BuildingCensus
A

40 Gerry's Landing Rd.

K-12 School in Cambridge, MA

At a glance

40 Gerry's Landing Rd. is a 3,825-square-foot K-12 school in Cambridge, Massachusetts, built in 1948. In its 2024 Cambridge benchmarking disclosure it reported an ENERGY STAR score of 94 out of 100 (grade A), a site energy-use intensity of 18.9 kBtu/ft² and 5 tCO₂e of greenhouse-gas emissions. That score is higher than 92% of the 38 scored K-12 school buildings in Cambridge.

ENERGY STAR score
94
band A · 2024
Site EUI
18.9
kBtu/ft²
GHG emissions
5
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
3,825
sq ft
Year built
1948
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

BEUDO · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score94 (band A)
Site EUI18.9 kBtu/ft²
Source EUI52.1 kBtu/ft²
GHG emissions5 tCO₂e
GHG intensity—
Electricity20,640 kWh
Natural gas19 therms
Water use0 kgal
Gross floor area3,825 sq ft
Source recordcambridge:B1696:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest94-318.9 kBtu/ft²5 tCO₂e
202397+116.4 kBtu/ft²5 tCO₂e
202296+2517.4 kBtu/ft²5 tCO₂e
202171-554.7 kBtu/ft²12 tCO₂e
202076+2054.9 kBtu/ft²12 tCO₂e
201956-1071.8 kBtu/ft²15 tCO₂e
20186665.6 kBtu/ft²14 tCO₂e
2017——0 tCO₂e
2016——0 tCO₂e
2015——0 tCO₂e

Compliance context

BEUDO

Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

Program details →

Ownership

BUCKINGHAM BROWNE AND NICHOLS SCHOOL

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
40 Gerry's Landing Rd.
State
Massachusetts
Coordinates
42.37330, -71.13580

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Cambridge · biggest emitters

How does 40 Gerry's Landing Rd. compare with other K-12 school buildings in Cambridge?

The latest disclosures cover 45 K-12 school buildings in Cambridge, out of 902 buildings citywide. 40 Gerry's Landing Rd.'s ENERGY STAR score of 94 compares with an average of 60 across the 38 that report a score; it scores higher than 92% of them and lower than 5%. Its site EUI of 18.9 kBtu/ft² is about 70% below the average of 62.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group.

At 3,825 sq ft, it is about 94% below the average floor area of 61,739 sq ft for those buildings. It was built in 1948, 8 years earlier than the group's average year built (1956). Across all 24 jurisdictions BuildingCensus covers, the 6,548 K-12 school buildings average an ENERGY STAR score of 64 and a site EUI of 52.7 kBtu/ft².

How has 40 Gerry's Landing Rd.'s energy performance changed over time?

BuildingCensus holds 10 Cambridge disclosures for 40 Gerry's Landing Rd., covering report years 2015–2024. Its ENERGY STAR score went from 66 in 2018 to 94 in 2024 (+28 points); its best year on file was 2023, at 97. Site EUI moved from 65.6 kBtu/ft² (2018) to 18.9 kBtu/ft² (2024), a 71% decrease.

What does an ENERGY STAR score of 94 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 94 means the building performs better than about 94% of its national peers. BuildingCensus bands the score into report-card grades; 94 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In Cambridge, 50% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 40 Gerry's Landing Rd.'s 18.9 kBtu/ft² across 3,825 sq ft works out to about 0.1 billion Btu (21 MWh-equivalent) in 2024. Its source EUI of 52.1 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 20,640 kWh of electricity, 19 therms of natural gas and 0 thousand gallons of water for the year.

Which law requires 40 Gerry's Landing Rd. to report its energy use?

40 Gerry's Landing Rd. reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1696:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

More K-12 school buildings in Cambridge

Frequently asked questions

What is 40 Gerry's Landing Rd.'s energy grade?

40 Gerry's Landing Rd. scores 94 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2024 Cambridge disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does 40 Gerry's Landing Rd. use?

Its 2024 site energy-use intensity was 18.9 kBtu/ft² (52.1 kBtu/ft² source) across 3,825 sq ft, including 20,640 kWh of electricity and 19 therms of natural gas.

What are 40 Gerry's Landing Rd.'s carbon emissions?

40 Gerry's Landing Rd. reported 5 tCO₂e of greenhouse-gas emissions for 2024.

Where is 40 Gerry's Landing Rd.?

40 Gerry's Landing Rd. is in Cambridge, Massachusetts. Its coordinates are 42.37330, -71.13580 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.

How big is 40 Gerry's Landing Rd. and when was it built?

40 Gerry's Landing Rd. has 3,825 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1948 as its year built. It is classed as K-12 school.

Is 40 Gerry's Landing Rd. covered by BEUDO?

Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.

Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “40 Gerry's Landing Rd., Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/40-gerry-s-landing-rd-5b52d998 (data as of October 2, 2026).