BuildingCensus
C

54-I1 South County Justice Center

Courthouse in California, CA · 300 East Olive Avenue, Porterville · 93257

At a glance

54-I1 South County Justice Center is a 96,532-square-foot courthouse building at 300 East Olive Avenue, Porterville in Porterville, California, built in 2013. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 64 out of 100 (grade C), a site energy-use intensity of 65.5 kBtu/ft² and 401 tCO₂e of greenhouse-gas emissions. That score is higher than 53% of the 93 scored courthouse buildings in California.

ENERGY STAR score
64
band C · 2024
Site EUI
65.5
kBtu/ft²
GHG emissions
401
tCO₂e
GHG intensity
4.2
kgCO₂e/ft²
Floor area
96,532
sq ft
Year built
2013
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 2 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score64 (band C)
Site EUI65.5 kBtu/ft²
Source EUI—
GHG emissions401 tCO₂e
GHG intensity4.2 kgCO₂e/ft²
Electricity1,346,467 kWh
Natural gas18,074 therms
Gross floor area96,532 sq ft
Source recordcalifornia:7815779:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest64+265.5 kBtu/ft²401 tCO₂e
202362+568.9 kBtu/ft²437 tCO₂e
202257-372.1 kBtu/ft²457 tCO₂e
202160+170.7 kBtu/ft²405 tCO₂e
202059-669.0 kBtu/ft²422 tCO₂e
201965-462.9 kBtu/ft²403 tCO₂e
20186959.0 kBtu/ft²377 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
300 East Olive Avenue, Porterville
State
California
ZIP
93257
Coordinates
36.06648, -119.01178

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does 54-I1 South County Justice Center compare with other courthouse buildings in California?

The latest disclosures cover 114 courthouse buildings in California, out of 40,029 buildings citywide. 54-I1 South County Justice Center's ENERGY STAR score of 64 compares with an average of 61 across the 93 that report a score; it scores higher than 53% of them and lower than 45%. Its site EUI of 65.5 kBtu/ft² is about 15% below the average of 76.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 4.2 kgCO₂e/ft² is about 12% below the group average of 4.7 kgCO₂e/ft².

At 96,532 sq ft, it is about half of the average floor area of 184,912 sq ft for those buildings. It was built in 2013, 31 years later than the group's average year built (1982). Across all 24 jurisdictions BuildingCensus covers, the 178 courthouse buildings average an ENERGY STAR score of 62 and a site EUI of 76.2 kBtu/ft².

How has 54-I1 South County Justice Center's energy performance changed over time?

BuildingCensus holds 7 California disclosures for 54-I1 South County Justice Center, covering report years 2018–2024. Its ENERGY STAR score went from 69 in 2018 to 64 in 2024 (-5 points); its best year on file was 2018, at 69. Site EUI moved from 59.0 kBtu/ft² (2018) to 65.5 kBtu/ft² (2024), an 11% increase. Reported emissions went from 377 tCO₂e to 401 tCO₂e over the same span (up 6%).

What does an ENERGY STAR score of 64 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 64 means the building performs better than about 64% of its national peers. BuildingCensus bands the score into report-card grades; 64 falls in band C — below median (55–69). It sits 11 points below 75, the threshold for ENERGY STAR certification. In California, 65% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 54-I1 South County Justice Center's 65.5 kBtu/ft² across 96,532 sq ft works out to about 6.3 billion Btu (1,853 MWh-equivalent) in 2024. The disclosure also reports 1,346,467 kWh of electricity and 18,074 therms of natural gas for the year.

Which law requires 54-I1 South County Justice Center to report its energy use?

54-I1 South County Justice Center reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:7815779:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More courthouse buildings in California

Frequently asked questions

What is 54-I1 South County Justice Center's energy grade?

54-I1 South County Justice Center scores 64 out of 100 on ENERGY STAR — band C, below median (55–69) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does 54-I1 South County Justice Center use?

Its 2024 site energy-use intensity was 65.5 kBtu/ft² across 96,532 sq ft, including 1,346,467 kWh of electricity and 18,074 therms of natural gas.

What are 54-I1 South County Justice Center's carbon emissions?

54-I1 South County Justice Center reported 401 tCO₂e of greenhouse-gas emissions (4.2 kgCO₂e/ft²) for 2024.

Where is 54-I1 South County Justice Center?

54-I1 South County Justice Center is at 300 East Olive Avenue, Porterville, in Porterville, California 93257. Its coordinates are 36.06648, -119.01178 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is 54-I1 South County Justice Center and when was it built?

54-I1 South County Justice Center has 96,532 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 2013 as its year built. It is classed as courthouse.

Is 54-I1 South County Justice Center covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “54-I1 South County Justice Center, Porterville, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/54-i1-south-county-justice-center-cd561cc9 (data as of July 9, 2026).