BuildingCensus
–

Swedish Medical Center First Hill - Campus

Parking in Seattle, WA · 747 BROADWAY · 98122

At a glance

Swedish Medical Center First Hill - Campus is a 2,080,885-square-foot parking building at 747 BROADWAY in Seattle, Washington, built in 1994. In its 2025 Seattle benchmarking disclosure it reported a site energy-use intensity of 161.6 kBtu/ft² and 9,147 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2025
Site EUI
161.6
kBtu/ft²
GHG emissions
9,147
tCO₂e
GHG intensity
6.4
kgCO₂e/ft²
Floor area
2,080,885
sq ft
Year built
1994
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI161.6 kBtu/ft²
Source EUI331.1 kBtu/ft²
GHG emissions9,147 tCO₂e
GHG intensity6.4 kgCO₂e/ft²
Electricity36,277,880 kWh
Natural gas103,797 therms
Gross floor area2,080,885 sq ft
Source recordseattle:828:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest—161.6 kBtu/ft²9,147 tCO₂e
2024———
2023———
202272-28179.9 kBtu/ft²10,310 tCO₂e
2021100+26116.2 kBtu/ft²10,410 tCO₂e
202074+3165.7 kBtu/ft²11,671 tCO₂e
201971+1168.7 kBtu/ft²11,813 tCO₂e
201870+8169.2 kBtu/ft²11,877 tCO₂e
201762+8171.1 kBtu/ft²12,222 tCO₂e
201654-5177.9 kBtu/ft²12,656 tCO₂e
201559174.9 kBtu/ft²12,146 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
747 BROADWAY
State
Washington
ZIP
98122
Coordinates
47.60884, -122.32193

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does Swedish Medical Center First Hill - Campus compare with other parking buildings in Seattle?

The latest disclosures cover 21 parking buildings in Seattle, out of 3,871 buildings citywide. Its site EUI of 161.6 kBtu/ft² is about 61% above the average of 100.3 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 6.4 kgCO₂e/ft² is about 156% above the group average of 2.5 kgCO₂e/ft².

At 2,080,885 sq ft, it is about 465% above the average floor area of 368,027 sq ft for those buildings. It was built in 1994, 6 years earlier than the group's average year built (2000). Across all 24 jurisdictions BuildingCensus covers, the 1,071 parking buildings average an ENERGY STAR score of 67 and a site EUI of 40.3 kBtu/ft².

How has Swedish Medical Center First Hill - Campus's energy performance changed over time?

BuildingCensus holds 11 Seattle disclosures for Swedish Medical Center First Hill - Campus, covering report years 2015–2025. Its ENERGY STAR score went from 59 in 2015 to 72 in 2022 (+13 points); its best year on file was 2021, at 100. Site EUI moved from 174.9 kBtu/ft² (2015) to 161.6 kBtu/ft² (2025), a 8% decrease. Reported emissions went from 12,146 tCO₂e to 9,147 tCO₂e over the same span (down 25%).

What does a site EUI of 161.6 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Swedish Medical Center First Hill - Campus's 161.6 kBtu/ft² across 2,080,885 sq ft works out to about 336.3 billion Btu (98,551 MWh-equivalent) in 2025. Its source EUI of 331.1 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 36,277,880 kWh of electricity and 103,797 therms of natural gas for the year.

Which law requires Swedish Medical Center First Hill - Campus to report its energy use?

Swedish Medical Center First Hill - Campus reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:828:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More parking buildings in Seattle

Frequently asked questions

What is Swedish Medical Center First Hill - Campus's energy grade?

Swedish Medical Center First Hill - Campus did not report an ENERGY STAR score in its 2025 disclosure, but its site energy-use intensity was 161.6 kBtu/ft².

How much energy does Swedish Medical Center First Hill - Campus use?

Its 2025 site energy-use intensity was 161.6 kBtu/ft² (331.1 kBtu/ft² source) across 2,080,885 sq ft, including 36,277,880 kWh of electricity and 103,797 therms of natural gas.

What are Swedish Medical Center First Hill - Campus's carbon emissions?

Swedish Medical Center First Hill - Campus reported 9,147 tCO₂e of greenhouse-gas emissions (6.4 kgCO₂e/ft²) for 2025.

Where is Swedish Medical Center First Hill - Campus?

Swedish Medical Center First Hill - Campus is at 747 BROADWAY, in Seattle, Washington 98122. Its coordinates are 47.60884, -122.32193 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Swedish Medical Center First Hill - Campus and when was it built?

Swedish Medical Center First Hill - Campus has 2,080,885 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 1994 as its year built. It is classed as parking.

Is Swedish Medical Center First Hill - Campus covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Swedish Medical Center First Hill - Campus, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/swedish-medical-center-first-hill-campus-ebf5d885 (data as of October 2, 2026).