BuildingCensus
A

Seattle Children's Hospital Building Hope

Hospital (General Medical & Surgical) in Seattle, WA · 4500 40TH AVE NE · 98105

At a glance

Seattle Children's Hospital Building Hope is a 330,000-square-foot hospital (general medical & surgical) at 4500 40TH AVE NE in Seattle, Washington, built in 2013. In its 2025 Seattle benchmarking disclosure it reported an ENERGY STAR score of 98 out of 100 (grade A), a site energy-use intensity of 134.9 kBtu/ft² and 903 tCO₂e of greenhouse-gas emissions. That score is higher than 80% of the 10 scored hospital (general medical & surgical) buildings in Seattle.

ENERGY STAR score
98
band A · 2025
Site EUI
134.9
kBtu/ft²
GHG emissions
903
tCO₂e
GHG intensity
2.8
kgCO₂e/ft²
Floor area
330,000
sq ft
Year built
2013
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score98 (band A)
Site EUI134.9 kBtu/ft²
Source EUI303.4 kBtu/ft²
GHG emissions903 tCO₂e
GHG intensity2.8 kgCO₂e/ft²
Electricity8,747,192 kWh
Natural gas137,260 therms
Gross floor area330,000 sq ft
Source recordseattle:49732:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest98+10134.9 kBtu/ft²903 tCO₂e
202488-2187.2 kBtu/ft²1,748 tCO₂e
202390±0182.5 kBtu/ft²1,692 tCO₂e
202290-1182.8 kBtu/ft²1,710 tCO₂e
202191-2184.3 kBtu/ft²1,761 tCO₂e
202093+7180.0 kBtu/ft²1,734 tCO₂e
201986+8194.0 kBtu/ft²1,840 tCO₂e
201878+10199.2 kBtu/ft²1,889 tCO₂e
201768+10206.8 kBtu/ft²2,042 tCO₂e
201658-25239.2 kBtu/ft²1,754 tCO₂e
201583201.8 kBtu/ft²1,426 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
4500 40TH AVE NE
State
Washington
ZIP
98105
Coordinates
47.66201, -122.28386

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does Seattle Children's Hospital Building Hope compare with other hospital (general medical & surgical) buildings in Seattle?

The latest disclosures cover 11 hospital (general medical & surgical) buildings in Seattle, out of 3,871 buildings citywide. Seattle Children's Hospital Building Hope's ENERGY STAR score of 98 compares with an average of 76 across the 10 that report a score; it scores higher than 80% of them and lower than 10%. Its site EUI of 134.9 kBtu/ft² is about 26% below the average of 182.2 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 2.8 kgCO₂e/ft² is about 56% below the group average of 6.4 kgCO₂e/ft².

At 330,000 sq ft, it is about half of the average floor area of 676,225 sq ft for those buildings. It was built in 2013, 39 years later than the group's average year built (1974). Across all 24 jurisdictions BuildingCensus covers, the 748 hospital (general medical & surgical) buildings average an ENERGY STAR score of 59 and a site EUI of 238.7 kBtu/ft².

How has Seattle Children's Hospital Building Hope's energy performance changed over time?

BuildingCensus holds 11 Seattle disclosures for Seattle Children's Hospital Building Hope, covering report years 2015–2025. Its ENERGY STAR score went from 83 in 2015 to 98 in 2025 (+15 points). Site EUI moved from 201.8 kBtu/ft² (2015) to 134.9 kBtu/ft² (2025), a 33% decrease. Reported emissions went from 1,426 tCO₂e to 903 tCO₂e over the same span (down 37%).

What does an ENERGY STAR score of 98 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 98 means the building performs better than about 98% of its national peers. BuildingCensus bands the score into report-card grades; 98 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In Seattle, 69% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Seattle Children's Hospital Building Hope's 134.9 kBtu/ft² across 330,000 sq ft works out to about 44.5 billion Btu (13,047 MWh-equivalent) in 2025. Its source EUI of 303.4 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 8,747,192 kWh of electricity and 137,260 therms of natural gas for the year.

Which law requires Seattle Children's Hospital Building Hope to report its energy use?

Seattle Children's Hospital Building Hope reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:49732:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More hospital (general medical & surgical) buildings in Seattle

Frequently asked questions

What is Seattle Children's Hospital Building Hope's energy grade?

Seattle Children's Hospital Building Hope scores 98 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2025 Seattle disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Seattle Children's Hospital Building Hope use?

Its 2025 site energy-use intensity was 134.9 kBtu/ft² (303.4 kBtu/ft² source) across 330,000 sq ft, including 8,747,192 kWh of electricity and 137,260 therms of natural gas.

What are Seattle Children's Hospital Building Hope's carbon emissions?

Seattle Children's Hospital Building Hope reported 903 tCO₂e of greenhouse-gas emissions (2.8 kgCO₂e/ft²) for 2025.

Where is Seattle Children's Hospital Building Hope?

Seattle Children's Hospital Building Hope is at 4500 40TH AVE NE, in Seattle, Washington 98105. Its coordinates are 47.66201, -122.28386 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Seattle Children's Hospital Building Hope and when was it built?

Seattle Children's Hospital Building Hope has 330,000 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 2013 as its year built. It is classed as hospital (general medical & surgical).

Is Seattle Children's Hospital Building Hope covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Seattle Children's Hospital Building Hope, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/seattle-children-s-hospital-building-hope-577cd808 (data as of October 2, 2026).