BuildingCensus
–

Centurylink Field-Stadium

Stadium (Open) in Seattle, WA · 800 OCCIDENTAL AVE S · 98134

At a glance

Centurylink Field-Stadium is a 1,913,640-square-foot stadium (open) building at 800 OCCIDENTAL AVE S in Seattle, Washington, built in 1999. In its 2025 Seattle benchmarking disclosure it reported a site energy-use intensity of 40.1 kBtu/ft² and 974 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2025
Site EUI
40.1
kBtu/ft²
GHG emissions
974
tCO₂e
GHG intensity
0.6
kgCO₂e/ft²
Floor area
1,913,640
sq ft
Year built
1999
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI40.1 kBtu/ft²
Source EUI98.1 kBtu/ft²
GHG emissions974 tCO₂e
GHG intensity0.6 kgCO₂e/ft²
Electricity14,848,570 kWh
Natural gas130,101 therms
Gross floor area1,913,640 sq ft
Source recordseattle:245:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest—40.1 kBtu/ft²974 tCO₂e
2024—38.9 kBtu/ft²938 tCO₂e
2023—42.0 kBtu/ft²985 tCO₂e
2022—44.7 kBtu/ft²1,228 tCO₂e
2021—37.5 kBtu/ft²872 tCO₂e
2020—30.8 kBtu/ft²646 tCO₂e
2019—39.7 kBtu/ft²855 tCO₂e
2018—37.0 kBtu/ft²860 tCO₂e
2017—43.4 kBtu/ft²1,081 tCO₂e
2016—37.7 kBtu/ft²834 tCO₂e
2015—37.8 kBtu/ft²773 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
800 OCCIDENTAL AVE S
State
Washington
ZIP
98134
Coordinates
47.59544, -122.33159

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does Centurylink Field-Stadium compare with other buildings in Seattle?

The latest disclosures cover 3,871 benchmarked buildings in Seattle. Its site EUI of 40.1 kBtu/ft² is about 16% below the average of 47.6 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.6 kgCO₂e/ft² is about 39% below the group average of 1.0 kgCO₂e/ft².

At 1,913,640 sq ft, it is about 1602% above the average floor area of 112,467 sq ft for those buildings. It was built in 1999, 24 years later than the group's average year built (1975).

How has Centurylink Field-Stadium's energy performance changed over time?

BuildingCensus holds 11 Seattle disclosures for Centurylink Field-Stadium, covering report years 2015–2025. Site EUI moved from 37.8 kBtu/ft² (2015) to 40.1 kBtu/ft² (2025), an 6% increase. Reported emissions went from 773 tCO₂e to 974 tCO₂e over the same span (up 26%).

What does a site EUI of 40.1 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Centurylink Field-Stadium's 40.1 kBtu/ft² across 1,913,640 sq ft works out to about 76.7 billion Btu (22,489 MWh-equivalent) in 2025. Its source EUI of 98.1 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 14,848,570 kWh of electricity and 130,101 therms of natural gas for the year.

Which law requires Centurylink Field-Stadium to report its energy use?

Centurylink Field-Stadium reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:245:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More stadium (open) buildings in Seattle

Frequently asked questions

What is Centurylink Field-Stadium's energy grade?

Centurylink Field-Stadium did not report an ENERGY STAR score in its 2025 disclosure, but its site energy-use intensity was 40.1 kBtu/ft².

How much energy does Centurylink Field-Stadium use?

Its 2025 site energy-use intensity was 40.1 kBtu/ft² (98.1 kBtu/ft² source) across 1,913,640 sq ft, including 14,848,570 kWh of electricity and 130,101 therms of natural gas.

What are Centurylink Field-Stadium's carbon emissions?

Centurylink Field-Stadium reported 974 tCO₂e of greenhouse-gas emissions (0.6 kgCO₂e/ft²) for 2025.

Where is Centurylink Field-Stadium?

Centurylink Field-Stadium is at 800 OCCIDENTAL AVE S, in Seattle, Washington 98134. Its coordinates are 47.59544, -122.33159 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Centurylink Field-Stadium and when was it built?

Centurylink Field-Stadium has 1,913,640 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 1999 as its year built. It is classed as stadium (open).

Is Centurylink Field-Stadium covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Centurylink Field-Stadium, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/centurylink-field-stadium-40b7f291 (data as of October 2, 2026).