BuildingCensus
–

250R Fresh Pond Parkway

Parking in Cambridge, MA

At a glance

250R Fresh Pond Parkway is a 8,792-square-foot parking building in Cambridge, Massachusetts, built in 2004. In its 2024 Cambridge benchmarking disclosure it reported a site energy-use intensity of 152.0 kBtu/ft² and 76 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
152.0
kBtu/ft²
GHG emissions
76
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
8,792
sq ft
Year built
2004
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

BEUDO · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI152.0 kBtu/ft²
Source EUI211.1 kBtu/ft²
GHG emissions76 tCO₂e
GHG intensity—
Electricity75,722 kWh
Natural gas10,782 therms
Gross floor area8,792 sq ft
Source recordcambridge:B1032:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—152.0 kBtu/ft²76 tCO₂e
2023—142.0 kBtu/ft²71 tCO₂e
2022—151.5 kBtu/ft²76 tCO₂e
2021—153.6 kBtu/ft²77 tCO₂e
2020—128.2 kBtu/ft²64 tCO₂e
2019—178.2 kBtu/ft²87 tCO₂e
2018—183.9 kBtu/ft²92 tCO₂e
2017—153.8 kBtu/ft²81 tCO₂e
2016—151.7 kBtu/ft²80 tCO₂e
2015—190.1 kBtu/ft²100 tCO₂e

Compliance context

BEUDO

Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

Program details →

Ownership

CAMBRIDGE CITY OF

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
250R Fresh Pond Parkway
State
Massachusetts
Coordinates
42.38230, -71.14470

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Cambridge · biggest emitters

How does 250R Fresh Pond Parkway compare with other parking buildings in Cambridge?

The latest disclosures cover 12 parking buildings in Cambridge, out of 902 buildings citywide. Its site EUI of 152.0 kBtu/ft² is about 87% above the average of 81.1 kBtu/ft² — it uses more energy per square foot than the typical building in that group.

At 8,792 sq ft, it is about 95% below the average floor area of 188,340 sq ft for those buildings. It was built in 2004, 16 years later than the group's average year built (1988). Across all 24 jurisdictions BuildingCensus covers, the 1,071 parking buildings average an ENERGY STAR score of 67 and a site EUI of 40.3 kBtu/ft².

How has 250R Fresh Pond Parkway's energy performance changed over time?

BuildingCensus holds 10 Cambridge disclosures for 250R Fresh Pond Parkway, covering report years 2015–2024. Site EUI moved from 190.1 kBtu/ft² (2015) to 152.0 kBtu/ft² (2024), a 20% decrease. Reported emissions went from 100 tCO₂e to 76 tCO₂e over the same span (down 24%).

What does a site EUI of 152.0 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 250R Fresh Pond Parkway's 152.0 kBtu/ft² across 8,792 sq ft works out to about 1.3 billion Btu (392 MWh-equivalent) in 2024. Its source EUI of 211.1 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 75,722 kWh of electricity and 10,782 therms of natural gas for the year.

Which law requires 250R Fresh Pond Parkway to report its energy use?

250R Fresh Pond Parkway reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1032:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

More parking buildings in Cambridge

Frequently asked questions

What is 250R Fresh Pond Parkway's energy grade?

250R Fresh Pond Parkway did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 152.0 kBtu/ft².

How much energy does 250R Fresh Pond Parkway use?

Its 2024 site energy-use intensity was 152.0 kBtu/ft² (211.1 kBtu/ft² source) across 8,792 sq ft, including 75,722 kWh of electricity and 10,782 therms of natural gas.

What are 250R Fresh Pond Parkway's carbon emissions?

250R Fresh Pond Parkway reported 76 tCO₂e of greenhouse-gas emissions for 2024.

Where is 250R Fresh Pond Parkway?

250R Fresh Pond Parkway is in Cambridge, Massachusetts. Its coordinates are 42.38230, -71.14470 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.

How big is 250R Fresh Pond Parkway and when was it built?

250R Fresh Pond Parkway has 8,792 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2004 as its year built. It is classed as parking.

Is 250R Fresh Pond Parkway covered by BEUDO?

Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.

Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “250R Fresh Pond Parkway, Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/250r-fresh-pond-parkway-9e21688f (data as of October 2, 2026).