Br44102-Parent
Distribution Center in California, CA · 2421 West 205Th Street, Torrance · 90501
At a glance
Br44102-Parent is a 147,220-square-foot distribution center at 2421 West 205Th Street, Torrance in Torrance, California, built in 1985. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 23.6 kBtu/ft² and 231 tCO₂e of greenhouse-gas emissions.
AB 802 (Public Resources Code §25402.10) · reporting year 2024
Benchmarking record
| Field | Value |
|---|---|
| ENERGY STAR score | — |
| Site EUI | 23.6 kBtu/ft² |
| Source EUI | — |
| GHG emissions | 231 tCO₂e |
| GHG intensity | 1.6 kgCO₂e/ft² |
| Electricity | 1,019,629 kWh |
| Gross floor area | 147,220 sq ft |
| Source record | california:29840744:2024 |
Compliance context
AB 802 (Public Resources Code §25402.10)
AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
Ownership
No owning organisation shown. Names of private individuals in the disclosure are not published here.
Own or manage this building? Claim it to correct the record and get compliance alerts.
Location
- Address
- 2421 West 205Th Street, Torrance
- City
- California
- State
- California
- ZIP
- 90501
- Coordinates
- 33.84587, -118.32635
Within ~1 km
Nearby benchmarked buildings
- Br46444-South Bay Dcscore 84
Non-Refrigerated Warehouse · 265,418 sq ft
- Btc Iii Gateway Lc Ii Lpscore 79
Distribution Center · 174,361 sq ft
- Pacific Gateway Iiscore —
Non-Refrigerated Warehouse · 174,361 sq ft
Office · 96,638 sq ft
Self-Storage Facility · 89,106 sq ft
- Ganahl Lumberscore 56
Retail Store · 86,000 sq ft
See also: most efficient in California · biggest emitters
How does Br44102-Parent compare with other distribution center buildings in California?
The latest disclosures cover 3,121 distribution center buildings in California, out of 40,029 buildings citywide. Its site EUI of 23.6 kBtu/ft² is about 19% above the average of 19.8 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 1.6 kgCO₂e/ft² is about 21% above the group average of 1.3 kgCO₂e/ft².
At 147,220 sq ft, it is about 38% below the average floor area of 238,298 sq ft for those buildings. It was built in 1985, 9 years earlier than the group's average year built (1994). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².
What does a site EUI of 23.6 kBtu/ft² mean?
Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Br44102-Parent's 23.6 kBtu/ft² across 147,220 sq ft works out to about 3.5 billion Btu (1,018 MWh-equivalent) in 2024. The disclosure also reports 1,019,629 kWh of electricity for the year.
Which law requires Br44102-Parent to report its energy use?
Br44102-Parent reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:29840744:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.
More distribution center buildings in California
- 15241-15277 Don Julian Road (Ab 802 Rexford)· 147,120 sq ft · score 80 (B)
- 200 Alondra Boulevard Llc· 147,059 sq ft · score 78 (B)
- San Fernando Business Center ? 1145· 147,019 sq ft · score 68 (C)
- San Fernando Business Center ? 1150· 147,000 sq ft · score 1 (D)
- Lax04401 - Arrow Ind Park 1· 146,900 sq ft · score 100 (A)
- Eba03602 - Union City 15· 146,880 sq ft · score 98 (A)
- Distribution Center buildings in California· 3,121 benchmarked
- All California benchmarked buildings· AB 802 (Public Resources Code §25402.10)
- Most efficient large buildings in California
- Least efficient large buildings in California
- Biggest emitters in California
Frequently asked questions
What is Br44102-Parent's energy grade?
Br44102-Parent did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 23.6 kBtu/ft².
How much energy does Br44102-Parent use?
Its 2024 site energy-use intensity was 23.6 kBtu/ft² across 147,220 sq ft, including 1,019,629 kWh of electricity.
What are Br44102-Parent's carbon emissions?
Br44102-Parent reported 231 tCO₂e of greenhouse-gas emissions (1.6 kgCO₂e/ft²) for 2024.
Where is Br44102-Parent?
Br44102-Parent is at 2421 West 205Th Street, Torrance, in Torrance, California 90501. Its coordinates are 33.84587, -118.32635 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.
How big is Br44102-Parent and when was it built?
Br44102-Parent has 147,220 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1985 as its year built. It is classed as distribution center.
Is Br44102-Parent covered by AB 802 (Public Resources Code §25402.10)?
Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).
Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.
About this data
Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.
Cite as: BuildingCensus, “Br44102-Parent, Torrance, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/br44102-parent-873b3246 (data as of July 9, 2026).