67 and a site EUI of 126.3 kBtu/ft².

How has 225 Monsignor O'Brien Hwy.'s energy performance changed over time?

BuildingCensus holds 10 Cambridge disclosures for 225 Monsignor O'Brien Hwy., covering report years 2015–2024. Site EUI moved from 104.1 kBtu/ft² (2015) to 90.2 kBtu/ft² (2024), a 13% decrease. Reported emissions went from 408 tCO₂e to 349 tCO₂e over the same span (down 14%).

What does a site EUI of 90.2 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 225 Monsignor O'Brien Hwy.'s 90.2 kBtu/ft² across 65,704 sq ft works out to about 5.9 billion Btu (1,737 MWh-equivalent) in 2024. Its source EUI of 142.8 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 529,600 kWh of electricity, 41,187 therms of natural gas and 1,047 thousand gallons of water for the year.

Which law requires 225 Monsignor O'Brien Hwy. to report its energy use?

225 Monsignor O'Brien Hwy. reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1671:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

More manufacturing/industrial plant buildings in Cambridge

Frequently asked questions

What is 225 Monsignor O'Brien Hwy.'s energy grade?

225 Monsignor O'Brien Hwy. did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 90.2 kBtu/ft².

How much energy does 225 Monsignor O'Brien Hwy. use?

Its 2024 site energy-use intensity was 90.2 kBtu/ft² (142.8 kBtu/ft² source) across 65,704 sq ft, including 529,600 kWh of electricity and 41,187 therms of natural gas.

What are 225 Monsignor O'Brien Hwy.'s carbon emissions?

225 Monsignor O'Brien Hwy. reported 349 tCO₂e of greenhouse-gas emissions for 2024.

Where is 225 Monsignor O'Brien Hwy.?

225 Monsignor O'Brien Hwy. is in Cambridge, Massachusetts. Its coordinates are 42.37320, -71.08030 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.

How big is 225 Monsignor O'Brien Hwy. and when was it built?

225 Monsignor O'Brien Hwy. has 65,704 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1931 as its year built. It is classed as manufacturing/industrial plant.

Is 225 Monsignor O'Brien Hwy. covered by BEUDO?

Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.

Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “225 Monsignor O'Brien Hwy., Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/225-monsignor-o-brien-hwy-a1e3628b (data as of October 2, 2026).