BuildingCensus
B

Virginia Mason - Central Pavilion

Hospital (General Medical & Surgical) in Seattle, WA · 925 SENECA ST · 98101

At a glance

Virginia Mason - Central Pavilion is a 374,466-square-foot hospital (general medical & surgical) at 925 SENECA ST in Seattle, Washington, built in 1920. In its 2025 Seattle benchmarking disclosure it reported an ENERGY STAR score of 81 out of 100 (grade B), a site energy-use intensity of 215.6 kBtu/ft² and 3,766 tCO₂e of greenhouse-gas emissions. That score is higher than 40% of the 10 scored hospital (general medical & surgical) buildings in Seattle.

ENERGY STAR score
81
band B · 2025
Site EUI
215.6
kBtu/ft²
GHG emissions
3,766
tCO₂e
GHG intensity
11.4
kgCO₂e/ft²
Floor area
374,466
sq ft
Year built
1920
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score81 (band B)
Site EUI215.6 kBtu/ft²
Source EUI387.1 kBtu/ft²
GHG emissions3,766 tCO₂e
GHG intensity11.4 kgCO₂e/ft²
Electricity7,756,724 kWh
Gross floor area374,466 sq ft
Source recordseattle:49940:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest81+4215.6 kBtu/ft²3,766 tCO₂e
202477-4226.3 kBtu/ft²4,033 tCO₂e
202381-5213.7 kBtu/ft²3,649 tCO₂e
202286+11198.2 kBtu/ft²3,189 tCO₂e
202175-9225.4 kBtu/ft²3,926 tCO₂e
202084-2200.5 kBtu/ft²4,074 tCO₂e
201986-12196.0 kBtu/ft²3,983 tCO₂e
201898+2212.7 kBtu/ft²4,138 tCO₂e
201796-2210.8 kBtu/ft²4,076 tCO₂e
201698+1195.4 kBtu/ft²3,641 tCO₂e
201597210.0 kBtu/ft²4,039 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
925 SENECA ST
State
Washington
ZIP
98101
Coordinates
47.60986, -122.32774

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does Virginia Mason - Central Pavilion compare with other hospital (general medical & surgical) buildings in Seattle?

The latest disclosures cover 11 hospital (general medical & surgical) buildings in Seattle, out of 3,871 buildings citywide. Virginia Mason - Central Pavilion's ENERGY STAR score of 81 compares with an average of 76 across the 10 that report a score; it scores higher than 40% of them and lower than 40%. Its site EUI of 215.6 kBtu/ft² is about 18% above the average of 182.2 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 11.4 kgCO₂e/ft² is about 78% above the group average of 6.4 kgCO₂e/ft².

At 374,466 sq ft, it is about 45% below the average floor area of 676,225 sq ft for those buildings. It was built in 1920, 54 years earlier than the group's average year built (1974). Across all 24 jurisdictions BuildingCensus covers, the 748 hospital (general medical & surgical) buildings average an ENERGY STAR score of 59 and a site EUI of 238.7 kBtu/ft².

How has Virginia Mason - Central Pavilion's energy performance changed over time?

BuildingCensus holds 11 Seattle disclosures for Virginia Mason - Central Pavilion, covering report years 2015–2025. Its ENERGY STAR score went from 97 in 2015 to 81 in 2025 (-16 points); its best year on file was 2016, at 98. Site EUI moved from 210.0 kBtu/ft² (2015) to 215.6 kBtu/ft² (2025), an 3% increase. Reported emissions went from 4,039 tCO₂e to 3,766 tCO₂e over the same span (down 7%).

What does an ENERGY STAR score of 81 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 81 means the building performs better than about 81% of its national peers. BuildingCensus bands the score into report-card grades; 81 falls in band B — above median (70–84). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In Seattle, 69% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Virginia Mason - Central Pavilion's 215.6 kBtu/ft² across 374,466 sq ft works out to about 80.7 billion Btu (23,661 MWh-equivalent) in 2025. Its source EUI of 387.1 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 7,756,724 kWh of electricity for the year.

Which law requires Virginia Mason - Central Pavilion to report its energy use?

Virginia Mason - Central Pavilion reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:49940:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More hospital (general medical & surgical) buildings in Seattle

Frequently asked questions

What is Virginia Mason - Central Pavilion's energy grade?

Virginia Mason - Central Pavilion scores 81 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2025 Seattle disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Virginia Mason - Central Pavilion use?

Its 2025 site energy-use intensity was 215.6 kBtu/ft² (387.1 kBtu/ft² source) across 374,466 sq ft, including 7,756,724 kWh of electricity.

What are Virginia Mason - Central Pavilion's carbon emissions?

Virginia Mason - Central Pavilion reported 3,766 tCO₂e of greenhouse-gas emissions (11.4 kgCO₂e/ft²) for 2025.

Where is Virginia Mason - Central Pavilion?

Virginia Mason - Central Pavilion is at 925 SENECA ST, in Seattle, Washington 98101. Its coordinates are 47.60986, -122.32774 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Virginia Mason - Central Pavilion and when was it built?

Virginia Mason - Central Pavilion has 374,466 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 1920 as its year built. It is classed as hospital (general medical & surgical).

Is Virginia Mason - Central Pavilion covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Virginia Mason - Central Pavilion, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/virginia-mason-central-pavilion-96f4bb12 (data as of October 2, 2026).