BuildingCensus
D

Church of the Nativity

Worship Facility in Washington, DC, DC · 6001 - 13th Street, NW · 20011

At a glance

Church of the Nativity is a 27,358-square-foot worship facility at 6001 - 13th Street, NW in Washington, DC, built in 1924. In its 2024 Washington, DC benchmarking disclosure it reported an ENERGY STAR score of 45 out of 100 (grade D), a site energy-use intensity of 52.7 kBtu/ft² and 83 tCO₂e of greenhouse-gas emissions. That score is higher than 58% of the 72 scored worship facility buildings in Washington, DC.

ENERGY STAR score
45
band D · 2024
Site EUI
52.7
kBtu/ft²
GHG emissions
83
tCO₂e
GHG intensity
3.0
kgCO₂e/ft²
Floor area
27,358
sq ft
Year built
1924
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

Clean and Affordable Energy Act / BEPS · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score45 (band D)
Site EUI52.7 kBtu/ft²
Source EUI66.8 kBtu/ft²
GHG emissions83 tCO₂e
GHG intensity3.0 kgCO₂e/ft²
Electricity52,742 kWh
Natural gas12,615 therms
Water use16,107 kgal
Gross floor area27,358 sq ft
Source recorddc:PM20477882:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest45-952.7 kBtu/ft²83 tCO₂e
20235441.4 kBtu/ft²67 tCO₂e
2022———

Compliance context

Clean and Affordable Energy Act / BEPS

DC's Building Energy Performance Standards (BEPS) require buildings below the performance standard to improve over compliance cycles (the first ends December 31, 2026; later cycles run five years), with penalties for buildings that fail to meet their pathway.

Program details →

Ownership

ROMAN CATHOLIC ARCHBISHOP OF WASHINGTON

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
6001 - 13th Street, NW
State
District of Columbia
ZIP
20011
Coordinates
38.96335, -77.02830

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in Washington, DC · biggest emitters

How does Church of the Nativity compare with other worship facility buildings in Washington, DC?

The latest disclosures cover 88 worship facility buildings in Washington, DC, out of 6,870 buildings citywide. Church of the Nativity's ENERGY STAR score of 45 compares with an average of 43 across the 72 that report a score; it scores higher than 58% of them and lower than 40%. Its site EUI of 52.7 kBtu/ft² is roughly in line with the average of 51.9 kBtu/ft². Its emissions intensity of 3.0 kgCO₂e/ft² is about 16% below the group average of 3.6 kgCO₂e/ft².

At 27,358 sq ft, it is about 44% below the average floor area of 49,290 sq ft for those buildings. It was built in 1924, 10 years earlier than the group's average year built (1934). Across all 24 jurisdictions BuildingCensus covers, the 1,035 worship facility buildings average an ENERGY STAR score of 50 and a site EUI of 47.8 kBtu/ft².

How has Church of the Nativity's energy performance changed over time?

BuildingCensus holds 3 Washington, DC disclosures for Church of the Nativity, covering report years 2022–2024. Its ENERGY STAR score went from 54 in 2023 to 45 in 2024 (-9 points); its best year on file was 2023, at 54. Site EUI moved from 41.4 kBtu/ft² (2023) to 52.7 kBtu/ft² (2024), an 27% increase. Reported emissions went from 67 tCO₂e to 83 tCO₂e over the same span (up 24%).

What does an ENERGY STAR score of 45 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 45 means the building performs better than about 45% of its national peers. BuildingCensus bands the score into report-card grades; 45 falls in band D — lowest band (1–54). It sits 30 points below 75, the threshold for ENERGY STAR certification. In Washington, DC, 47% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Church of the Nativity's 52.7 kBtu/ft² across 27,358 sq ft works out to about 1.4 billion Btu (423 MWh-equivalent) in 2024. Its source EUI of 66.8 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 52,742 kWh of electricity, 12,615 therms of natural gas and 16,107 thousand gallons of water for the year.

Which law requires Church of the Nativity to report its energy use?

Church of the Nativity reports under the Clean and Affordable Energy Act / BEPS, the legal basis of Washington, DC's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record dc:PM20477882:2024). DC's Building Energy Performance Standards (BEPS) require buildings below the performance standard to improve over compliance cycles (the first ends December 31, 2026; later cycles run five years), with penalties for buildings that fail to meet their pathway.

More worship facility buildings in Washington, DC

Frequently asked questions

What is Church of the Nativity's energy grade?

Church of the Nativity scores 45 out of 100 on ENERGY STAR — band D, lowest band (1–54) — in its 2024 Washington, DC disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Church of the Nativity use?

Its 2024 site energy-use intensity was 52.7 kBtu/ft² (66.8 kBtu/ft² source) across 27,358 sq ft, including 52,742 kWh of electricity and 12,615 therms of natural gas.

What are Church of the Nativity's carbon emissions?

Church of the Nativity reported 83 tCO₂e of greenhouse-gas emissions (3.0 kgCO₂e/ft²) for 2024.

Where is Church of the Nativity?

Church of the Nativity is at 6001 - 13th Street, NW, in Washington, DC 20011. Its coordinates are 38.96335, -77.02830 (latitude, longitude), as published in the Building Energy Benchmarking file.

How big is Church of the Nativity and when was it built?

Church of the Nativity has 27,358 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1924 as its year built. It is classed as worship facility.

Is Church of the Nativity covered by the Clean and Affordable Energy Act / BEPS?

Yes — it appears in the 2024 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Clean and Affordable Energy Act / BEPS.

Working with Washington, DC building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking (Clean and Affordable Energy Act / BEPS), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Church of the Nativity, Washington, DC — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/washington-dc/church-of-the-nativity-d81b26d0 (data as of July 9, 2026).