Christian Innovation Center
Worship Facility in Washington, DC, DC · 6200 2nd St NW · 20011
At a glance
Christian Innovation Center is a 65,153-square-foot worship facility at 6200 2nd St NW in Washington, DC, built in 1900. In its 2024 Washington, DC benchmarking disclosure it reported an ENERGY STAR score of 30 out of 100 (grade D), a site energy-use intensity of 58.5 kBtu/ft² and 230 tCO₂e of greenhouse-gas emissions. That score is higher than 31% of the 72 scored worship facility buildings in Washington, DC.
Clean and Affordable Energy Act / BEPS · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 30 (band D) |
| Site EUI | 58.5 kBtu/ft² |
| Source EUI | 89.9 kBtu/ft² |
| GHG emissions | 230 tCO₂e |
| GHG intensity | 3.5 kgCO₂e/ft² |
| Electricity | 310,842 kWh |
| Natural gas | 27,479 therms |
| Water use | 21 kgal |
| Gross floor area | 65,153 sq ft |
| Source record | dc:PM55295092:2024 |
Compliance context
Clean and Affordable Energy Act / BEPS
DC's Building Energy Performance Standards (BEPS) require buildings below the performance standard to improve over compliance cycles (the first ends December 31, 2026; later cycles run five years), with penalties for buildings that fail to meet their pathway.
Ownership
CHRISTIAN INNOVATION CENTER LLC
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 6200 2nd St NW
- City
- Washington, DC
- State
- District of Columbia
- ZIP
- 20011
- Coordinates
- 38.96550, -77.01397
Within ~1 km
Nearby benchmarked buildings
- MWHC and MNRH Campusscore 67
Hospital (General Medical & Surgical) · 2,157,159 sq ft
K-12 School · 483,237 sq ft
K-12 School · 271,300 sq ft
K-12 School · 172,421 sq ft
- MFS Chillum LLCscore 13
Non-Refrigerated Warehouse · 149,216 sq ft
- Secure Self Storagescore —
Self-Storage Facility · 96,991 sq ft
See also: most efficient in Washington, DC · biggest emitters
How does Christian Innovation Center compare with other worship facility buildings in Washington, DC?
The latest disclosures cover 88 worship facility buildings in Washington, DC, out of 6,870 buildings citywide. Christian Innovation Center's ENERGY STAR score of 30 compares with an average of 43 across the 72 that report a score; it scores higher than 31% of them and lower than 67%. Its site EUI of 58.5 kBtu/ft² is about 13% above the average of 51.9 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 3.5 kgCO₂e/ft² is roughly in line with the group average of 3.6 kgCO₂e/ft².
At 65,153 sq ft, it is about 32% above the average floor area of 49,290 sq ft for those buildings. It was built in 1900, 34 years earlier than the group's average year built (1934). Across all 24 jurisdictions BuildingCensus covers, the 1,035 worship facility buildings average an ENERGY STAR score of 50 and a site EUI of 47.8 kBtu/ft².
What does an ENERGY STAR score of 30 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 30 means the building performs better than about 30% of its national peers. BuildingCensus bands the score into report-card grades; 30 falls in band D — lowest band (1–54). It sits 45 points below 75, the threshold for ENERGY STAR certification. In Washington, DC, 47% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Christian Innovation Center's 58.5 kBtu/ft² across 65,153 sq ft works out to about 3.8 billion Btu (1,117 MWh-equivalent) in 2024. Its source EUI of 89.9 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 310,842 kWh of electricity, 27,479 therms of natural gas and 21 thousand gallons of water for the year.
Which law requires Christian Innovation Center to report its energy use?
Christian Innovation Center reports under the Clean and Affordable Energy Act / BEPS, the legal basis of Washington, DC's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record dc:PM55295092:2024). DC's Building Energy Performance Standards (BEPS) require buildings below the performance standard to improve over compliance cycles (the first ends December 31, 2026; later cycles run five years), with penalties for buildings that fail to meet their pathway.
More worship facility buildings in Washington, DC
- National City Christian Church Foundation· 60,706 sq ft · EUI 85.8 kBtu/ft²
- Foundry United Methodist Church· 60,000 sq ft · score 67 (C)
- 19TH St Baptist Church· 60,000 sq ft · score 43 (D)
- Nineteenth Street Baptist Church· 60,000 sq ft · score 36 (D)
- Foundry United Methodist Church· 58,701 sq ft · score 29 (D)
- 3401 Nebraska Avenue NW· 55,464 sq ft · EUI 74.5 kBtu/ft²
- Worship Facility buildings in Washington, DC· 88 benchmarked
- All Washington, DC benchmarked buildings· Clean and Affordable Energy Act / BEPS
- Most efficient large buildings in Washington, DC
- Least efficient large buildings in Washington, DC
- Biggest emitters in Washington, DC
Frequently asked questions
What is Christian Innovation Center's energy grade?
Christian Innovation Center scores 30 out of 100 on ENERGY STAR — band D, lowest band (1–54) — in its 2024 Washington, DC disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Christian Innovation Center use?
Its 2024 site energy-use intensity was 58.5 kBtu/ft² (89.9 kBtu/ft² source) across 65,153 sq ft, including 310,842 kWh of electricity and 27,479 therms of natural gas.
What are Christian Innovation Center's carbon emissions?
Christian Innovation Center reported 230 tCO₂e of greenhouse-gas emissions (3.5 kgCO₂e/ft²) for 2024.
Where is Christian Innovation Center?
Christian Innovation Center is at 6200 2nd St NW, in Washington, DC 20011. Its coordinates are 38.96550, -77.01397 (latitude, longitude), as published in the Building Energy Benchmarking file.
How big is Christian Innovation Center and when was it built?
Christian Innovation Center has 65,153 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1900 as its year built. It is classed as worship facility.
Is Christian Innovation Center covered by the Clean and Affordable Energy Act / BEPS?
Yes — it appears in the 2024 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Clean and Affordable Energy Act / BEPS.
Working with Washington, DC building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking (Clean and Affordable Energy Act / BEPS), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Christian Innovation Center, Washington, DC — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/washington-dc/christian-innovation-center-f196869f (data as of July 9, 2026).