BuildingCensus
–

Dove Lewis Animal Hospital

Other - Specialty Hospital in Portland, OR · 1945 NW PETTYGROVE ST

At a glance

Dove Lewis Animal Hospital is a 22,900-square-foot other - specialty hospital at 1945 NW PETTYGROVE ST in Portland, Oregon, built in 2005. In its 2024 Portland benchmarking disclosure it reported a site energy-use intensity of 234.9 kBtu/ft² and 449 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
234.9
kBtu/ft²
GHG emissions
449
tCO₂e
GHG intensity
—
kgCO₂e/ft²
Floor area
22,900
sq ft
Year built
2005
vintage

Commercial Building Energy Performance Reporting Policy · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI234.9 kBtu/ft²
Source EUI—
GHG emissions449 tCO₂e
GHG intensity—
Electricity1,181,882 kWh
Natural gas13,468 therms
Gross floor area22,900 sq ft
Source recordportland_or:1N1E33AB-10701-B1:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—234.9 kBtu/ft²449 tCO₂e
2023—243.1 kBtu/ft²434 tCO₂e

Compliance context

Commercial Building Energy Performance Reporting Policy

Portland requires commercial buildings over 20,000 sq ft to report energy performance annually, with civil penalties for buildings that fail to comply.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1945 NW PETTYGROVE ST
State
Oregon

Within ~1 km

Nearby benchmarked buildings

This source publishes no coordinates, so nearby buildings can't be resolved yet.

See also: most efficient in Portland · biggest emitters

How does Dove Lewis Animal Hospital compare with other buildings in Portland?

The latest disclosures cover 952 benchmarked buildings in Portland. Its site EUI of 234.9 kBtu/ft² is about 258% above the average of 65.6 kBtu/ft² — it uses more energy per square foot than the typical building in that group.

At 22,900 sq ft, it is about 80% below the average floor area of 113,003 sq ft for those buildings. It was built in 2005, 38 years later than the group's average year built (1968).

How has Dove Lewis Animal Hospital's energy performance changed over time?

BuildingCensus holds 2 Portland disclosures for Dove Lewis Animal Hospital, covering report years 2023–2024. Site EUI moved from 243.1 kBtu/ft² (2023) to 234.9 kBtu/ft² (2024), a 3% decrease. Reported emissions went from 434 tCO₂e to 449 tCO₂e over the same span (up 3%).

What does a site EUI of 234.9 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Dove Lewis Animal Hospital's 234.9 kBtu/ft² across 22,900 sq ft works out to about 5.4 billion Btu (1,576 MWh-equivalent) in 2024. The disclosure also reports 1,181,882 kWh of electricity and 13,468 therms of natural gas for the year.

Which law requires Dove Lewis Animal Hospital to report its energy use?

Dove Lewis Animal Hospital reports under the Commercial Building Energy Performance Reporting Policy, the legal basis of Portland's Commercial Building Energy Reporting program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record portland_or:1N1E33AB-10701-B1:2024). Portland requires commercial buildings over 20,000 sq ft to report energy performance annually, with civil penalties for buildings that fail to comply.

More other - specialty hospital buildings in Portland

Frequently asked questions

What is Dove Lewis Animal Hospital's energy grade?

Dove Lewis Animal Hospital did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 234.9 kBtu/ft².

How much energy does Dove Lewis Animal Hospital use?

Its 2024 site energy-use intensity was 234.9 kBtu/ft² across 22,900 sq ft, including 1,181,882 kWh of electricity and 13,468 therms of natural gas.

What are Dove Lewis Animal Hospital's carbon emissions?

Dove Lewis Animal Hospital reported 449 tCO₂e of greenhouse-gas emissions for 2024.

Where is Dove Lewis Animal Hospital?

Dove Lewis Animal Hospital is at 1945 NW PETTYGROVE ST, in Portland, Oregon.

How big is Dove Lewis Animal Hospital and when was it built?

Dove Lewis Animal Hospital has 22,900 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2005 as its year built. It is classed as other - specialty hospital.

Is Dove Lewis Animal Hospital covered by the Commercial Building Energy Performance Reporting Policy?

Yes — it appears in the 2024 Commercial Building Energy Reporting disclosure, which lists the buildings reporting under the Commercial Building Energy Performance Reporting Policy.

Working with Portland building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Commercial Building Energy Reporting (Commercial Building Energy Performance Reporting Policy), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Dove Lewis Animal Hospital, Portland, Oregon — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/portland/dove-lewis-animal-hospital-45258594 (data as of July 9, 2026).