9950 Mission Mill Rd, Pico Rivera, Ca 90601
Non-Refrigerated Warehouse in California, CA · 9950 Mission Mill Road, Whittier · 90601
At a glance
9950 Mission Mill Rd, Pico Rivera, Ca 90601 is a 69,625-square-foot non-refrigerated warehouse at 9950 Mission Mill Road, Whittier in Whittier, California, built in 1984. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 91 out of 100 (grade A), a site energy-use intensity of 5.2 kBtu/ft² and 24 tCO₂e of greenhouse-gas emissions. That score is higher than 68% of the 2,227 scored non-refrigerated warehouse buildings in California.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | 91 (band A) |
| Site EUI | 5.2 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 24 tCO₂e |
| GHG intensity | 0.3 kgCO₂e/ft² |
| Electricity | 105,563 kWh |
| Gross floor area | 69,625 sq ft |
| Source record | california:19356640:2024 |
The disclosure history
Year over year
| Year | Score | Δ | Site EUI | GHG emissions |
|---|---|---|---|---|
| 2024latest | 91 | +1 | 5.2 kBtu/ft² | 24 tCO₂e |
| 2023 | 90 | ±0 | 5.2 kBtu/ft² | 26 tCO₂e |
| 2022 | 90 | +1 | 5.3 kBtu/ft² | 26 tCO₂e |
| 2021 | 89 | 5.6 kBtu/ft² | 27 tCO₂e | |
| 2020 | — | — | — | |
| 2019 | — | — | — |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 9950 Mission Mill Road, Whittier
- City
- California
- State
- California
- ZIP
- 90601
- Coordinates
- 34.01841, -118.04980
Within ~1 km
Nearby benchmarked buildings
Distribution Center · 346,381 sq ft
Distribution Center · 304,708 sq ft
Non-Refrigerated Warehouse · 81,896 sq ft
Office · 77,227 sq ft
Office · 63,045 sq ft
Non-Refrigerated Warehouse · 54,640 sq ft
See also: most efficient in California · biggest emitters
How does 9950 Mission Mill Rd, Pico Rivera, Ca 90601 compare with other non-refrigerated warehouse buildings in California?
The latest disclosures cover 2,867 non-refrigerated warehouse buildings in California, out of 40,029 buildings citywide. 9950 Mission Mill Rd, Pico Rivera, Ca 90601's ENERGY STAR score of 91 compares with an average of 68 across the 2,227 that report a score; it scores higher than 68% of them and lower than 30%. Its site EUI of 5.2 kBtu/ft² is about 76% below the average of 21.7 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.3 kgCO₂e/ft² is about 76% below the group average of 1.4 kgCO₂e/ft².
At 69,625 sq ft, it is about 60% below the average floor area of 173,929 sq ft for those buildings. It was built in 1984, 4 years earlier than the group's average year built (1988). Across all 24 jurisdictions BuildingCensus covers, the 4,723 non-refrigerated warehouse buildings average an ENERGY STAR score of 66 and a site EUI of 26.0 kBtu/ft².
How has 9950 Mission Mill Rd, Pico Rivera, Ca 90601's energy performance changed over time?
BuildingCensus holds 6 California disclosures for 9950 Mission Mill Rd, Pico Rivera, Ca 90601, covering report years 2019–2024. Its ENERGY STAR score went from 89 in 2021 to 91 in 2024 (+2 points). Site EUI moved from 5.6 kBtu/ft² (2021) to 5.2 kBtu/ft² (2024), a 7% decrease. Reported emissions went from 27 tCO₂e to 24 tCO₂e over the same span (down 10%).
What does an ENERGY STAR score of 91 mean?
ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 91 means the building performs better than about 91% of its national peers. BuildingCensus bands the score into report-card grades; 91 falls in band A — high performer (85–100). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. 9950 Mission Mill Rd, Pico Rivera, Ca 90601's 5.2 kBtu/ft² across 69,625 sq ft works out to about 0.4 billion Btu (106 MWh-equivalent) in 2024. The disclosure also reports 105,563 kWh of electricity for the year.
Which law requires 9950 Mission Mill Rd, Pico Rivera, Ca 90601 to report its energy use?
9950 Mission Mill Rd, Pico Rivera, Ca 90601 reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:19356640:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More non-refrigerated warehouse buildings in California
- Bci Iv Otay Logistics Center - Bldg A - Btc I· 69,596 sq ft · score 15 (D)
- Ca - Sana· 69,587 sq ft · score 84 (B)
- 201 Business Park Drive - Rohnert Park - Us0075· 69,550 sq ft · score 86 (A)
- 1140 S Madera Ave - Simplot· 69,530 sq ft · score 15 (D)
- Ca - Paoa· 69,500 sq ft · score 75 (B)
- Bonelli Who Llc· 69,498 sq ft · score 80 (B)
- Non-Refrigerated Warehouse buildings in California· 2,867 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is 9950 Mission Mill Rd, Pico Rivera, Ca 90601's energy grade?
9950 Mission Mill Rd, Pico Rivera, Ca 90601 scores 91 out of 100 on ENERGY STAR — band A, high performer (85–100) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.
How much energy does 9950 Mission Mill Rd, Pico Rivera, Ca 90601 use?
Its 2024 site energy-use intensity was 5.2 kBtu/ft² across 69,625 sq ft, including 105,563 kWh of electricity.
What are 9950 Mission Mill Rd, Pico Rivera, Ca 90601's carbon emissions?
9950 Mission Mill Rd, Pico Rivera, Ca 90601 reported 24 tCO₂e of greenhouse-gas emissions (0.3 kgCO₂e/ft²) for 2024.
Where is 9950 Mission Mill Rd, Pico Rivera, Ca 90601?
9950 Mission Mill Rd, Pico Rivera, Ca 90601 is at 9950 Mission Mill Road, Whittier, in Whittier, California 90601. Its coordinates are 34.01841, -118.04980 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is 9950 Mission Mill Rd, Pico Rivera, Ca 90601 and when was it built?
9950 Mission Mill Rd, Pico Rivera, Ca 90601 has 69,625 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1984 as its year built. It is classed as non-refrigerated warehouse.
Is 9950 Mission Mill Rd, Pico Rivera, Ca 90601 covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “9950 Mission Mill Rd, Pico Rivera, Ca 90601, Whittier, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/9950-mission-mill-rd-pico-rivera-ca-90601-98616982 (data as of July 9, 2026).