First Lutheran Church Of Ballard
Worship Facility in Seattle, WA · 2006 NW 65TH ST · 98117
At a glance
First Lutheran Church Of Ballard is a 24,120-square-foot worship facility at 2006 NW 65TH ST in Seattle, Washington, built in 1928. In its 2025 Seattle benchmarking disclosure it reported an ENERGY STAR score of 62 out of 100 (grade C), a site energy-use intensity of 26.6 kBtu/ft² and 19 tCO₂e of greenhouse-gas emissions. That score is higher than 62% of the 52 scored worship facility buildings in Seattle.
Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 62 (band C) |
| Site EUI | 26.6 kBtu/ft² |
| Source EUI | 48.8 kBtu/ft² |
| GHG emissions | 19 tCO₂e |
| GHG intensity | 0.8 kgCO₂e/ft² |
| Electricity | 84,175 kWh |
| Natural gas | 3,550 therms |
| Gross floor area | 24,120 sq ft |
| Source record | seattle:24909:2025 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2025latest | 62 | +4 | 26.6 kBtu/ft² | 19 tCO₂e |
| 2024 | 58 | +3 | 27.6 kBtu/ft² | 21 tCO₂e |
| 2023 | 55 | -7 | 28.9 kBtu/ft² | 21 tCO₂e |
| 2022 | 62 | +9 | 27.7 kBtu/ft² | 22 tCO₂e |
| 2021 | 53 | ±0 | 38.6 kBtu/ft² | 38 tCO₂e |
| 2020 | 53 | +8 | 36.2 kBtu/ft² | 34 tCO₂e |
| 2019 | 45 | -9 | 38.4 kBtu/ft² | 33 tCO₂e |
| 2018 | 54 | +11 | 35.3 kBtu/ft² | 32 tCO₂e |
| 2017 | 43 | -23 | 41.4 kBtu/ft² | 37 tCO₂e |
| 2016 | 66 | -14 | 37.0 kBtu/ft² | 31 tCO₂e |
| 2015 | 80 | 31.1 kBtu/ft² | 27 tCO₂e |
Compliance context
Seattle Energy Benchmarking Ordinance (SMC 22.920)
Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 2006 NW 65TH ST
- City
- Seattle
- State
- Washington
- ZIP
- 98117
- Coordinates
- 47.67628, -122.38238
Within ~1 km
Nearby benchmarked buildings
- Urbana Apartmentsscore 100
Multifamily Housing · 473,387 sq ft
- Ballard On The Park Apartmentsscore 100
Multifamily Housing · 447,755 sq ft
- Amli Mark 24 Aptsscore 100
Multifamily Housing · 418,285 sq ft
- Leva On Market Aptsscore 100
Multifamily Housing · 361,727 sq ft
- Ava Ballard Apartmentsscore 100
Multifamily Housing · 317,814 sq ft
Office · 279,102 sq ft
See also: most efficient in Seattle · biggest emitters
How does First Lutheran Church Of Ballard compare with other worship facility buildings in Seattle?
The latest disclosures cover 67 worship facility buildings in Seattle, out of 3,871 buildings citywide. First Lutheran Church Of Ballard's ENERGY STAR score of 62 compares with an average of 50 across the 52 that report a score; it scores higher than 62% of them and lower than 31%. Its site EUI of 26.6 kBtu/ft² is about 30% below the average of 38.1 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.8 kgCO₂e/ft² is about 43% below the group average of 1.4 kgCO₂e/ft².
At 24,120 sq ft, it is about 26% below the average floor area of 32,782 sq ft for those buildings. It was built in 1928, 20 years earlier than the group's average year built (1948). Across all 24 jurisdictions BuildingCensus covers, the 1,035 worship facility buildings average an ENERGY STAR score of 50 and a site EUI of 47.8 kBtu/ft².
How has First Lutheran Church Of Ballard's energy performance changed over time?
BuildingCensus holds 11 Seattle disclosures for First Lutheran Church Of Ballard, covering report years 2015–2025. Its ENERGY STAR score went from 80 in 2015 to 62 in 2025 (-18 points); its best year on file was 2015, at 80. Site EUI moved from 31.1 kBtu/ft² (2015) to 26.6 kBtu/ft² (2025), a 14% decrease. Reported emissions went from 27 tCO₂e to 19 tCO₂e over the same span (down 29%).
What does an ENERGY STAR score of 62 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 62 means the building performs better than about 62% of its national peers. BuildingCensus bands the score into report-card grades; 62 falls in band C — below median (55–69). It sits 13 points below 75, the threshold for ENERGY STAR certification. In Seattle, 69% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. First Lutheran Church Of Ballard's 26.6 kBtu/ft² across 24,120 sq ft works out to about 0.6 billion Btu (188 MWh-equivalent) in 2025. Its source EUI of 48.8 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 84,175 kWh of electricity and 3,550 therms of natural gas for the year.
Which law requires First Lutheran Church Of Ballard to report its energy use?
First Lutheran Church Of Ballard reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:24909:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.
More worship facility buildings in Seattle
- Green Lake United Methodist· 23,931 sq ft · score 55 (C)
- Westwood Christian Community· 23,706 sq ft · score 1 (D)
- Trinity West Seattle· 23,562 sq ft · score 32 (D)
- First Church Seattle· 23,241 sq ft · score 29 (D)
- Japanese Presbyterian Church· 22,952 sq ft · score 93 (A)
- Grace Apostolic Church· 22,895 sq ft · EUI 2.3 kBtu/ft²
- Worship Facility buildings in Seattle· 67 benchmarked
- All Seattle benchmarked buildings· Seattle Energy Benchmarking Ordinance (SMC 22.920)
- Most efficient large buildings in Seattle
- Least efficient large buildings in Seattle
- Biggest emitters in Seattle
Frequently asked questions
What is First Lutheran Church Of Ballard's energy grade?
First Lutheran Church Of Ballard scores 62 out of 100 on ENERGY STAR — band C, below median (55–69) — in its 2025 Seattle disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does First Lutheran Church Of Ballard use?
Its 2025 site energy-use intensity was 26.6 kBtu/ft² (48.8 kBtu/ft² source) across 24,120 sq ft, including 84,175 kWh of electricity and 3,550 therms of natural gas.
What are First Lutheran Church Of Ballard's carbon emissions?
First Lutheran Church Of Ballard reported 19 tCO₂e of greenhouse-gas emissions (0.8 kgCO₂e/ft²) for 2025.
Where is First Lutheran Church Of Ballard?
First Lutheran Church Of Ballard is at 2006 NW 65TH ST, in Seattle, Washington 98117. Its coordinates are 47.67628, -122.38238 (latitude, longitude), as published in the Building Energy Benchmarking file.
How big is First Lutheran Church Of Ballard and when was it built?
First Lutheran Church Of Ballard has 24,120 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 1928 as its year built. It is classed as worship facility.
Is First Lutheran Church Of Ballard covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?
Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).
Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “First Lutheran Church Of Ballard, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/first-lutheran-church-of-ballard-08794955 (data as of October 2, 2026).