First District Substation is a 12,201-square-foot police station at 500 E STREET SE in Washington, DC. In its 2018 Washington, DC benchmarking disclosure it reported a site energy-use intensity of 78.1 kBtu/ft² and 71 tCO₂e of greenhouse-gas emissions.
Clean and Affordable Energy Act / BEPS · reporting year 2018
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 78.1 kBtu/ft² |
| Source EUI | 150.9 kBtu/ft² |
| GHG emissions | 71 tCO₂e |
| GHG intensity | 5.8 kgCO₂e/ft² |
| Electricity | 140,707 kWh |
| Natural gas | 4,730 therms |
| Gross floor area | 12,201 sq ft |
| Source record | dc:PM3412541:2018 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2018latest | — | 78.1 kBtu/ft² | 71 tCO₂e | |
| 2017 | — | 73.6 kBtu/ft² | 79 tCO₂e | |
| 2016 | — | 76.6 kBtu/ft² | 81 tCO₂e | |
| 2015 | — | 87.0 kBtu/ft² | 91 tCO₂e | |
| 2014 | — | 84.0 kBtu/ft² | 83 tCO₂e | |
| 2013 | — | 77.0 kBtu/ft² | 80 tCO₂e | |
| 2012 | — | 75.0 kBtu/ft² | 81 tCO₂e |
Compliance context
Clean and Affordable Energy Act / BEPS
DC's Building Energy Performance Standards (BEPS) require buildings below the performance standard to improve over compliance cycles (the first ends December 31, 2026; later cycles run five years), with penalties for buildings that fail to meet their pathway.
Ownership
GOVERNMENT OF THE DISTRICT OF COLUMBIA DEPARTMENT OF GENERAL SERVICES
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 500 E STREET SE
- City
- Washington, DC
- State
- District of Columbia
- ZIP
- 20003
- Coordinates
- 38.88338, -76.99924
Within ~1 km
Nearby benchmarked buildings
- USDOT Buildingscore 96
Office · 1,169,662 sq ft
Multifamily Housing · 889,308 sq ft
- Illume (ll117)score 90
Multifamily Housing · 756,018 sq ft
- 70 Capitol Yards _ CO (cp040)score 95
Multifamily Housing · 459,264 sq ft
- Park Chelsea at The Collectivescore 86
Multifamily Housing · 454,658 sq ft
- 200 I Street Municipal Buildingscore 83
Office · 440,069 sq ft
See also: most efficient in Washington, DC · biggest emitters
How does First District Substation compare with other police station buildings in Washington, DC?
The latest disclosures cover 20 police station buildings in Washington, DC, out of 6,870 buildings citywide. Its site EUI of 78.1 kBtu/ft² is about 15% below the average of 91.4 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 5.8 kgCO₂e/ft² is about 16% below the group average of 6.9 kgCO₂e/ft².
At 12,201 sq ft, it is about 70% below the average floor area of 40,623 sq ft for those buildings.
How has First District Substation's energy performance changed over time?
BuildingCensus holds 7 Washington, DC disclosures for First District Substation, covering report years 2012–2018. Site EUI moved from 75.0 kBtu/ft² (2012) to 78.1 kBtu/ft² (2018), an 4% increase. Reported emissions went from 81 tCO₂e to 71 tCO₂e over the same span (down 12%).
What does a site EUI of 78.1 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. First District Substation's 78.1 kBtu/ft² across 12,201 sq ft works out to about 1 billion Btu (279 MWh-equivalent) in 2018. Its source EUI of 150.9 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 140,707 kWh of electricity and 4,730 therms of natural gas for the year.
Which law requires First District Substation to report its energy use?
First District Substation reports under the Clean and Affordable Energy Act / BEPS, the legal basis of Washington, DC's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2018 disclosure (source record dc:PM3412541:2018). DC's Building Energy Performance Standards (BEPS) require buildings below the performance standard to improve over compliance cycles (the first ends December 31, 2026; later cycles run five years), with penalties for buildings that fail to meet their pathway.
More police station buildings in Washington, DC
- Traffic Safety and Specialized Enforcement Branch· 11,512 sq ft · EUI 17.2 kBtu/ft²
- MPD Harbor Patrol/FEMS Fire Boat· 10,578 sq ft · EUI 232.0 kBtu/ft²
- All Washington, DC benchmarked buildings· Clean and Affordable Energy Act / BEPS
- Most efficient large buildings in Washington, DC
- Least efficient large buildings in Washington, DC
- Biggest emitters in Washington, DC
Frequently asked questions
What is First District Substation's energy grade?
First District Substation did not report an ENERGY STAR score in its 2018 disclosure, but its site energy-use intensity was 78.1 kBtu/ft².
How much energy does First District Substation use?
Its 2018 site energy-use intensity was 78.1 kBtu/ft² (150.9 kBtu/ft² source) across 12,201 sq ft, including 140,707 kWh of electricity and 4,730 therms of natural gas.
What are First District Substation's carbon emissions?
First District Substation reported 71 tCO₂e of greenhouse-gas emissions (5.8 kgCO₂e/ft²) for 2018.
Where is First District Substation?
First District Substation is at 500 E STREET SE, in Washington, DC 20003. Its coordinates are 38.88338, -76.99924 (latitude, longitude), as published in the Building Energy Benchmarking file.
How big is First District Substation and when was it built?
First District Substation has 12,201 sq ft of gross floor area, as reported in its 2018 disclosure. It is classed as police station.
Is First District Substation covered by the Clean and Affordable Energy Act / BEPS?
Yes — it appears in the 2018 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Clean and Affordable Energy Act / BEPS.
Working with Washington, DC building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking (Clean and Affordable Energy Act / BEPS), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “First District Substation, Washington, DC — 2018 benchmarking disclosure”, https://buildingcensus.com/buildings/washington-dc/first-district-substation-d34546c4 (data as of July 9, 2026).