BuildingCensus
–

Stadium Innovation Center

Mixed Use Property in Seattle, WA · 1531 UTAH AVE S · 98134

At a glance

Stadium Innovation Center is a 286,000-square-foot mixed use property building at 1531 UTAH AVE S in Seattle, Washington, built in 2009. In its 2025 Seattle benchmarking disclosure it reported a site energy-use intensity of 79.2 kBtu/ft² and 112 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2025
Site EUI
79.2
kBtu/ft²
GHG emissions
112
tCO₂e
GHG intensity
0.6
kgCO₂e/ft²
Floor area
286,000
sq ft
Year built
2009
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Seattle Energy Benchmarking Ordinance (SMC 22.920) · reporting year 2025

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI79.2 kBtu/ft²
Source EUI215.1 kBtu/ft²
GHG emissions112 tCO₂e
GHG intensity0.6 kgCO₂e/ft²
Electricity3,848,025 kWh
Natural gas6,739 therms
Gross floor area286,000 sq ft
Source recordseattle:637:2025

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2025latest—79.2 kBtu/ft²112 tCO₂e
2024—82.5 kBtu/ft²116 tCO₂e
2023—76.9 kBtu/ft²112 tCO₂e
2022—69.9 kBtu/ft²84 tCO₂e
202120102.4 kBtu/ft²103 tCO₂e
2020—179.1 kBtu/ft²181 tCO₂e
2019—301.9 kBtu/ft²305 tCO₂e
2018—338.0 kBtu/ft²342 tCO₂e
2017—384.1 kBtu/ft²388 tCO₂e
2016—366.4 kBtu/ft²371 tCO₂e
2015—374.4 kBtu/ft²380 tCO₂e

Compliance context

Seattle Energy Benchmarking Ordinance (SMC 22.920)

Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1531 UTAH AVE S
State
Washington
ZIP
98134
Coordinates
47.58924, -122.33566

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Seattle · biggest emitters

How does Stadium Innovation Center compare with other mixed use property buildings in Seattle?

The latest disclosures cover 157 mixed use property buildings in Seattle, out of 3,871 buildings citywide. Its site EUI of 79.2 kBtu/ft² is about 15% above the average of 68.7 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 0.6 kgCO₂e/ft² is about half of the group average of 1.4 kgCO₂e/ft².

At 286,000 sq ft, it is about 73% above the average floor area of 165,352 sq ft for those buildings. It was built in 2009, 41 years later than the group's average year built (1968). Across all 24 jurisdictions BuildingCensus covers, the 1,212 mixed use property buildings average an ENERGY STAR score of 69 and a site EUI of 79.8 kBtu/ft².

How has Stadium Innovation Center's energy performance changed over time?

BuildingCensus holds 11 Seattle disclosures for Stadium Innovation Center, covering report years 2015–2025. Site EUI moved from 374.4 kBtu/ft² (2015) to 79.2 kBtu/ft² (2025), a 79% decrease. Reported emissions went from 380 tCO₂e to 112 tCO₂e over the same span (down 71%).

What does a site EUI of 79.2 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Stadium Innovation Center's 79.2 kBtu/ft² across 286,000 sq ft works out to about 22.7 billion Btu (6,638 MWh-equivalent) in 2025. Its source EUI of 215.1 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 3,848,025 kWh of electricity and 6,739 therms of natural gas for the year.

Which law requires Stadium Innovation Center to report its energy use?

Stadium Innovation Center reports under the Seattle Energy Benchmarking Ordinance (SMC 22.920), the legal basis of Seattle's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2025 disclosure (source record seattle:637:2025). Seattle's Building Emissions Performance Standard (adopted 2023) applies to buildings over 20,000 sq ft: benchmarking verification is due 2027–2030 and initial emissions targets 2031–2035, reaching net zero by 2041–2050, with fines for non-compliance.

More mixed use property buildings in Seattle

Frequently asked questions

What is Stadium Innovation Center's energy grade?

Stadium Innovation Center did not report an ENERGY STAR score in its 2025 disclosure, but its site energy-use intensity was 79.2 kBtu/ft².

How much energy does Stadium Innovation Center use?

Its 2025 site energy-use intensity was 79.2 kBtu/ft² (215.1 kBtu/ft² source) across 286,000 sq ft, including 3,848,025 kWh of electricity and 6,739 therms of natural gas.

What are Stadium Innovation Center's carbon emissions?

Stadium Innovation Center reported 112 tCO₂e of greenhouse-gas emissions (0.6 kgCO₂e/ft²) for 2025.

Where is Stadium Innovation Center?

Stadium Innovation Center is at 1531 UTAH AVE S, in Seattle, Washington 98134. Its coordinates are 47.58924, -122.33566 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Stadium Innovation Center and when was it built?

Stadium Innovation Center has 286,000 sq ft of gross floor area, as reported in its 2025 disclosure. The disclosure lists 2009 as its year built. It is classed as mixed use property.

Is Stadium Innovation Center covered by the Seattle Energy Benchmarking Ordinance (SMC 22.920)?

Yes — it appears in the 2025 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Seattle Energy Benchmarking Ordinance (SMC 22.920).

Working with Seattle building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Seattle Energy Benchmarking Ordinance (SMC 22.920)), as published October 2, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Stadium Innovation Center, Seattle, Washington — 2025 benchmarking disclosure”, https://buildingcensus.com/buildings/seattle/stadium-innovation-center-31eedae3 (data as of October 2, 2026).