Hill House
Multifamily Housing in Washington, DC, DC · 110 D St SE · 20003
At a glance
Hill House is a 60,842-square-foot multifamily housing building at 110 D St SE in Washington, DC, built in 1959. In its 2024 Washington, DC benchmarking disclosure it reported an ENERGY STAR score of 64 out of 100 (grade C), a site energy-use intensity of 68.3 kBtu/ft² and 270 tCO₂e of greenhouse-gas emissions. That score is higher than 31% of the 1,618 scored multifamily housing buildings in Washington, DC.
Clean and Affordable Energy Act / BEPS · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 64 (band C) |
| Site EUI | 68.3 kBtu/ft² |
| Source EUI | 112.6 kBtu/ft² |
| GHG emissions | 270 tCO₂e |
| GHG intensity | 4.4 kgCO₂e/ft² |
| Electricity | 417,350 kWh |
| Natural gas | 27,295 therms |
| Water use | 1,959 kgal |
| Gross floor area | 60,842 sq ft |
| Source record | dc:PM3997905:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | 64 | ±0 | 68.3 kBtu/ft² | 270 tCO₂e |
| 2023 | 64 | -1 | 66.0 kBtu/ft² | 263 tCO₂e |
| 2022 | 65 | +1 | 71.7 kBtu/ft² | 278 tCO₂e |
| 2021 | 64 | +2 | 67.7 kBtu/ft² | 275 tCO₂e |
| 2020 | 62 | +11 | 67.3 kBtu/ft² | 278 tCO₂e |
| 2019 | 51 | +10 | 75.9 kBtu/ft² | 310 tCO₂e |
| 2018 | 41 | +4 | 90.6 kBtu/ft² | 362 tCO₂e |
| 2017 | 37 | +3 | 65.4 kBtu/ft² | 307 tCO₂e |
| 2016 | 34 | -6 | 75.6 kBtu/ft² | 342 tCO₂e |
| 2015 | 40 | +5 | 73.9 kBtu/ft² | 361 tCO₂e |
| 2014 | 35 | 77.9 kBtu/ft² | 371 tCO₂e | |
| 2013 | — | 53.1 kBtu/ft² | 287 tCO₂e |
Compliance context
Clean and Affordable Energy Act / BEPS
DC's Building Energy Performance Standards (BEPS) require buildings below the performance standard to improve over compliance cycles (the first ends December 31, 2026; later cycles run five years), with penalties for buildings that fail to meet their pathway.
Ownership
MAR CAL LLC
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 110 D St SE
- City
- Washington, DC
- State
- District of Columbia
- ZIP
- 20003
- Coordinates
- 38.88532, -77.00509
Within ~1 km
Nearby benchmarked buildings
Multifamily Housing · 889,308 sq ft
- Illume (ll117)score 90
Multifamily Housing · 756,018 sq ft
- 101 Constitutionscore 67
Office · 558,162 sq ft
Multifamily Housing · 543,795 sq ft
- 70 Capitol Yards _ CO (cp040)score 95
Multifamily Housing · 459,264 sq ft
- Park Chelsea at The Collectivescore 86
Multifamily Housing · 454,658 sq ft
See also: most efficient in Washington, DC · biggest emitters
How does Hill House compare with other multifamily housing buildings in Washington, DC?
The latest disclosures cover 1,799 multifamily housing buildings in Washington, DC, out of 6,870 buildings citywide. Hill House's ENERGY STAR score of 64 compares with an average of 72 across the 1,618 that report a score; it scores higher than 31% of them and lower than 68%. Its site EUI of 68.3 kBtu/ft² is about 34% above the average of 51.1 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 4.4 kgCO₂e/ft² is about 17% above the group average of 3.8 kgCO₂e/ft².
At 60,842 sq ft, it is about 55% below the average floor area of 136,346 sq ft for those buildings. It was built in 1959, 6 years earlier than the group's average year built (1965). Across all 24 jurisdictions BuildingCensus covers, the 59,945 multifamily housing buildings average an ENERGY STAR score of 70 and a site EUI of 59.0 kBtu/ft².
