311J1-Oakpl-Pleasanton Courtyard
Hotel in California, CA · 5059 Hopyard Road, Pleasanton · 94588
At a glance
311J1-Oakpl-Pleasanton Courtyard is a 77,700-square-foot hotel at 5059 Hopyard Road, Pleasanton in Pleasanton, California, built in 1990. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 97 out of 100 (grade A), a site energy-use intensity of 48.3 kBtu/ft² and 222 tCO₂e of greenhouse-gas emissions. That score is higher than 82% of the 1,525 scored hotel buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 97 (band A) |
| Site EUI | 48.3 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 222 tCO₂e |
| GHG intensity | 2.9 kgCO₂e/ft² |
| Electricity | 522,528 kWh |
| Natural gas | 19,444 therms |
| Gross floor area | 77,700 sq ft |
| Source record | california:3351407:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | 97 | ±0 | 48.3 kBtu/ft² | 222 tCO₂e |
| 2021 | 97 | -2 | 46.9 kBtu/ft² | 220 tCO₂e |
| 2020 | 99 | +10 | 36.3 kBtu/ft² | 168 tCO₂e |
| 2019 | 89 | -2 | 58.7 kBtu/ft² | 281 tCO₂e |
| 2018 | 91 | 55.9 kBtu/ft² | 266 tCO₂e |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 5059 Hopyard Road, Pleasanton
- City
- California
- State
- California
- ZIP
- 94588
- Coordinates
- 37.69400, -121.90228
Within ~1 km
Nearby benchmarked buildings
Multifamily Housing · 475,362 sq ft
Office · 463,512 sq ft
- Pleasanton Tech Ctr - Hacienda Dr.score 100
Medical Office · 384,657 sq ft
Office · 186,903 sq ft
- Cn470E - Ptc Building Escore —
Office · 180,996 sq ft
- 003211 - Signature Center Iiscore 90
Office · 163,385 sq ft
See also: most efficient in California · biggest emitters
How does 311J1-Oakpl-Pleasanton Courtyard compare with other hotel buildings in California?
The latest disclosures cover 1,599 hotel buildings in California, out of 40,029 buildings citywide. 311J1-Oakpl-Pleasanton Courtyard's ENERGY STAR score of 97 compares with an average of 74 across the 1,525 that report a score; it scores higher than 82% of them and lower than 15%. Its site EUI of 48.3 kBtu/ft² is about 26% below the average of 65.6 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 2.9 kgCO₂e/ft² is about 29% below the group average of 4.0 kgCO₂e/ft².
At 77,700 sq ft, it is about half of the average floor area of 167,786 sq ft for those buildings. Its 1990 construction date is close to the group's average year built (1988). Across all 24 jurisdictions BuildingCensus covers, the 3,812 hotel buildings average an ENERGY STAR score of 65 and a site EUI of 77.8 kBtu/ft².
How has 311J1-Oakpl-Pleasanton Courtyard's energy performance changed over time?
BuildingCensus holds 5 California disclosures for 311J1-Oakpl-Pleasanton Courtyard, covering report years 2018, 2019, 2020, 2021, 2024. Its ENERGY STAR score went from 91 in 2018 to 97 in 2024 (+6 points); its best year on file was 2020, at 99. Site EUI moved from 55.9 kBtu/ft² (2018) to 48.3 kBtu/ft² (2024), a 14% decrease. Reported emissions went from 266 tCO₂e to 222 tCO₂e over the same span (down 17%).
What does an ENERGY STAR score of 97 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 97 means the building performs better than about 97% of its national peers. BuildingCensus bands the score into report-card grades; 97 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 311J1-Oakpl-Pleasanton Courtyard's 48.3 kBtu/ft² across 77,700 sq ft works out to about 3.8 billion Btu (1,100 MWh-equivalent) in 2024. The disclosure also reports 522,528 kWh of electricity and 19,444 therms of natural gas for the year.
Which law requires 311J1-Oakpl-Pleasanton Courtyard to report its energy use?
311J1-Oakpl-Pleasanton Courtyard reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:3351407:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More hotel buildings in California
- Marin Suites Hotel· 77,656 sq ft · score 100 (A)
- Springhill Suites By Marriott· 77,408 sq ft · score 95 (A)
- Hampton Inn West Covina· 77,400 sq ft · score 100 (A)
- Embassy Suites By Hilton Lompoc· 77,394 sq ft · score 99 (A)
- Ramada Inn Silicon Valley / Sunnyvale· 77,248 sq ft · score 71 (B)
- Mission View Inn· 77,101 sq ft · score 97 (A)
- Hotel buildings in California· 1,599 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is 311J1-Oakpl-Pleasanton Courtyard's energy grade?
311J1-Oakpl-Pleasanton Courtyard scores 97 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does 311J1-Oakpl-Pleasanton Courtyard use?
Its 2024 site energy-use intensity was 48.3 kBtu/ft² across 77,700 sq ft, including 522,528 kWh of electricity and 19,444 therms of natural gas.
What are 311J1-Oakpl-Pleasanton Courtyard's carbon emissions?
311J1-Oakpl-Pleasanton Courtyard reported 222 tCO₂e of greenhouse-gas emissions (2.9 kgCO₂e/ft²) for 2024.
Where is 311J1-Oakpl-Pleasanton Courtyard?
311J1-Oakpl-Pleasanton Courtyard is at 5059 Hopyard Road, Pleasanton, in Pleasanton, California 94588. Its coordinates are 37.69400, -121.90228 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is 311J1-Oakpl-Pleasanton Courtyard and when was it built?
311J1-Oakpl-Pleasanton Courtyard has 77,700 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1990 as its year built. It is classed as hotel.
Is 311J1-Oakpl-Pleasanton Courtyard covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “311J1-Oakpl-Pleasanton Courtyard, Pleasanton, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/311j1-oakpl-pleasanton-courtyard-46a92e12 (data as of July 9, 2026).