BuildingCensus
B

Btc Iii Gateway Lc Ii Lp

Distribution Center in California, CA · 538 Crenshaw Blvd., Torrance · 90503

At a glance

Btc Iii Gateway Lc Ii Lp is a 174,361-square-foot distribution center at 538 Crenshaw Blvd., Torrance in Torrance, California, built in 2014. In its 2022 California benchmarking disclosure it reported an ENERGY STAR score of 79 out of 100 (grade B), a site energy-use intensity of 7.6 kBtu/ft² and 91 tCO₂e of greenhouse-gas emissions. That score is higher than 50% of the 2,485 scored distribution center buildings in California.

ENERGY STAR score
79
band B · 2022
Site EUI
7.6
kBtu/ft²
GHG emissions
91
tCO₂e
GHG intensity
0.5
kgCO₂e/ft²
Floor area
174,361
sq ft
Year built
2014
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2022

Benchmarking record

FieldValue
ENERGY STAR score79 (band B)
Site EUI7.6 kBtu/ft²
Source EUI—
GHG emissions91 tCO₂e
GHG intensity0.5 kgCO₂e/ft²
Electricity387,293 kWh
Gross floor area174,361 sq ft
Source recordcalifornia:10819706:2022

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2022latest79+467.6 kBtu/ft²91 tCO₂e
202133-310.5 kBtu/ft²126 tCO₂e
20203610.0 kBtu/ft²105 tCO₂e
2019———
2018———

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
538 Crenshaw Blvd., Torrance
State
California
ZIP
90503
Coordinates
33.84298, -118.32644

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Btc Iii Gateway Lc Ii Lp compare with other distribution center buildings in California?

The latest disclosures cover 3,121 distribution center buildings in California, out of 40,029 buildings citywide. Btc Iii Gateway Lc Ii Lp's ENERGY STAR score of 79 compares with an average of 67 across the 2,485 that report a score; it scores higher than 50% of them and lower than 49%. Its site EUI of 7.6 kBtu/ft² is about 62% below the average of 19.8 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.5 kgCO₂e/ft² is about 62% below the group average of 1.3 kgCO₂e/ft².

At 174,361 sq ft, it is about 27% below the average floor area of 238,298 sq ft for those buildings. It was built in 2014, 20 years later than the group's average year built (1994). Across all 24 jurisdictions BuildingCensus covers, the 4,082 distribution center buildings average an ENERGY STAR score of 65 and a site EUI of 24.2 kBtu/ft².

How has Btc Iii Gateway Lc Ii Lp's energy performance changed over time?

BuildingCensus holds 5 California disclosures for Btc Iii Gateway Lc Ii Lp, covering report years 2018–2022. Its ENERGY STAR score went from 36 in 2020 to 79 in 2022 (+43 points). Site EUI moved from 10.0 kBtu/ft² (2020) to 7.6 kBtu/ft² (2022), a 24% decrease. Reported emissions went from 105 tCO₂e to 91 tCO₂e over the same span (down 14%).

What does an ENERGY STAR score of 79 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 79 means the building performs better than about 79% of its national peers. BuildingCensus bands the score into report-card grades; 79 falls in band B — above median (70–84). Scores of 75 or higher meet the threshold for ENERGY STAR certification; certification itself is a separate, verified application that the disclosure does not record. In California, 65% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Btc Iii Gateway Lc Ii Lp's 7.6 kBtu/ft² across 174,361 sq ft works out to about 1.3 billion Btu (388 MWh-equivalent) in 2022. The disclosure also reports 387,293 kWh of electricity for the year.

Which law requires Btc Iii Gateway Lc Ii Lp to report its energy use?

Btc Iii Gateway Lc Ii Lp reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2022 disclosure (source record california:10819706:2022). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More distribution center buildings in California

Frequently asked questions

What is Btc Iii Gateway Lc Ii Lp's energy grade?

Btc Iii Gateway Lc Ii Lp scores 79 out of 100 on ENERGY STAR — band B, above median (70–84) — in its 2022 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Btc Iii Gateway Lc Ii Lp use?

Its 2022 site energy-use intensity was 7.6 kBtu/ft² across 174,361 sq ft, including 387,293 kWh of electricity.

What are Btc Iii Gateway Lc Ii Lp's carbon emissions?

Btc Iii Gateway Lc Ii Lp reported 91 tCO₂e of greenhouse-gas emissions (0.5 kgCO₂e/ft²) for 2022.

Where is Btc Iii Gateway Lc Ii Lp?

Btc Iii Gateway Lc Ii Lp is at 538 Crenshaw Blvd., Torrance, in Torrance, California 90503. Its coordinates are 33.84298, -118.32644 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Btc Iii Gateway Lc Ii Lp and when was it built?

Btc Iii Gateway Lc Ii Lp has 174,361 sq ft of gross floor area, as reported in its 2022 disclosure. The disclosure lists 2014 as its year built. It is classed as distribution center.

Is Btc Iii Gateway Lc Ii Lp covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2022 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Btc Iii Gateway Lc Ii Lp, Torrance, California — 2022 benchmarking disclosure”, https://buildingcensus.com/buildings/california/btc-iii-gateway-lc-ii-lp-a7256920 (data as of July 9, 2026).