Engine Company 7 and FEMS Fleet Maintenance Center
Repair Services (Vehicle, Shoe, Locksmith, etc) in Washington, DC, DC · 1101 HALF STREET SW · 20024
At a glance
Engine Company 7 and FEMS Fleet Maintenance Center is a 45,296-square-foot repair services (vehicle, shoe, locksmith, etc) building at 1101 HALF STREET SW in Washington, DC. In its 2018 Washington, DC benchmarking disclosure it reported a site energy-use intensity of 188.0 kBtu/ft² and 576 tCO₂e of greenhouse-gas emissions.
Clean and Affordable Energy Act / BEPS · reporting year 2018
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 188.0 kBtu/ft² |
| Source EUI | 309.1 kBtu/ft² |
| GHG emissions | 576 tCO₂e |
| GHG intensity | 12.7 kgCO₂e/ft² |
| Electricity | 847,417 kWh |
| Natural gas | 56,257 therms |
| Gross floor area | 45,296 sq ft |
| Source record | dc:PM3412672:2018 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2018latest | — | 188.0 kBtu/ft² | 576 tCO₂e | |
| 2017 | — | 119.6 kBtu/ft² | 550 tCO₂e | |
| 2016 | — | 122.5 kBtu/ft² | 557 tCO₂e | |
| 2015 | — | 157.5 kBtu/ft² | 672 tCO₂e | |
| 2014 | — | 188.1 kBtu/ft² | 595 tCO₂e | |
| 2013 | — | 144.5 kBtu/ft² | 490 tCO₂e | |
| 2012 | — | 141.6 kBtu/ft² | 483 tCO₂e |
Compliance context
Clean and Affordable Energy Act / BEPS
DC's Building Energy Performance Standards (BEPS) require buildings below the performance standard to improve over compliance cycles (the first ends December 31, 2026; later cycles run five years), with penalties for buildings that fail to meet their pathway.
Ownership
GOVERNMENT OF THE DISTRICT OF COLUMBIA DEPARTMENT OF GENERAL SERVICES
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 1101 HALF STREET SW
- City
- Washington, DC
- State
- District of Columbia
- ZIP
- 20024
- Coordinates
- 38.87677, -77.01091
Within ~1 km
Nearby benchmarked buildings
- Nationals Parkscore —
Stadium (Open) · 1,232,227 sq ft
Multifamily Housing · 889,308 sq ft
- Illume (ll117)score 90
Multifamily Housing · 756,018 sq ft
- Harbour Square Owners, Inc.score 47
Multifamily Housing · 729,310 sq ft
- Harbour Squarescore 18
Multifamily Housing · 706,408 sq ft
- Two Independence Squarescore 99
Office · 634,947 sq ft
See also: most efficient in Washington, DC · biggest emitters
How does Engine Company 7 and FEMS Fleet Maintenance Center compare with other buildings in Washington, DC?
The latest disclosures cover 6,870 benchmarked buildings in Washington, DC. Its site EUI of 188.0 kBtu/ft² is about 198% above the average of 63.1 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 12.7 kgCO₂e/ft² is about 154% above the group average of 5.0 kgCO₂e/ft².
At 45,296 sq ft, it is about 72% below the average floor area of 161,007 sq ft for those buildings.
How has Engine Company 7 and FEMS Fleet Maintenance Center's energy performance changed over time?
BuildingCensus holds 7 Washington, DC disclosures for Engine Company 7 and FEMS Fleet Maintenance Center, covering report years 2012–2018. Site EUI moved from 141.6 kBtu/ft² (2012) to 188.0 kBtu/ft² (2018), an 33% increase. Reported emissions went from 483 tCO₂e to 576 tCO₂e over the same span (up 19%).
What does a site EUI of 188.0 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Engine Company 7 and FEMS Fleet Maintenance Center's 188.0 kBtu/ft² across 45,296 sq ft works out to about 8.5 billion Btu (2,496 MWh-equivalent) in 2018. Its source EUI of 309.1 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 847,417 kWh of electricity and 56,257 therms of natural gas for the year.
Which law requires Engine Company 7 and FEMS Fleet Maintenance Center to report its energy use?
Engine Company 7 and FEMS Fleet Maintenance Center reports under the Clean and Affordable Energy Act / BEPS, the legal basis of Washington, DC's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2018 disclosure (source record dc:PM3412672:2018). DC's Building Energy Performance Standards (BEPS) require buildings below the performance standard to improve over compliance cycles (the first ends December 31, 2026; later cycles run five years), with penalties for buildings that fail to meet their pathway.
More repair services (vehicle, shoe, locksmith, etc) buildings in Washington, DC
- MPD Fleet Maintenance· 41,576 sq ft · EUI 71.8 kBtu/ft²
- 1901 4th ST NE· 33,601 sq ft
- Car Barn Training Center· 15,000 sq ft · EUI 314.7 kBtu/ft²
- All Washington, DC benchmarked buildings· Clean and Affordable Energy Act / BEPS
- Most efficient large buildings in Washington, DC
- Least efficient large buildings in Washington, DC
- Biggest emitters in Washington, DC
Frequently asked questions
What is Engine Company 7 and FEMS Fleet Maintenance Center's energy grade?
Engine Company 7 and FEMS Fleet Maintenance Center did not report an ENERGY STAR score in its 2018 disclosure, but its site energy-use intensity was 188.0 kBtu/ft².
How much energy does Engine Company 7 and FEMS Fleet Maintenance Center use?
Its 2018 site energy-use intensity was 188.0 kBtu/ft² (309.1 kBtu/ft² source) across 45,296 sq ft, including 847,417 kWh of electricity and 56,257 therms of natural gas.
What are Engine Company 7 and FEMS Fleet Maintenance Center's carbon emissions?
Engine Company 7 and FEMS Fleet Maintenance Center reported 576 tCO₂e of greenhouse-gas emissions (12.7 kgCO₂e/ft²) for 2018.
Where is Engine Company 7 and FEMS Fleet Maintenance Center?
Engine Company 7 and FEMS Fleet Maintenance Center is at 1101 HALF STREET SW, in Washington, DC 20024. Its coordinates are 38.87677, -77.01091 (latitude, longitude), as published in the Building Energy Benchmarking file.
How big is Engine Company 7 and FEMS Fleet Maintenance Center and when was it built?
Engine Company 7 and FEMS Fleet Maintenance Center has 45,296 sq ft of gross floor area, as reported in its 2018 disclosure. It is classed as repair services (vehicle, shoe, locksmith, etc).
Is Engine Company 7 and FEMS Fleet Maintenance Center covered by the Clean and Affordable Energy Act / BEPS?
Yes — it appears in the 2018 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Clean and Affordable Energy Act / BEPS.
Working with Washington, DC building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking (Clean and Affordable Energy Act / BEPS), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Engine Company 7 and FEMS Fleet Maintenance Center, Washington, DC — 2018 benchmarking disclosure”, https://buildingcensus.com/buildings/washington-dc/engine-company-7-and-fems-fleet-maintenance-center-83c15811 (data as of July 9, 2026).