BuildingCensus
B

One Memorial Drive

Office in Cambridge, MA

At a glance

One Memorial Drive is a 369,436-square-foot office building in Cambridge, Massachusetts, built in 1985. In its 2024 Cambridge benchmarking disclosure it reported an ENERGY STAR score of 83 out of 100 (grade B), a site energy-use intensity of 49.5 kBtu/ft² and 1,307 tCO₂e of greenhouse-gas emissions. That score is higher than 71% of the 94 scored office buildings in Cambridge.

ENERGY STAR score
83
band B · 2024
Site EUI
49.5
kBtu/ft²
GHG emissions
1,307
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
369,436
sq ft
Year built
1985
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

BEUDO · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score83 (band B)
Site EUI49.5 kBtu/ft²
Source EUI135.2 kBtu/ft²
GHG emissions1,307 tCO₂e
GHG intensity—
Electricity5,147,977 kWh
Natural gas7,190 therms
Water use2,810 kgal
Gross floor area369,436 sq ft
Source recordcambridge:B1382:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest83+449.5 kBtu/ft²1,307 tCO₂e
202379+253.5 kBtu/ft²1,412 tCO₂e
202277±055.1 kBtu/ft²1,450 tCO₂e
202177+653.9 kBtu/ft²1,421 tCO₂e
202071+760.3 kBtu/ft²1,564 tCO₂e
201964+470.9 kBtu/ft²1,766 tCO₂e
20186074.3 kBtu/ft²2,012 tCO₂e
2017—77.3 kBtu/ft²2,209 tCO₂e
2016—81.0 kBtu/ft²2,299 tCO₂e
2015—86.0 kBtu/ft²2,513 tCO₂e

Compliance context

BEUDO

Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

Program details →

Ownership

ONE MEMORIAL OWNER LLC,

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
One Memorial Drive
State
Massachusetts
Coordinates
42.36160, -71.08130

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Cambridge · biggest emitters

How does One Memorial Drive compare with other office buildings in Cambridge?

The latest disclosures cover 117 office buildings in Cambridge, out of 902 buildings citywide. One Memorial Drive's ENERGY STAR score of 83 compares with an average of 64 across the 94 that report a score; it scores higher than 71% of them and lower than 27%. Its site EUI of 49.5 kBtu/ft² is about 37% below the average of 78.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group.

At 369,436 sq ft, it is about 205% above the average floor area of 121,167 sq ft for those buildings. It was built in 1985, 20 years later than the group's average year built (1965). Across all 24 jurisdictions BuildingCensus covers, the 15,264 office buildings average an ENERGY STAR score of 73 and a site EUI of 59.3 kBtu/ft².

How has One Memorial Drive's energy performance changed over time?

BuildingCensus holds 10 Cambridge disclosures for One Memorial Drive, covering report years 2015–2024. Its ENERGY STAR score went from 60 in 2018 to 83 in 2024 (+23 points). Site EUI moved from 86.0 kBtu/ft² (2015) to 49.5 kBtu/ft² (2024), a 42% decrease. Reported emissions went from 2,513 tCO₂e to 1,307 tCO₂e over the same span (down 48%).

What does an ENERGY STAR score of 83 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 83 means the building performs better than about 83% of its national peers. BuildingCensus bands the score into report-card grades; 83 falls in band B — above median (70–84). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In Cambridge, 50% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. One Memorial Drive's 49.5 kBtu/ft² across 369,436 sq ft works out to about 18.3 billion Btu (5,359 MWh-equivalent) in 2024. Its source EUI of 135.2 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 5,147,977 kWh of electricity, 7,190 therms of natural gas and 2,810 thousand gallons of water for the year.

Which law requires One Memorial Drive to report its energy use?

One Memorial Drive reports under BEUDO, the legal basis of Cambridge's Building Energy Use Disclosure Ordinance (BEUDO), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record cambridge:B1382:2024). Cambridge's 2023 BEUDO amendments require non-residential buildings of 100,000+ sq ft to reach net-zero emissions by 2035 (reductions starting 2026) and those of 25,000–100,000 sq ft by 2050 (starting 2030).

More office buildings in Cambridge

Frequently asked questions

What is One Memorial Drive's energy grade?

One Memorial Drive scores 83 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2024 Cambridge disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does One Memorial Drive use?

Its 2024 site energy-use intensity was 49.5 kBtu/ft² (135.2 kBtu/ft² source) across 369,436 sq ft, including 5,147,977 kWh of electricity and 7,190 therms of natural gas.

What are One Memorial Drive's carbon emissions?

One Memorial Drive reported 1,307 tCO₂e of greenhouse-gas emissions for 2024.

Where is One Memorial Drive?

One Memorial Drive is in Cambridge, Massachusetts. Its coordinates are 42.36160, -71.08130 (latitude, longitude), as published in the Building Energy Use Disclosure Ordinance (BEUDO) file.

How big is One Memorial Drive and when was it built?

One Memorial Drive has 369,436 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1985 as its year built. It is classed as office.

Is One Memorial Drive covered by BEUDO?

Yes — it appears in the 2024 Building Energy Use Disclosure Ordinance (BEUDO) disclosure, which lists the buildings reporting under BEUDO.

Working with Cambridge building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Use Disclosure Ordinance (BEUDO) (BEUDO), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “One Memorial Drive, Cambridge, Massachusetts — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/cambridge/one-memorial-drive-f23e7729 (data as of October 2, 2026).