BuildingCensus
–

Cnr-Czu Ben Lomond Cc #45 Solar

Mixed Use Property in California, CA · 13575 Empire Grade, Santa Cruz · 95060

At a glance

Cnr-Czu Ben Lomond Cc #45 Solar is a 63,777-square-foot mixed use property building at 13575 Empire Grade, Santa Cruz in Santa Cruz, California, built in 1956. In its 2024 California benchmarking disclosure it reported a site energy-use intensity of 11.9 kBtu/ft² and 44 tCO₂e of greenhouse-gas emissions.

ENERGY STAR score
—
not reported · 2024
Site EUI
11.9
kBtu/ft²
GHG emissions
44
tCO₂e
GHG intensity
0.7
kgCO₂e/ft²
Floor area
63,777
sq ft
Year built
1956
vintage
◆ Loading map…
85–10070–8455–691–54
Location

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score—
Site EUI11.9 kBtu/ft²
Source EUI—
GHG emissions44 tCO₂e
GHG intensity0.7 kgCO₂e/ft²
Electricity86,275 kWh
Gross floor area63,777 sq ft
Source recordcalifornia:3939941:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest—11.9 kBtu/ft²44 tCO₂e
2022———

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
13575 Empire Grade, Santa Cruz
State
California
ZIP
95060
Coordinates
37.13139, -122.16879

Within ~1 km

Nearby benchmarked buildings

No other benchmarked buildings within ~1 km.

See also: most efficient in California · biggest emitters

How does Cnr-Czu Ben Lomond Cc #45 Solar compare with other mixed use property buildings in California?

The latest disclosures cover 294 mixed use property buildings in California, out of 40,029 buildings citywide. Its site EUI of 11.9 kBtu/ft² is about 83% below the average of 70.9 kBtu/ft² — it uses less energy per square foot than the typical building in that group. Its emissions intensity of 0.7 kgCO₂e/ft² is about 84% below the group average of 4.3 kgCO₂e/ft².

At 63,777 sq ft, it is about 68% below the average floor area of 200,559 sq ft for those buildings. It was built in 1956, 28 years earlier than the group's average year built (1984). Across all 24 jurisdictions BuildingCensus covers, the 1,212 mixed use property buildings average an ENERGY STAR score of 69 and a site EUI of 79.8 kBtu/ft².

How has Cnr-Czu Ben Lomond Cc #45 Solar's energy performance changed over time?

BuildingCensus holds 2 California disclosures for Cnr-Czu Ben Lomond Cc #45 Solar, covering report years 2022, 2024. Only one of those years carries energy figures.

What does a site EUI of 11.9 kBtu/ft² mean?

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Cnr-Czu Ben Lomond Cc #45 Solar's 11.9 kBtu/ft² across 63,777 sq ft works out to about 0.8 billion Btu (222 MWh-equivalent) in 2024. The disclosure also reports 86,275 kWh of electricity for the year.

Which law requires Cnr-Czu Ben Lomond Cc #45 Solar to report its energy use?

Cnr-Czu Ben Lomond Cc #45 Solar reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:3939941:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More mixed use property buildings in California

Frequently asked questions

What is Cnr-Czu Ben Lomond Cc #45 Solar's energy grade?

Cnr-Czu Ben Lomond Cc #45 Solar did not report an ENERGY STAR score in its 2024 disclosure, but its site energy-use intensity was 11.9 kBtu/ft².

How much energy does Cnr-Czu Ben Lomond Cc #45 Solar use?

Its 2024 site energy-use intensity was 11.9 kBtu/ft² across 63,777 sq ft, including 86,275 kWh of electricity.

What are Cnr-Czu Ben Lomond Cc #45 Solar's carbon emissions?

Cnr-Czu Ben Lomond Cc #45 Solar reported 44 tCO₂e of greenhouse-gas emissions (0.7 kgCO₂e/ft²) for 2024.

Where is Cnr-Czu Ben Lomond Cc #45 Solar?

Cnr-Czu Ben Lomond Cc #45 Solar is at 13575 Empire Grade, Santa Cruz, in Santa Cruz, California 95060. Its coordinates are 37.13139, -122.16879 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Cnr-Czu Ben Lomond Cc #45 Solar and when was it built?

Cnr-Czu Ben Lomond Cc #45 Solar has 63,777 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1956 as its year built. It is classed as mixed use property.

Is Cnr-Czu Ben Lomond Cc #45 Solar covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Cnr-Czu Ben Lomond Cc #45 Solar, Santa Cruz, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/cnr-czu-ben-lomond-cc-45-solar-51e9a97f (data as of July 9, 2026).