BuildingCensus
D

Maxlinear, Inc. San Jose

Office in California, CA · 1060 Rincon Circle, San Jose · 95131

At a glance

Maxlinear, Inc. San Jose is a 62,053-square-foot office building at 1060 Rincon Circle, San Jose in San Jose, California, built in 1984. In its 2024 California benchmarking disclosure it reported an ENERGY STAR score of 31 out of 100 (grade D), a site energy-use intensity of 70.3 kBtu/ft² and 270 tCO₂e of greenhouse-gas emissions. That score is higher than 9% of the 4,912 scored office buildings in California.

ENERGY STAR score
31
band D · 2024
Site EUI
70.3
kBtu/ft²
GHG emissions
270
tCO₂e
GHG intensity
4.3
kgCO₂e/ft²
Floor area
62,053
sq ft
Year built
1984
vintage
◆ Loading map…
85–10070–8455–691–54
This entry + 6 nearby

AB 802 (Public Resources Code §25402.10) · reporting year 2024

Benchmarking record

FieldValue
ENERGY STAR score31 (band D)
Site EUI70.3 kBtu/ft²
Source EUI—
GHG emissions270 tCO₂e
GHG intensity4.3 kgCO₂e/ft²
Electricity931,545 kWh
Gross floor area62,053 sq ft
Source recordcalifornia:28604905:2024

The disclosure history

Year over year

YearScoreΔSite EUIGHG emissions
2024latest3170.3 kBtu/ft²270 tCO₂e
2022—81.4 kBtu/ft²336 tCO₂e

Compliance context

AB 802 (Public Resources Code §25402.10)

AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

Program details →

Ownership

No owning organisation shown. Names of private individuals in the disclosure are not published here.

Own or manage this building? Claim it to correct the record and get compliance alerts.

Location

Address
1060 Rincon Circle, San Jose
State
California
ZIP
95131
Coordinates
37.39857, -121.91131

Within ~1 km

Nearby benchmarked buildings

See also: most efficient in California · biggest emitters

How does Maxlinear, Inc. San Jose compare with other office buildings in California?

The latest disclosures cover 6,214 office buildings in California, out of 40,029 buildings citywide. Maxlinear, Inc. San Jose's ENERGY STAR score of 31 compares with an average of 75 across the 4,912 that report a score; it scores higher than 9% of them and lower than 90%. Its site EUI of 70.3 kBtu/ft² is about 25% above the average of 56.4 kBtu/ft² — it uses more energy per square foot than the typical building in that group. Its emissions intensity of 4.3 kgCO₂e/ft² is about 21% above the group average of 3.6 kgCO₂e/ft².

At 62,053 sq ft, it is about 59% below the average floor area of 151,937 sq ft for those buildings. Its 1984 construction date is close to the group's average year built (1985). Across all 24 jurisdictions BuildingCensus covers, the 15,264 office buildings average an ENERGY STAR score of 73 and a site EUI of 59.3 kBtu/ft².

How has Maxlinear, Inc. San Jose's energy performance changed over time?

BuildingCensus holds 2 California disclosures for Maxlinear, Inc. San Jose, covering report years 2022, 2024. Site EUI moved from 81.4 kBtu/ft² (2022) to 70.3 kBtu/ft² (2024), a 14% decrease. Reported emissions went from 336 tCO₂e to 270 tCO₂e over the same span (down 20%).

What does an ENERGY STAR score of 31 mean?

ENERGY STAR scores run from 1 to 100 and are computed by the EPA's Portfolio Manager as a percentile against similar buildings nationwide, adjusted for climate, size and use: a score of 31 means the building performs better than about 31% of its national peers. BuildingCensus bands the score into report-card grades; 31 falls in band D — lowest band (1–54). It sits 44 points below 75, the threshold for ENERGY STAR certification. In California, 65% of scored buildings are at 75 or above.

Site energy-use intensity (EUI) is the energy a building uses on site in a year divided by its floor area, in thousand Btu per square foot — lower is more efficient. Maxlinear, Inc. San Jose's 70.3 kBtu/ft² across 62,053 sq ft works out to about 4.4 billion Btu (1,278 MWh-equivalent) in 2024. The disclosure also reports 931,545 kWh of electricity for the year.

Which law requires Maxlinear, Inc. San Jose to report its energy use?

Maxlinear, Inc. San Jose reports under AB 802 (Public Resources Code §25402.10), the legal basis of California's Building Energy Benchmarking Program (statewide), which publishes each covered building's annual benchmarking results. The record shown here is the report-year 2024 disclosure (source record california:28604905:2024). AB 802 requires every California commercial building over 50,000 sq ft to report energy use to the CEC annually; the CEC publicly discloses the results statewide.

More office buildings in California

Frequently asked questions

What is Maxlinear, Inc. San Jose's energy grade?

Maxlinear, Inc. San Jose scores 31 out of 100 on ENERGY STAR — band D, lowest band (1–54) — in its 2024 California disclosure. Scores are national percentiles against similar buildings; 75+ qualifies for ENERGY STAR certification.

How much energy does Maxlinear, Inc. San Jose use?

Its 2024 site energy-use intensity was 70.3 kBtu/ft² across 62,053 sq ft, including 931,545 kWh of electricity.

What are Maxlinear, Inc. San Jose's carbon emissions?

Maxlinear, Inc. San Jose reported 270 tCO₂e of greenhouse-gas emissions (4.3 kgCO₂e/ft²) for 2024.

Where is Maxlinear, Inc. San Jose?

Maxlinear, Inc. San Jose is at 1060 Rincon Circle, San Jose, in San Jose, California 95131. Its coordinates are 37.39857, -121.91131 (latitude, longitude), as published in the Building Energy Benchmarking Program (statewide) file.

How big is Maxlinear, Inc. San Jose and when was it built?

Maxlinear, Inc. San Jose has 62,053 sq ft of gross floor area, as reported in its 2024 disclosure. The disclosure lists 1984 as its year built. It is classed as office.

Is Maxlinear, Inc. San Jose covered by AB 802 (Public Resources Code §25402.10)?

Yes — it appears in the 2024 Building Energy Benchmarking Program (statewide) disclosure, which lists the buildings reporting under AB 802 (Public Resources Code §25402.10).

Working with California building benchmarking records? Pro adds alerts, change history and CSV export ($49/mo); Enterprise adds full national files, the API and an MCP server for AI tools.

About this data

Source: Building Energy Benchmarking Program (statewide) (AB 802 (Public Resources Code §25402.10)), as published July 9, 2026. See the methodology for how records are matched, cleaned and scored.

Cite as: BuildingCensus, “Maxlinear, Inc. San Jose, San Jose, California — 2024 benchmarking disclosure”, https://buildingcensus.com/buildings/california/maxlinear-inc-san-jose-741b1b02 (data as of July 9, 2026).