BuildingCensus
D

Bromine

Office in Washington, DC, DC · 1718 Connecticut Ave · 20009

At a glance

Bromine is a 31,150-square-foot office building at 1718 Connecticut Ave in Washington, DC, built in 1982. In its 2014 Washington, DC benchmarking disclosure it reported an ENERGY STAR score of 27 out of 100 (grade D), a site energy-use intensity of 83.4 kBtu/ft² and 348 tCO₂e of greenhouse-gas emissions. That score is higher than 5% of the 774 scored office buildings in Washington, DC.

ENERGY STAR score
27
band D · 2014
Site EUI
83.4
kBtu/ft²
GHG emissions
348
tCO₂e
GHG intensity
11.2
kgCO₂e/ft²
Floor area
31,150
sq ft
Year built
1982
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Clean and Affordable Energy Act / BEPS · reporting year 2014

Benchmarking record

FieldValue
ENERGY STAR score27 (band D)
Site EUI83.4 kBtu/ft²
Source EUI261.9 kBtu/ft²
GHG emissions348 tCO₂e
GHG intensity11.2 kgCO₂e/ft²
Electricity761,396 kWh
Natural gas0 therms
Water use1,008 kgal
Gross floor area31,150 sq ft
Source recorddc:PM4372707:2014

Compliance context

Clean and Affordable Energy Act / BEPS

DC's Building Energy Performance Standards (BEPS) require buildings below the performance standard to improve over compliance cycles (the first ends December 31, 2026; later cycles run five years), with penalties for buildings that fail to meet their pathway.

Program details →

Ownership

BROMINE LLC

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1718 Connecticut Ave
State
District of Columbia
ZIP
20009
Coordinates
38.91321, -77.04593

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Washington, DC · biggest emitters

How does Bromine compare with other office buildings in Washington, DC?

The latest disclosures cover 899 office buildings in Washington, DC, out of 6,870 buildings citywide. Bromine's ENERGY STAR score of 27 compares with an average of 70 across the 774 that report a score; it scores higher than 5% of them and lower than 94%. Its site EUI of 83.4 kBtu/ft² is about 50% above the average of 55.6 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 11.2 kgCO₂e/ft² is about 124% above the group average of 5.0 kgCO₂e/ft².

At 31,150 sq ft, it is about 86% below the average floor area of 216,135 sq ft for those buildings. It was built in 1982, 8 years later than the group's average year built (1974). Across all 24 jurisdictions BuildingCensus covers, the 15,264 office buildings average an ENERGY STAR score of 73 and a site EUI of 59.3 kBtu/ft².

What does an ENERGY STAR score of 27 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 27 means the building performs better than about 27% of its national peers. BuildingCensus bands the score into report-card grades; 27 falls in band D — lowest band (1–54). It sits 48 points below 75, the threshold for ENERGY STAR certification. In Washington, DC, 47% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Bromine's 83.4 kBtu/ft² across 31,150 sq ft works out to about 2.6 billion Btu (761 MWh-equivalent) in 2014. Its source EUI of 261.9 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 761,396 kWh of electricity, 0 therms of natural gas and 1,008 thousand gallons of water for the year.

Which law requires Bromine to report its energy use?

Bromine reports under the Clean and Affordable Energy Act / BEPS, the legal basis of Washington, DC's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2014 disclosure (source record dc:PM4372707:2014). DC's Building Energy Performance Standards (BEPS) require buildings below the performance standard to improve over compliance cycles (the first ends December 31, 2026; later cycles run five years), with penalties for buildings that fail to meet their pathway.

More office buildings in Washington, DC

Frequently asked questions

What is Bromine's energy grade?

Bromine scores 27 out of 100 on ENERGY STAR — band D, lowest band (1–54) — in its 2014 Washington, DC disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Bromine use?

Its 2014 site energy-use intensity was 83.4 kBtu/ft² (261.9 kBtu/ft² source) across 31,150 sq ft, including 761,396 kWh of electricity and 0 therms of natural gas.

What are Bromine's carbon emissions?

Bromine reported 348 tCO₂e of greenhouse-gas emissions (11.2 kgCO₂e/ft²) for 2014.

Where is Bromine?

Bromine is at 1718 Connecticut Ave, in Washington, DC 20009. Its coordinates are 38.91321, -77.04593 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Bromine and when was it built?

Bromine has 31,150 sq ft of gross floor area, as reported in its 2014 disclosure. The disclosure lists 1982 as its year built. It is classed as office.

Is Bromine covered by the Clean and Affordable Energy Act / BEPS?

Yes — it appears in the 2014 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Clean and Affordable Energy Act / BEPS.

Working with Washington, DC building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Clean and Affordable Energy Act / BEPS), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Bromine, Washington, DC — 2014 benchmarking disclosure”, https://buildingcensus.com/buildings/washington-dc/bromine-7644b528 (data as of July 9, 2026).