BuildingCensus
A

Harborview Medical Center - Campus

Hospital (General Medical & Surgical) in Seattle, WA · 325 9TH AVE · 98104

At a glance

Harborview Medical Center - Campus is a 1,926,841-square-foot hospital (general medical & surgical) at 325 9TH AVE in Seattle, Washington, built in 2000. In its 2025 Seattle benchmarking disclosure it reported an ENERGY STAR score of 97 out of 100 (grade A), a site energy-use intensity of 153.8 kBtu/ft² and 9,934 tCO₂e of greenhouse-gas emissions. That score is higher than 70% of the 10 scored hospital (general medical & surgical) buildings in Seattle.

ENERGY STAR score
97
band A · 2025
Site EUI
153.8
kBtu/ft²
GHG emissions
9,934
tCO₂e
GHG intensity
7.3
kgCO₂e/ft²
Floor area
1,926,841
sq ft
Year built
2000
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score97 (band A)
Site EUI153.8 kBtu/ft²
Source EUI293.0 kBtu/ft²
GHG emissions9,934 tCO₂e
GHG intensity7.3 kgCO₂e/ft²
Electricity26,954,100 kWh
Natural gas14,829 therms
Gross floor area1,926,841 sq ft
Source recordseattle:276:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest97153.8 kBtu/ft²9,934 tCO₂e
2024———
2023——747 tCO₂e
202283-2182.4 kBtu/ft²11,392 tCO₂e
202185-2177.1 kBtu/ft²10,848 tCO₂e
202087-4170.8 kBtu/ft²10,216 tCO₂e
201991+1165.7 kBtu/ft²10,307 tCO₂e
201890+13171.2 kBtu/ft²10,268 tCO₂e
201777+48165.8 kBtu/ft²11,063 tCO₂e
201629-1217.1 kBtu/ft²11,004 tCO₂e
201530219.1 kBtu/ft²11,048 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
325 9TH AVE
State
Washington
ZIP
98104
Coordinates
47.60399, -122.32377

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does Harborview Medical Center - Campus compare with other hospital (general medical & surgical) buildings in Seattle?

The latest disclosures cover 11 hospital (general medical & surgical) buildings in Seattle, out of 3,871 buildings citywide. Harborview Medical Center - Campus's ENERGY STAR score of 97 compares with an average of 76 across the 10 that report a score; it scores higher than 70% of them and lower than 20%. Its site EUI of 153.8 kBtu/ft² is about 16% below the average of 182.2 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 7.3 kgCO₂e/ft² is about 15% above the group average of 6.4 kgCO₂e/ft².

At 1,926,841 sq ft, it is about 185% above the average floor area of 676,225 sq ft for those buildings. It was built in 2000, 26 years later than the group's average year built (1974). Across all 24 jurisdictions BuildingCensus covers, the 748 hospital (general medical & surgical) buildings average an ENERGY STAR score of 59 and a site EUI of 238.7 kBtu/ft².

How has Harborview Medical Center - Campus's energy performance changed over time?

BuildingCensus holds 11 Seattle disclosures for Harborview Medical Center - Campus, covering report years 2015–2025. Its ENERGY STAR score went from 30 in 2015 to 97 in 2025 (+67 points). Site EUI moved from 219.1 kBtu/ft² (2015) to 153.8 kBtu/ft² (2025), a 30% decrease. Reported emissions went from 11,048 tCO₂e to 9,934 tCO₂e over the same span (down 10%).

What does an ENERGY STAR score of 97 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 97 means the building performs better than about 97% of its national peers. BuildingCensus bands the score into report-card grades; 97 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In Seattle, 69% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Harborview Medical Center - Campus's 153.8 kBtu/ft² across 1,926,841 sq ft works out to about 296.3 billion Btu (86,851 MWh-equivalent) in 2025. Its source EUI of 293.0 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 26,954,100 kWh of electricity and 14,829 therms of natural gas for the year.

Which law requires Harborview Medical Center - Campus to report its energy use?

Harborview Medical Center - Campus reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:276:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More hospital (general medical & surgical) buildings in Seattle

Frequently asked questions

What is Harborview Medical Center - Campus's energy grade?

Harborview Medical Center - Campus scores 97 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2025 Seattle disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Harborview Medical Center - Campus use?

Its 2025 site energy-use intensity was 153.8 kBtu/ft² (293.0 kBtu/ft² source) across 1,926,841 sq ft, including 26,954,100 kWh of electricity and 14,829 therms of natural gas.

What are Harborview Medical Center - Campus's carbon emissions?

Harborview Medical Center - Campus reported 9,934 tCO₂e of greenhouse-gas emissions (7.3 kgCO₂e/ft²) for 2025.

Where is Harborview Medical Center - Campus?

Harborview Medical Center - Campus is at 325 9TH AVE, in Seattle, Washington 98104. Its coordinates are 47.60399, -122.32377 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Harborview Medical Center - Campus and when was it built?

Harborview Medical Center - Campus has 1,926,841 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 2000 as its year built. It is classed as hospital (general medical & surgical).

Is Harborview Medical Center - Campus covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Harborview Medical Center - Campus, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/harborview-medical-center-campus-5433f1b6 (data as of October 2, 2026).