BuildingCensus
B

777 Memorial Drive

Hotel in Cambridge, MA

At a glance

777 Memorial Drive is a 105,000-square-foot hotel in Cambridge, Massachusetts, built in 2000. In its 2024 Cambridge benchmarking disclosure it reported an ENERGY STAR score of 72 out of 100 (grade B), a site energy-use intensity of 55.3 kBtu/ft² and 419 tCO₂e of greenhouse-gas emissions. That score is higher than 61% of the 18 scored hotel buildings in Cambridge.

ENERGY STAR score
72
band B · 2024
Site EUI
55.3
kBtu/ft²
GHG emissions
419
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
105,000
sq ft
Year built
2000
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

BEUDO · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score72 (band B)
Site EUI55.3 kBtu/ft²
Source EUI154.9 kBtu/ft²
GHG emissions419 tCO₂e
GHG intensity—
Electricity1,701,929 kWh
Natural gas0 therms
Water use6,445 kgal
Gross floor area105,000 sq ft
Source recordcambridge:B1314:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest72+3755.3 kBtu/ft²419 tCO₂e
202335-5114.3 kBtu/ft²743 tCO₂e
202240-27111.0 kBtu/ft²721 tCO₂e
20216783.2 kBtu/ft²553 tCO₂e
2020——0 tCO₂e
2019——0 tCO₂e
2018——0 tCO₂e
2017——0 tCO₂e
2016——0 tCO₂e
2015——0 tCO₂e

Compliance context

BEUDO

Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

Program details →

Ownership

777 MEMORIAL OWNER LP

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
777 Memorial Drive
State
Massachusetts
Coordinates
42.35870, -71.11470

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Cambridge · biggest emitters

How does 777 Memorial Drive compare with other hotel buildings in Cambridge?

The latest disclosures cover 19 hotel buildings in Cambridge, out of 902 buildings citywide. 777 Memorial Drive's ENERGY STAR score of 72 compares with an average of 55 across the 18 that report a score; it scores higher than 61% of them and lower than 33%. Its site EUI of 55.3 kBtu/ft² is about 44% below the average of 98.9 kBtu/ft² — it uses less energy per square foot than the typical building in that group.

At 105,000 sq ft, it is about 28% below the average floor area of 146,134 sq ft for those buildings. It was built in 2000, 11 years later than the group's average year built (1990). Across all 24 jurisdictions BuildingCensus covers, the 3,812 hotel buildings average an ENERGY STAR score of 65 and a site EUI of 77.8 kBtu/ft².

How has 777 Memorial Drive's energy performance changed over time?

BuildingCensus holds 10 Cambridge disclosures for 777 Memorial Drive, covering report years 2015–2024. Its ENERGY STAR score went from 67 in 2021 to 72 in 2024 (+5 points). Site EUI moved from 83.2 kBtu/ft² (2021) to 55.3 kBtu/ft² (2024), a 34% decrease.

What does an ENERGY STAR score of 72 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 72 means the building performs better than about 72% of its national peers. BuildingCensus bands the score into report-card grades; 72 falls in band B — above median (70–84). It sits 3 points below 75, the threshold for ENERGY STAR certification. In Cambridge, 50% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 777 Memorial Drive's 55.3 kBtu/ft² across 105,000 sq ft works out to about 5.8 billion Btu (1,702 MWh-equivalent) in 2024. Its source EUI of 154.9 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 1,701,929 kWh of electricity, 0 therms of natural gas and 6,445 thousand gallons of water for the year.

Which law requires 777 Memorial Drive to report its energy use?

777 Memorial Drive reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1314:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

More hotel buildings in Cambridge

Frequently asked questions

What is 777 Memorial Drive's energy grade?

777 Memorial Drive scores 72 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2024 Cambridge disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does 777 Memorial Drive use?

Its 2024 site energy-use intensity was 55.3 kBtu/ft² (154.9 kBtu/ft² source) across 105,000 sq ft, including 1,701,929 kWh of electricity and 0 therms of natural gas.

What are 777 Memorial Drive's carbon emissions?

777 Memorial Drive reported 419 tCO₂e of greenhouse-gas emissions for 2024.

Where is 777 Memorial Drive?

777 Memorial Drive is in Cambridge, Massachusetts. Its coordinates are 42.35870, -71.11470 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.

How big is 777 Memorial Drive and when was it built?

777 Memorial Drive has 105,000 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2000 as its year built. It is classed as hotel.

Is 777 Memorial Drive covered by BEUDO?

Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.

Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “777 Memorial Drive, Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/777-memorial-drive-b5b2afd2 (data as of October 2, 2026).