BuildingCensus
D

Virginia Mason - Jones Pavilion

Hospital (General Medical & Surgical) in Seattle, WA · 1010 SPRING ST · 98104

At a glance

Virginia Mason - Jones Pavilion is a 267,470-square-foot hospital (general medical & surgical) at 1010 SPRING ST in Seattle, Washington, built in 2012. In its 2025 Seattle benchmarking disclosure it reported an ENERGY STAR score of 52 out of 100 (grade D), a site energy-use intensity of 161.8 kBtu/ft² and 1,721 tCO₂e of greenhouse-gas emissions. That score is higher than 10% of the 10 scored hospital (general medical & surgical) buildings in Seattle.

ENERGY STAR score
52
band D · 2025
Site EUI
161.8
kBtu/ft²
GHG emissions
1,721
tCO₂e
GHG intensity
5.4
kgCO₂e/ft²
Floor area
267,470
sq ft
Year built
2012
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score52 (band D)
Site EUI161.8 kBtu/ft²
Source EUI358.2 kBtu/ft²
GHG emissions1,721 tCO₂e
GHG intensity5.4 kgCO₂e/ft²
Electricity9,598,227 kWh
Gross floor area267,470 sq ft
Source recordseattle:49725:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest52+17161.8 kBtu/ft²1,721 tCO₂e
202435-35188.0 kBtu/ft²2,376 tCO₂e
202370-22167.4 kBtu/ft²2,503 tCO₂e
202292+58158.9 kBtu/ft²2,973 tCO₂e
202134+7196.4 kBtu/ft²2,710 tCO₂e
202027-39207.2 kBtu/ft²2,500 tCO₂e
201966+3155.3 kBtu/ft²1,523 tCO₂e
201863+15147.2 kBtu/ft²1,410 tCO₂e
201748+1158.2 kBtu/ft²1,650 tCO₂e
201647157.6 kBtu/ft²1,641 tCO₂e
2015—159.1 kBtu/ft²1,581 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1010 SPRING ST
State
Washington
ZIP
98104
Coordinates
47.60989, -122.32659

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does Virginia Mason - Jones Pavilion compare with other hospital (general medical & surgical) buildings in Seattle?

The latest disclosures cover 11 hospital (general medical & surgical) buildings in Seattle, out of 3,871 buildings citywide. Virginia Mason - Jones Pavilion's ENERGY STAR score of 52 compares with an average of 76 across the 10 that report a score; it scores higher than 10% of them and lower than 80%. Its site EUI of 161.8 kBtu/ft² is about 11% below the average of 182.2 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 5.4 kgCO₂e/ft² is about 16% below the group average of 6.4 kgCO₂e/ft².

At 267,470 sq ft, it is about 60% below the average floor area of 676,225 sq ft for those buildings. It was built in 2012, 38 years later than the group's average year built (1974). Across all 24 jurisdictions BuildingCensus covers, the 748 hospital (general medical & surgical) buildings average an ENERGY STAR score of 59 and a site EUI of 238.7 kBtu/ft².

How has Virginia Mason - Jones Pavilion's energy performance changed over time?

BuildingCensus holds 11 Seattle disclosures for Virginia Mason - Jones Pavilion, covering report years 2015–2025. Its ENERGY STAR score went from 47 in 2016 to 52 in 2025 (+5 points); its best year on file was 2022, at 92. Site EUI moved from 159.1 kBtu/ft² (2015) to 161.8 kBtu/ft² (2025), an 2% increase. Reported emissions went from 1,581 tCO₂e to 1,721 tCO₂e over the same span (up 9%).

What does an ENERGY STAR score of 52 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 52 means the building performs better than about 52% of its national peers. BuildingCensus bands the score into report-card grades; 52 falls in band D — lowest band (1–54). It sits 23 points below 75, the threshold for ENERGY STAR certification. In Seattle, 69% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Virginia Mason - Jones Pavilion's 161.8 kBtu/ft² across 267,470 sq ft works out to about 43.3 billion Btu (12,683 MWh-equivalent) in 2025. Its source EUI of 358.2 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 9,598,227 kWh of electricity for the year.

Which law requires Virginia Mason - Jones Pavilion to report its energy use?

Virginia Mason - Jones Pavilion reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:49725:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More hospital (general medical & surgical) buildings in Seattle

Frequently asked questions

What is Virginia Mason - Jones Pavilion's energy grade?

Virginia Mason - Jones Pavilion scores 52 out of 100 on ENERGY STAR — band D, lowest band (1–54) — in its 2025 Seattle disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Virginia Mason - Jones Pavilion use?

Its 2025 site energy-use intensity was 161.8 kBtu/ft² (358.2 kBtu/ft² source) across 267,470 sq ft, including 9,598,227 kWh of electricity.

What are Virginia Mason - Jones Pavilion's carbon emissions?

Virginia Mason - Jones Pavilion reported 1,721 tCO₂e of greenhouse-gas emissions (5.4 kgCO₂e/ft²) for 2025.

Where is Virginia Mason - Jones Pavilion?

Virginia Mason - Jones Pavilion is at 1010 SPRING ST, in Seattle, Washington 98104. Its coordinates are 47.60989, -122.32659 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Virginia Mason - Jones Pavilion and when was it built?

Virginia Mason - Jones Pavilion has 267,470 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 2012 as its year built. It is classed as hospital (general medical & surgical).

Is Virginia Mason - Jones Pavilion covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Virginia Mason - Jones Pavilion, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/virginia-mason-jones-pavilion-bc04978d (data as of October 2, 2026).