BuildingCensus
D

BASTYR UNIVERSITY MEDICAL OFFICE BUILDING

Medical Office in Seattle, WA · 3670 STONE WAY N · 98103

At a glance

BASTYR UNIVERSITY MEDICAL OFFICE BUILDING is a 41,293-square-foot medical office at 3670 STONE WAY N in Seattle, Washington, built in 1940. In its 2024 Seattle benchmarking disclosure it reported an ENERGY STAR score of 42 out of 100 (grade D), a site energy-use intensity of 92.3 kBtu/ft² and 97 tCO₂e of greenhouse-gas emissions. That score is higher than 28% of the 32 scored medical office buildings in Seattle.

ENERGY STAR score
42
band D · 2024
Site EUI
92.3
kBtu/ft²
GHG emissions
97
tCO₂e
GHG intensity
2.6
kgCO₂e/ft²
Floor area
41,293
sq ft
Year built
1940
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score42 (band D)
Site EUI92.3 kBtu/ft²
Source EUI180.7 kBtu/ft²
GHG emissions97 tCO₂e
GHG intensity2.6 kgCO₂e/ft²
Electricity514,787 kWh
Natural gas16,304 therms
Gross floor area41,293 sq ft
Source recordseattle:24624:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest42-2092.3 kBtu/ft²97 tCO₂e
202362-378.0 kBtu/ft²80 tCO₂e
20226579.6 kBtu/ft²87 tCO₂e
2021———
2020—67.5 kBtu/ft²80 tCO₂e
2019—72.5 kBtu/ft²83 tCO₂e
2018—71.8 kBtu/ft²77 tCO₂e
2017—74.0 kBtu/ft²80 tCO₂e
2016—68.6 kBtu/ft²59 tCO₂e
2015—68.1 kBtu/ft²56 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
3670 STONE WAY N
State
Washington
ZIP
98103
Coordinates
47.65231, -122.34217

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does BASTYR UNIVERSITY MEDICAL OFFICE BUILDING compare with other medical office buildings in Seattle?

The latest disclosures cover 45 medical office buildings in Seattle, out of 3,871 buildings citywide. BASTYR UNIVERSITY MEDICAL OFFICE BUILDING's ENERGY STAR score of 42 compares with an average of 60 across the 32 that report a score; it scores higher than 28% of them and lower than 69%. Its site EUI of 92.3 kBtu/ft² is roughly in line with the average of 88.3 kBtu/ft². Its emissions intensity of 2.6 kgCO₂e/ft² is about 76% above the group average of 1.5 kgCO₂e/ft².

At 41,293 sq ft, it is about 72% below the average floor area of 145,612 sq ft for those buildings. It was built in 1940, 39 years earlier than the group's average year built (1979). Across all 24 jurisdictions BuildingCensus covers, the 1,266 medical office buildings average an ENERGY STAR score of 64 and a site EUI of 92.2 kBtu/ft².

How has BASTYR UNIVERSITY MEDICAL OFFICE BUILDING's energy performance changed over time?

BuildingCensus holds 10 Seattle disclosures for BASTYR UNIVERSITY MEDICAL OFFICE BUILDING, covering report years 2015–2024. Its ENERGY STAR score went from 65 in 2022 to 42 in 2024 (-23 points); its best year on file was 2022, at 65. Site EUI moved from 68.1 kBtu/ft² (2015) to 92.3 kBtu/ft² (2024), an 36% increase. Reported emissions went from 56 tCO₂e to 97 tCO₂e over the same span (up 73%).

What does an ENERGY STAR score of 42 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 42 means the building performs better than about 42% of its national peers. BuildingCensus bands the score into report-card grades; 42 falls in band D — lowest band (1–54). It sits 33 points below 75, the threshold for ENERGY STAR certification. In Seattle, 69% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. BASTYR UNIVERSITY MEDICAL OFFICE BUILDING's 92.3 kBtu/ft² across 41,293 sq ft works out to about 3.8 billion Btu (1,117 MWh-equivalent) in 2024. Its source EUI of 180.7 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 514,787 kWh of electricity and 16,304 therms of natural gas for the year.

Which law requires BASTYR UNIVERSITY MEDICAL OFFICE BUILDING to report its energy use?

BASTYR UNIVERSITY MEDICAL OFFICE BUILDING reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record seattle:24624:2024). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More medical office buildings in Seattle

Frequently asked questions

What is BASTYR UNIVERSITY MEDICAL OFFICE BUILDING's energy grade?

BASTYR UNIVERSITY MEDICAL OFFICE BUILDING scores 42 out of 100 on ENERGY STAR — band D, lowest band (1–54) — in its 2024 Seattle disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does BASTYR UNIVERSITY MEDICAL OFFICE BUILDING use?

Its 2024 site energy-use intensity was 92.3 kBtu/ft² (180.7 kBtu/ft² source) across 41,293 sq ft, including 514,787 kWh of electricity and 16,304 therms of natural gas.

What are BASTYR UNIVERSITY MEDICAL OFFICE BUILDING's carbon emissions?

BASTYR UNIVERSITY MEDICAL OFFICE BUILDING reported 97 tCO₂e of greenhouse-gas emissions (2.6 kgCO₂e/ft²) for 2024.

Where is BASTYR UNIVERSITY MEDICAL OFFICE BUILDING?

BASTYR UNIVERSITY MEDICAL OFFICE BUILDING is at 3670 STONE WAY N, in Seattle, Washington 98103. Its coordinates are 47.65231, -122.34217 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is BASTYR UNIVERSITY MEDICAL OFFICE BUILDING and when was it built?

BASTYR UNIVERSITY MEDICAL OFFICE BUILDING has 41,293 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1940 as its year built. It is classed as medical office.

Is BASTYR UNIVERSITY MEDICAL OFFICE BUILDING covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2024 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “BASTYR UNIVERSITY MEDICAL OFFICE BUILDING, Seattle, Washington — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/bastyr-university-medical-office-building-56838a00 (data as of October 2, 2026).