How has Hill House's energy performance changed over time?
BuildingCensus holds 12 Washington, DC disclosures for Hill House, covering report years 2013–2024. Its ENERGY STAR score went from 35 in 2014 to 64 in 2024 (+29 points); its best year on file was 2022, at 65. Site EUI moved from 53.1 kBtu/ft² (2013) to 68.3 kBtu/ft² (2024), an 29% increase. Reported emissions went from 287 tCO₂e to 270 tCO₂e over the same span (down 6%).
What does an ENERGY STAR score of 64 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 64 means the building performs better than about 64% of its national peers. BuildingCensus bands the score into report-card grades; 64 falls in band C — below median (55–69). It sits 11 points below 75, the threshold for ENERGY STAR certification. In Washington, DC, 47% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Hill House's 68.3 kBtu/ft² across 60,842 sq ft works out to about 4.2 billion Btu (1,218 MWh-equivalent) in 2024. Its source EUI of 112.6 kBtu/ft² also counts the energy lost generating and delivering that power, which is why it is higher. The disclosure also reports 417,350 kWh of electricity, 27,295 therms of natural gas and 1,959 thousand gallons of water for the year.
Which law requires Hill House to report its energy use?
Hill House reports under the Clean and Affordable Energy Act / BEPS, the legal basis of Washington, DC's Building Energy Benchmarking program, which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record dc:PM3997905:2024). DC's Building Energy Performance Standards (BEPS) require buildings below the performance standard to improve over compliance cycles (the first ends December 31, 2026; later cycles run five years), with penalties for buildings that fail to meet their pathway.
More multifamily housing buildings in Washington, DC
- Plaza West Cooperative Association Inc· 60,764 sq ft · score 96 (A)
- Crestview Condominiums· 60,748 sq ft · score 100 (A)
- PHYLMAR PLAZA CONDO· 60,736 sq ft · EUI 45.9 kBtu/ft²
- 2915 Connecticut Ave NW· 60,596 sq ft · score 86 (A)
- Sherry Hall· 60,577 sq ft · score 44 (D)
- East Coast: North Capitol at Plymouth· 60,487 sq ft · score 66 (C)
- Multifamily Housing buildings in Washington, DC· 1,799 benchmarked
- All Washington, DC benchmarked buildings· Clean and Affordable Energy Act / BEPS
- Most efficient large buildings in Washington, DC
- Least efficient large buildings in Washington, DC
- Biggest emitters in Washington, DC
Frequently asked questions
What is Hill House's energy grade?
Hill House scores 64 out of 100 on ENERGY STAR — band C, below median (55–69) — in its 2024 Washington, DC disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does Hill House use?
Its 2024 site energy-use intensity was 68.3 kBtu/ft² (112.6 kBtu/ft² source) across 60,842 sq ft, including 417,350 kWh of electricity and 27,295 therms of natural gas.
What are Hill House's carbon emissions?
Hill House reported 270 tCO₂e of greenhouse-gas emissions (4.4 kgCO₂e/ft²) for 2024.
Where is Hill House?
Hill House is at 110 D St SE, in Washington, DC 20003. Its coordinates are 38.88532, -77.00509 (latitude, longitude), as published in the Building Energy Benchmarking file.
How big is Hill House and when was it built?
Hill House has 60,842 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1959 as its year built. It is classed as multifamily housing.
Is Hill House covered by the Clean and Affordable Energy Act / BEPS?
Yes — it appears in the 2024 Building Energy Benchmarking disclosure, which lists the buildings reporting under the Clean and Affordable Energy Act / BEPS.
Working with Washington, DC building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking (Clean and Affordable Energy Act / BEPS), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Hill House, Washington, DC — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/washington-dc/hill-house-4ec43947 (data as of July 9, 2026).