75 Moulton and 20 Wilson
Laboratory in Cambridge, MA
At a glance
75 Moulton and 20 Wilson is a 36,304-square-foot laboratory building in Cambridge, Massachusetts, built in 2019. In its 2024 Cambridge benchmarking disclosure it reported a site energy-use intensity of 259.7 kBtu/ft² and 596 tCO₂e of greenhouse-gas emissions.
BEUDO · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 259.7 kBtu/ft² |
| Source EUI | 512.4 kBtu/ft² |
| GHG emissions | 596 tCO₂e |
| GHG intensity | — |
| Electricity | 1,457,089 kWh |
| Natural gas | 44,579 therms |
| Gross floor area | 36,304 sq ft |
| Source record | cambridge:B1093:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | — | 259.7 kBtu/ft² | 596 tCO₂e | |
| 2023 | — | 250.0 kBtu/ft² | 575 tCO₂e | |
| 2022 | — | 253.2 kBtu/ft² | 580 tCO₂e | |
| 2021 | — | 250.2 kBtu/ft² | 577 tCO₂e | |
| 2020 | — | — | 0 tCO₂e | |
| 2019 | — | — | 0 tCO₂e | |
| 2018 | 98 | 6.1 kBtu/ft² | 16 tCO₂e | |
| 2017 | — | — | 0 tCO₂e | |
| 2016 | 100 | 4.9 kBtu/ft² | 13 tCO₂e | |
| 2015 | — | — | 0 tCO₂e |
Compliance context
BEUDO
Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).
Ownership
QUAD 75 MOULTON STREET &
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 75 Moulton and 20 Wilson
- City
- Cambridge
- State
- Massachusetts
- Coordinates
- 42.39240, -71.14850
Within ~1 km
Nearby benchmarked buildings
- 130 Cambridge Park Dr,score 100
Multifamily Housing · 546,321 sq ft
- 55 Wheeler Stscore 100
Multifamily Housing · 465,129 sq ft
- 160 Cambridge Park Drscore 100
Multifamily Housing · 440,187 sq ft
- 80 Fawcett Streetscore 87
Multifamily Housing · 374,241 sq ft
- 30 Cambridge Park Drivescore 99
Multifamily Housing · 348,420 sq ft
- 50 Cambridgepark Drscore 100
Multifamily Housing · 344,122 sq ft
See also: most efficient in Cambridge · biggest emitters
How does 75 Moulton and 20 Wilson compare with other laboratory buildings in Cambridge?
The latest disclosures cover 88 laboratory buildings in Cambridge, out of 902 buildings citywide. Its site EUI of 259.7 kBtu/ft² is roughly in line with the average of 272.6 kBtu/ft² — it uses less energy per square foot than the typical building in that group.
At 36,304 sq ft, it is about 80% below the average floor area of 181,468 sq ft for those buildings. It was built in 2019, 35 years later than the group's average year built (1984). Across all 24 jurisdictions BuildingCensus covers, the 795 laboratory buildings average an ENERGY STAR score of 29 and a site EUI of 231.7 kBtu/ft².
How has 75 Moulton and 20 Wilson's energy performance changed over time?
BuildingCensus holds 10 Cambridge disclosures for 75 Moulton and 20 Wilson, covering report years 2015–2024. Its ENERGY STAR score went from 100 in 2016 to 98 in 2018 (-2 points); its best year on file was 2016, at 100. Site EUI moved from 4.9 kBtu/ft² (2016) to 259.7 kBtu/ft² (2024), an 5200% increase.
What does a site EUI of 259.7 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 75 Moulton and 20 Wilson's 259.7 kBtu/ft² across 36,304 sq ft works out to about 9.4 billion Btu (2,763 MWh-equivalent) in 2024. Its source EUI of 512.4 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 1,457,089 kWh of electricity and 44,579 therms of natural gas for the year.
Which law requires 75 Moulton and 20 Wilson to report its energy use?
75 Moulton and 20 Wilson reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1093:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).
More laboratory buildings in Cambridge
- 12 Emily Street· 31,949 sq ft · EUI 200.9 kBtu/ft²
- 205 Alewife Brook Parkway· 28,054 sq ft · EUI 2594.5 kBtu/ft²
- 99 Erie ST· 27,960 sq ft · EUI 67.9 kBtu/ft²
- 167 Sidney St· 26,589 sq ft · EUI 202.3 kBtu/ft²
- 767 Concord Ave· 20,210 sq ft · EUI 132.2 kBtu/ft²
- 179 Bent St.· 15,920 sq ft · EUI 258.5 kBtu/ft²
- Laboratory buildings in Cambridge· 88 benchmarked
- All Cambridge benchmarked buildings· BEUDO
- Most efficient large buildings in Cambridge
- Least efficient large buildings in Cambridge
- Biggest emitters in Cambridge
Frequently asked questions
What is 75 Moulton and 20 Wilson's energy grade?
75 Moulton and 20 Wilson did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 259.7 kBtu/ft².
How much energy does 75 Moulton and 20 Wilson use?
Its 2024 site energy-use intensity was 259.7 kBtu/ft² (512.4 kBtu/ft² source) across 36,304 sq ft, including 1,457,089 kWh of electricity and 44,579 therms of natural gas.
What are 75 Moulton and 20 Wilson's carbon emissions?
75 Moulton and 20 Wilson reported 596 tCO₂e of greenhouse-gas emissions for 2024.
Where is 75 Moulton and 20 Wilson?
75 Moulton and 20 Wilson is in Cambridge, Massachusetts. Its coordinates are 42.39240, -71.14850 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.
How big is 75 Moulton and 20 Wilson and when was it built?
75 Moulton and 20 Wilson has 36,304 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2019 as its year built. It is classed as laboratory.
Is 75 Moulton and 20 Wilson covered by BEUDO?
Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.
Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “75 Moulton and 20 Wilson, Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/75-moulton-and-20-wilson-4039af9d (data as of October 2, 2026).