Uw - Husky Stadium is a 417,358-square-foot stadium (open) building at 3800 MONTLAKE BLVD NE in Seattle, Washington, built in 2013. In its 2025 Seattle benchmarking disclosure it reported a site energy-use intensity of 136.5 kBtu/ft² and 429 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2025
Site EUI
136.5
kBtu/ft²
GHG emissions
429
tCO₂e
GHG intensity
1.4
kgCO₂e/ft²
Floor area
417,358
sq ft
Year built
2013
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 4 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI136.5 kBtu/ft²
Source EUI359.7 kBtu/ft²
GHG emissions429 tCO₂e
GHG intensity1.4 kgCO₂e/ft²
Electricity11,380,710 kWh
Natural gas40,285 therms
Gross floor area417,358 sq ft
Source recordseattle:49824:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest—136.5 kBtu/ft²429 tCO₂e
2024—130.3 kBtu/ft²456 tCO₂e
2023—114.1 kBtu/ft²405 tCO₂e
2022—108.0 kBtu/ft²402 tCO₂e
2021—104.5 kBtu/ft²333 tCO₂e
2020—99.5 kBtu/ft²245 tCO₂e
2019—101.9 kBtu/ft²318 tCO₂e
2018—108.1 kBtu/ft²350 tCO₂e
2017—19.7 kBtu/ft²16 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
3800 MONTLAKE BLVD NE
State
Washington
ZIP
98195
Coordinates
47.65064, -122.30298

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does Uw - Husky Stadium compare with other buildings in Seattle?

The latest disclosures cover 3,871 benchmarked buildings in Seattle. Its site EUI of 136.5 kBtu/ft² is about 187% above the average of 47.6 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 1.4 kgCO₂e/ft² is about 37% above the group average of 1.0 kgCO₂e/ft².

At 417,358 sq ft, it is about 271% above the average floor area of 112,467 sq ft for those buildings. It was built in 2013, 38 years later than the group's average year built (1975).

How has Uw - Husky Stadium's energy performance changed over time?

BuildingCensus holds 9 Seattle disclosures for Uw - Husky Stadium, covering report years 2017–2025. Site EUI moved from 19.7 kBtu/ft² (2017) to 136.5 kBtu/ft² (2025), an 593% increase. Reported emissions went from 16 tCO₂e to 429 tCO₂e over the same span (up 2634%).

What does a site EUI of 136.5 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Uw - Husky Stadium's 136.5 kBtu/ft² across 417,358 sq ft works out to about 57 billion Btu (16,696 MWh-equivalent) in 2025. Its source EUI of 359.7 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 11,380,710 kWh of electricity and 40,285 therms of natural gas for the year.

Which law requires Uw - Husky Stadium to report its energy use?

Uw - Husky Stadium reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:49824:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More stadium (open) buildings in Seattle

Frequently asked questions

What is Uw - Husky Stadium's energy grade?

Uw - Husky Stadium did not report an ENERGY STAR score in its 2025 disclosure, but its site energy-use intensity was 136.5 kBtu/ft².

How much energy does Uw - Husky Stadium use?

Its 2025 site energy-use intensity was 136.5 kBtu/ft² (359.7 kBtu/ft² source) across 417,358 sq ft, including 11,380,710 kWh of electricity and 40,285 therms of natural gas.

What are Uw - Husky Stadium's carbon emissions?

Uw - Husky Stadium reported 429 tCO₂e of greenhouse-gas emissions (1.4 kgCO₂e/ft²) for 2025.

Where is Uw - Husky Stadium?

Uw - Husky Stadium is at 3800 MONTLAKE BLVD NE, in Seattle, Washington 98195. Its coordinates are 47.65064, -122.30298 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Uw - Husky Stadium and when was it built?

Uw - Husky Stadium has 417,358 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 2013 as its year built. It is classed as stadium (open).

Is Uw - Husky Stadium covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Uw - Husky Stadium, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/uw-husky-stadium-84b51889 (data as of October 2, 2026).