EMB Washington Convention Center-SV
Hotel in Washington, DC, DC · 900 10th Street NW · 20001
At a glance
EMB Washington Convention Center-SV is a 311,119-square-foot hotel at 900 10th Street NW in Washington, DC, built in 2005. In its 2024 Washington, DC benchmarking disclosure it reported an ENERGY STAR score of 78 out of 100 (grade B), a site energy-use intensity of 68.6 kBtu/ft² and 1,518 tCO₂e of greenhouse-gas emissions. That score is higher than 76% of the 251 scored hotel buildings in Washington, DC.
Clean and Affordable Energy Act / BEPS · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 78 (band B) |
| Site EUI | 68.6 kBtu/ft² |
| Source EUI | 153.5 kBtu/ft² |
| GHG emissions | 1,518 tCO₂e |
| GHG intensity | 4.9 kgCO₂e/ft² |
| Electricity | 4,245,528 kWh |
| Natural gas | 68,637 therms |
| Water use | 14,876 kgal |
| Gross floor area | 311,119 sq ft |
| Source record | dc:PM17396033:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | 78 | +21 | 68.6 kBtu/ft² | 1,518 tCO₂e |
| 2023 | 57 | -8 | 102.8 kBtu/ft² | 2,066 tCO₂e |
| 2022 | 65 | -6 | 94.8 kBtu/ft² | 2,055 tCO₂e |
| 2021 | 71 | -6 | 79.9 kBtu/ft² | 1,803 tCO₂e |
| 2020 | 77 | +35 | 73.8 kBtu/ft² | 1,635 tCO₂e |
| 2019 | 42 | +5 | 103.0 kBtu/ft² | 2,382 tCO₂e |
| 2018 | 37 | 110.5 kBtu/ft² | 2,577 tCO₂e |
Compliance context
Clean and Affordable Energy Act / BEPS
DC's Building Energy Performance Standards (BEPS) require buildings below the performance standard to improve over compliance cycles (the first ends December 31, 2026; later cycles run five years), with penalties for buildings that fail to meet their pathway.
Ownership
1000 K LLC
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 900 10th Street NW
- City
- Washington, DC
- State
- District of Columbia
- ZIP
- 20001
- Coordinates
- 38.90198, -77.02627
Within ~1 km
Nearby benchmarked buildings
Convention Center · 1,750,000 sq ft
- 616 E St.score —
Multifamily Housing · 1,150,961 sq ft
Hotel · 1,081,202 sq ft
Multifamily Housing · 1,075,449 sq ft
Office · 887,915 sq ft
Office · 876,744 sq ft
See also: most efficient in Washington, DC · biggest emitters
How does EMB Washington Convention Center-SV compare with other hotel buildings in Washington, DC?
The latest disclosures cover 257 hotel buildings in Washington, DC, out of 6,870 buildings citywide. EMB Washington Convention Center-SV's ENERGY STAR score of 78 compares with an average of 58 across the 251 that report a score; it scores higher than 76% of them and lower than 23%. Its site EUI of 68.6 kBtu/ft² is about 22% below the average of 87.6 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 4.9 kgCO₂e/ft² is about 29% below the group average of 6.9 kgCO₂e/ft².
At 311,119 sq ft, it is about 37% above the average floor area of 227,860 sq ft for those buildings. It was built in 2005, 31 years later than the group's average year built (1974). Across all 24 jurisdictions BuildingCensus covers, the 3,812 hotel buildings average an ENERGY STAR score of 65 and a site EUI of 77.8 kBtu/ft².
How has EMB Washington Convention Center-SV's energy performance changed over time?
BuildingCensus holds 7 Washington, DC disclosures for EMB Washington Convention Center-SV, covering report years 2018–2024. Its ENERGY STAR score went from 37 in 2018 to 78 in 2024 (+41 points). Site EUI moved from 110.5 kBtu/ft² (2018) to 68.6 kBtu/ft² (2024), a 38% decrease. Reported emissions went from 2,577 tCO₂e to 1,518 tCO₂e over the same span (down 41%).
What does an ENERGY STAR score of 78 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 78 means the building performs better than about 78% of its national peers. BuildingCensus bands the score into report-card grades; 78 falls in band B — above median (70–84). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In Washington, DC, 47% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. EMB Washington Convention Center-SV's 68.6 kBtu/ft² across 311,119 sq ft works out to about 21.3 billion Btu (6,255 MWh-equivalent) in 2024. Its source EUI of 153.5 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 4,245,528 kWh of electricity, 68,637 therms of natural gas and 14,876 thousand gallons of water for the year.
Which law requires EMB Washington Convention Center-SV to report its energy use?
EMB Washington Convention Center-SV reports under the Clean and Affordable Energy Act / BEPS, the legal basis of Washington, DC's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record dc:PM17396033:2024). DC's Building Energy Performance Standards (BEPS) require buildings below the performance standard to improve over compliance cycles (the first ends December 31, 2026; later cycles run five years), with penalties for buildings that fail to meet their pathway.
More hotel buildings in Washington, DC
- Embassy Suites Georgetown· 306,123 sq ft · score 100 (A)
- Embassy Suites by Hilton Washington DC Georgetown (WASDN)· 306,123 sq ft · score 64 (C)
- AC Washington DC· 303,144 sq ft · score 100 (A)
- Park Hyatt Washington· 300,000 sq ft · score 31 (D)
- Hyatt Place DC National Mall· 294,130 sq ft · score 95 (A)
- HFS The Madison Washington DC-SV· 287,557 sq ft · score 72 (B)
- Hotel buildings in Washington, DC· 257 benchmarked
- All Washington, DC benchmarked buildings· Clean and Affordable Energy Act / BEPS
- Most efficient large buildings in Washington, DC
- Least efficient large buildings in Washington, DC
- Biggest emitters in Washington, DC
Frequently asked questions
What is EMB Washington Convention Center-SV's energy grade?
EMB Washington Convention Center-SV scores 78 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2024 Washington, DC disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does EMB Washington Convention Center-SV use?
Its 2024 site energy-use intensity was 68.6 kBtu/ft² (153.5 kBtu/ft² source) across 311,119 sq ft, including 4,245,528 kWh of electricity and 68,637 therms of natural gas.
What are EMB Washington Convention Center-SV's carbon emissions?
EMB Washington Convention Center-SV reported 1,518 tCO₂e of greenhouse-gas emissions (4.9 kgCO₂e/ft²) for 2024.
Where is EMB Washington Convention Center-SV?
EMB Washington Convention Center-SV is at 900 10th Street NW, in Washington, DC 20001. Its coordinates are 38.90198, -77.02627 (latitude, longitude), as published in the Building Energy Benchmarking file.
How big is EMB Washington Convention Center-SV and when was it built?
EMB Washington Convention Center-SV has 311,119 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2005 as its year built. It is classed as hotel.
Is EMB Washington Convention Center-SV covered by the Clean and Affordable Energy Act / BEPS?
Yes — it appears in the 2024 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Clean and Affordable Energy Act / BEPS.
Working with Washington, DC building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking (Clean and Affordable Energy Act / BEPS), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “EMB Washington Convention Center-SV, Washington, DC — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/washington-dc/emb-washington-convention-center-sv-3436f44c (data as of July 9, 2026).